A Groundwork company - serving The Hammocks, FL
Garage Conversion ADU in Sunset, FL | Groundwork Construction Co. of The Hammocks

Garage Conversion ADU in Sunset - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Sunset: What It Costs and How Long It Takes

A garage conversion ADU in Sunset runs $45,000-$130,000 for the full build, and most projects take 3 to 5 months from permit application to final inspection. The work means turning an existing attached or detached garage into legal living space: new slab or floor system, framed walls with insulation, electrical and plumbing, HVAC, a bathroom and kitchenette, and the county sign-off that makes it rentable or family-ready. Call (844) 761-9356 to schedule a free on-site estimate with a written, line-item scope.

Call (844) 761-9356

How a Garage Conversion Goes From Bare Concrete to Finished ADU

Every conversion follows the same sequence. Here’s what actually happens, and where your decisions land.

Stage 1: Feasibility and site check (week 1)

We measure the garage, check the slab for cracking and moisture, and look at the ceiling structure and roof above. We confirm whether the existing electrical panel can carry a full apartment or needs an upgrade, and whether there’s a viable route for plumbing to a new bathroom. You decide at this point whether the unit is a rental, an in-law suite, or a home office with a half bath, because that choice drives everything downstream.

Stage 2: Drawings and permits (weeks 2-8)

We produce the plans and submit to Miami-Dade County’s Unincorporated Municipal Services (UMS) for review. This is the slowest stage and the one that catches out-of-area builders. You review and approve the layout and finish selections while we’re in review. Nothing gets built before the permit is issued.

Stage 3: Demo and rough-in (weeks 9-13)

The garage door comes out and gets framed and closed in. We pour or level the floor, frame interior walls, run electrical, plumbing, and HVAC ducting or a mini-split line set. The county inspects rough framing, electrical, and plumbing at this stage. You choose fixture rough-in locations now, before drywall goes up.

Stage 4: Insulation, drywall, and finishes (weeks 14-19)

Insulation, drywall, texture, paint, flooring, cabinets, and the bathroom tile all happen here. We install the kitchenette, set fixtures, and connect the unit to the main house systems. This is where the job starts to look like a home.

Stage 5: Final inspection and walkthrough (weeks 20-22)

The county does its final inspection, and we do a walkthrough with you. We don’t call the job done until it passes and you’ve seen every switch, drain, and door operate. Then the 730-Day Done Right Promise starts running.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

The scope is the same on every conversion. The money and the feel of the finished space come from these choices.

  • Floor system: a finished slab is the cheapest route and works when the slab is sound. A raised framed floor costs more but fixes drainage and gives you a warmer surface that handles moisture better, which matters in Sunset.
  • HVAC: extending the main house system is cheaper upfront but shares your thermostat and load. A dedicated mini-split costs more and runs independently, which is what you want for a tenant.
  • Kitchenette grade: a compact wet bar with a sink and fridge runs to a full L-shaped kitchenette with a cooktop. You pick door style and counter here. Therma-Tru doors are a solid option for the exterior entry because they hold up to humidity.
  • Windows and glazing: impact-rated units cost more than standard but meet wind-load code and cut your insurance, and this is the upgrade most Sunset owners take.
  • Bathroom scope: a half bath versus a full bath with a walk-in shower moves the number more than any finish choice. Full bath means more plumbing, more tile, more venting.
  • Exterior door and entry: a simple single door versus a glazed entry. ViewLux or a similar glazed unit gives you light into the unit but is a bigger-ticket item than a solid door.

What Garage Conversion ADU Costs in Sunset, FL

Plan on $45,000-$130,000. Here’s what moves a job toward the low or high end.

  • Garage size and configuration: a single-car garage at the low end, a double or oversized garage with a bathroom and kitchen at the high end.
  • Condition of the slab and structure: a cracked, settled, or moisture-weeping slab means repair before you build on it.
  • Moving plumbing and electrical: putting a bathroom on the far side of the garage from the house’s stack costs more than backing it up to the existing plumbing wall.
  • Panel capacity: a panel that can’t carry the new load means an upgrade, which adds to the electrical line item.
  • Material grade: builder-grade cabinets and LVP flooring versus custom cabinetry and tile throughout.
  • Impact glazing and roofing tie-ins: if the garage roof needs a retrofit or the door opening needs a new header and impact-rated window-wall, that adds scope.

A written estimate from us lists each of these lines with a price, so you see exactly where your number lands. Upfront pricing, no surprises: the number you see is the number you pay, and projects over $10,000 get $1,000 off. We also offer 0% financing for 18 months.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunset Homes Specifically Do to a Garage Conversion

Sunset is unincorporated Miami-Dade, which means your permit and every inspection go through the county’s UMS, not a city building department. That’s a scheduling rhythm out-of-area builders don’t know, and it can add weeks to a timeline that looked fine on paper. The housing stock is the other half of it. Most of the homes we work on in Sunset were built in the 1950s through the 1970s, before the 1994 Florida Building Code, so a garage conversion here is usually a code-upgrade job as much as a build. We regularly find original single-pane windows, carports that were enclosed without permits, and flat or low-pitch roofs that need to be tied into the new framed walls and made wind-load compliant. The 33173 ZIP has a lot of these mid-century blocks. And because the ground is flat and low, heavy summer rain can pool against a garage slab, so we check drainage and waterproofing before we pour or frame anything. If your conversion turns out to be part of a full Home Additions & ADU in Sunset plan, we scope it that way from the start so the two pieces line up.

Serving Sunset, FL – Our Local Coverage Area

We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Sunset

Get a Free Estimate for Your Sunset Garage Conversion

We’ll come out, measure the garage, check the slab and panel, and give you a written scope with a price that doesn’t move. When you call, a live person answers, day or night, and we’ll set a time that works for you. Reach us at (844) 761-9356. Homeowners across Sunset and the neighboring blocks in Westwood Lakes and Kendall call us for this exact job, and we’re glad to walk you through what your garage can become. Many also pair a conversion with Cabinets & Countertops in Sunset or Backsplash, Tile & Flooring in Sunset to finish the unit, and our Home Additions & ADU team handles the wider planning if your project grows. From foundation to finish line, we build it and back it in writing.

Written by the team at Groundwork Construction Co.

Why Sunset Chooses Groundwork Construction Co. of The Hammocks

We set the standard for garage conversion ADU in Sunset.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunset

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunset Customers Say

Trusted by homeowners across Sunset and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in Sunset?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunset.

(844) 761-9356

Request a Free Estimate in Sunset

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch