Garage Conversion ADU in Westwood Lakes: What It Costs and How It Works
A garage conversion ADU in Westwood Lakes typically runs $45,000 – $130,000 and takes 3 to 5 months from permit to final inspection. You’re turning an attached garage into a permitted, livable unit: new slab or raised floor, framing and insulation, a full bathroom and kitchenette, electrical and plumbing, impact glazing, and a separate entry. Most conversions here land in the $60,000 – $85,000 range once you add a bath and kitchenette. Call (844) 761-9356 to schedule a free on-site estimate and get a written line-item scope for a garage conversion ADU in Westwood Lakes.
How a Garage Conversion ADU Comes Together, Stage by Stage
Every garage conversion follows the same sequence. What changes is how much of the existing structure we can keep and how much Miami-Dade County makes us bring up to current code. Here’s the real order of work and what you’ll be deciding at each point.
- Day 1 – 3: Feasibility and design. We measure the garage, check ceiling height and slab condition, and confirm where the unit connects to the house and how the entry works. You decide the layout: studio versus one-bedroom, bath placement, and whether the kitchenette shares a wall with the main house plumbing. Impact windows and doors get selected early because they drive lead times.
- Day 3 – 14: Permits. A conversion needs a building permit, and in a CBS home that also means an electrical and plumbing permit plus a separate inspection path. Miami-Dade’s review can take two to six weeks depending on the scope sheet. You’ll approve the sealed drawings before we submit.
- Week 2 – 5: Demo and shell. Out comes the overhead door, the old slab coating, and any termite-damaged framing. We frame the new wall where the garage door was, set the raised floor system (a real consideration on low-lying lots), and rough in the bathroom drain lines and the electrical panel feed.
- Week 5 – 10: Rough-in and inspection. Plumbing, electrical, and mechanical rough-ins get inspected before a single board of drywall goes up. This is the stage where homeowners pick interior finishes: flooring, cabinets, tile, fixtures. We hand you a selection sheet with real options and prices, not a vague allowance.
- Week 10 – 18: Finish and final walkthrough. Insulation, drywall, texture, paint, cabinets, tile, trim, and impact glazing. Final inspection, then your certificate of occupancy. You decide the last details (hardware, paint color, appliance package) around week 12 so nothing stalls the finish.
The full build phase is fast when the permits are clean. Most of the calendar time is county review, not hammering.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Garage Conversion ADU
A garage conversion is a series of trade-offs. These are the ones that actually move the outcome and the budget.
- Floor system: slab-on-grade vs. raised wood frame. A raised frame with a vapor barrier handles Westwood Lakes’ low elevation and summer water table better, but it adds roughly $4,000 – $9,000 and eats 8 – 12 inches of ceiling height. On lots that flood, it’s worth it.
- Impact glazing: full impact vs. shutter-covered openings. Full impact windows and doors in the converted unit cost more up front but eliminate storm-prep hassle and typically satisfy the wind-code review cleanly. James Hardie siding panels on the new exterior wall hold up to sun and rain better than standard stucco patching.
- Kitchenette grade: stock vs. semi-custom. A small sink, two-burner cooktop, and 24-inch fridge is the standard rental-grade package. KraftMaid and Wellborn cabinetry moves you into a unit that rents or houses family long-term; it also raises the ticket by several thousand.
- Bathroom layout: wet-wall shared vs. relocated. Keeping the new bath against the wall shared with the main house keeps the drain lines short and cheap. Pushing the bath to the far corner means cutting the slab and running new drains, which is one of the biggest cost swingers on this job.
- Entry and privacy. An exterior side-door entry keeps the ADU separate and rentable. A shared interior door creates a mother-in-law suite but ties the unit to the main house.
Homeowners often pair the unit’s finishes with Cabinets & Countertops in Westwood Lakes and Backsplash, Tile & Flooring in Westwood Lakes, since the kitchenette and bath need the same material decisions.
What a Garage Conversion ADU Costs in Westwood Lakes, FL
Plan on $45,000 – $130,000 for a garage conversion ADU in Westwood Lakes. The low end is a straightforward studio with a half-bath, no plumbing relocation, and stock finishes. The high end is a full one-bedroom with a kitchenette, a relocated bath, impact glazing all around, and semi-custom cabinetry. Here’s how the number breaks down:
- Shell, framing, and impact wall/door: $12,000 – $30,000
- Floor system (raised or slab prep): $4,000 – $9,000
- Bathroom and kitchenette rough-in plus fixtures: $8,000 – $22,000
- Electrical panel, circuits, and lighting: $4,000 – $9,000
- Insulation, drywall, texture, and paint: $6,000 – $15,000
- Cabinetry, counters, tile, and flooring: $8,000 – $25,000
- Permits, drawings, and inspection fees: $3,000 – $7,000
Five things push a job toward the high end: adding a bathroom where there wasn’t one, relocating the plumbing wall, raising the floor against flood elevation, upgrading to top-tier cabinetry, and any discovered termite or roof-wall damage. Our upfront pricing means the number you see on the written estimate is the number you pay, and we back the work with the 730-Day Done Right Promise. 0% financing for 18 months and $1,000 off projects over $10,000 help on a job this size. Estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhy Westwood Lakes Garages Convert Differently
Westwood Lakes is a built-out, post-war suburb, so a garage conversion here is almost always a renovation inside a 1950s – 1970s CBS home, not a new build. That changes the job in specific ways. The garages were framed into a concrete-block shell with a low or flat roof, and after heavy summer downpours those roof-wall junctions and old jalousie frames are exactly where hidden water intrusion shows up. We check those first, before we quote, because a wet wall behind your new bathroom is a problem worth catching on day one. The housing stock also means original terrazzo floors and a slab that may need attention for a raised floor system. Miami-Dade County’s 40-year recertification and post-Surfside inspection rules mean any structural change to the shell gets reviewed under current wind and flood code, and the area’s low elevation just west of the urban core turns floor height into a real design decision. We pull the permits and pass the inspections on the garage conversion, and if the scope grows into something bigger, it’s part of a full Home Additions & ADU in Westwood Lakes conversation. Our technicians have up to 12 years of experience, and we cover Westwood Lakes along with nearby Sunset, Tamiami, Kendale Lakes, and Kendall.
Serving Westwood Lakes, FL – Our Local Coverage Area
We serve Westwood Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in Westwood Lakes
Most garage conversion ADU projects in Westwood Lakes take 3 to 5 months from signed contract to certificate of occupancy. Permit review is the long pole at two to six weeks; the build itself is usually 8 to 12 weeks. Call (844) 761-9356 for a timeline built around your specific garage.
Yes. A garage conversion ADU in Westwood Lakes requires a Miami-Dade County building permit plus electrical and plumbing permits, and the unit needs a certificate of occupancy before anyone lives in it. We pull the permits and pass the inspections. Call for a free estimate and we’ll walk you through the review path.
Often yes. Keeping the new bathroom against the wall shared with the main house avoids cutting the slab and running new drains, which keeps the project toward the low end. A far-corner bath or a layout change to the CBS shell adds cost. We’ll tell you which layout your garage supports on the estimate visit.
Garage conversion ADU pricing in Westwood Lakes runs $45,000 – $130,000, with most projects landing between $60,000 and $85,000. Bath placement, floor height, impact glazing, and cabinet grade are the biggest swingers. Call (844) 761-9356 for an exact quote – estimates are free.
Every garage conversion ADU we build is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. Calls are answered by a live person 24/7, and background-checked, uniformed technicians handle the work. Ask about the written warranty terms on your estimate call.
Get a Free On-Site Estimate for Your Garage Conversion ADU
Turning a Westwood Lakes garage into a permitted living unit is a real project with real numbers, and you should see those numbers before you commit. Call (844) 761-9356 for a free on-site estimate on your garage conversion ADU in Westwood Lakes. A live person answers around the clock. On the call we’ll set a time, review your layout and budget, and hand you a written line-item quote backed by our Home Additions & ADU service. From foundation to finish line, built to last and backed in writing.
Written by the team at Groundwork Construction Co.