Garage Conversion ADU in Sunset: What It Costs and How Long It Takes
A garage conversion ADU in Sunset runs $45,000-$130,000 for the full build, and most projects take 3 to 5 months from permit application to final inspection. The work means turning an existing attached or detached garage into legal living space: new slab or floor system, framed walls with insulation, electrical and plumbing, HVAC, a bathroom and kitchenette, and the county sign-off that makes it rentable or family-ready. Call (844) 761-9356 to schedule a free on-site estimate with a written, line-item scope.
How a Garage Conversion Goes From Bare Concrete to Finished ADU
Every conversion follows the same sequence. Here’s what actually happens, and where your decisions land.
Stage 1: Feasibility and site check (week 1)
We measure the garage, check the slab for cracking and moisture, and look at the ceiling structure and roof above. We confirm whether the existing electrical panel can carry a full apartment or needs an upgrade, and whether there’s a viable route for plumbing to a new bathroom. You decide at this point whether the unit is a rental, an in-law suite, or a home office with a half bath, because that choice drives everything downstream.
Stage 2: Drawings and permits (weeks 2-8)
We produce the plans and submit to Miami-Dade County’s Unincorporated Municipal Services (UMS) for review. This is the slowest stage and the one that catches out-of-area builders. You review and approve the layout and finish selections while we’re in review. Nothing gets built before the permit is issued.
Stage 3: Demo and rough-in (weeks 9-13)
The garage door comes out and gets framed and closed in. We pour or level the floor, frame interior walls, run electrical, plumbing, and HVAC ducting or a mini-split line set. The county inspects rough framing, electrical, and plumbing at this stage. You choose fixture rough-in locations now, before drywall goes up.
Stage 4: Insulation, drywall, and finishes (weeks 14-19)
Insulation, drywall, texture, paint, flooring, cabinets, and the bathroom tile all happen here. We install the kitchenette, set fixtures, and connect the unit to the main house systems. This is where the job starts to look like a home.
Stage 5: Final inspection and walkthrough (weeks 20-22)
The county does its final inspection, and we do a walkthrough with you. We don’t call the job done until it passes and you’ve seen every switch, drain, and door operate. Then the 730-Day Done Right Promise starts running.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
The scope is the same on every conversion. The money and the feel of the finished space come from these choices.
- Floor system: a finished slab is the cheapest route and works when the slab is sound. A raised framed floor costs more but fixes drainage and gives you a warmer surface that handles moisture better, which matters in Sunset.
- HVAC: extending the main house system is cheaper upfront but shares your thermostat and load. A dedicated mini-split costs more and runs independently, which is what you want for a tenant.
- Kitchenette grade: a compact wet bar with a sink and fridge runs to a full L-shaped kitchenette with a cooktop. You pick door style and counter here. Therma-Tru doors are a solid option for the exterior entry because they hold up to humidity.
- Windows and glazing: impact-rated units cost more than standard but meet wind-load code and cut your insurance, and this is the upgrade most Sunset owners take.
- Bathroom scope: a half bath versus a full bath with a walk-in shower moves the number more than any finish choice. Full bath means more plumbing, more tile, more venting.
- Exterior door and entry: a simple single door versus a glazed entry. ViewLux or a similar glazed unit gives you light into the unit but is a bigger-ticket item than a solid door.
What Garage Conversion ADU Costs in Sunset, FL
Plan on $45,000-$130,000. Here’s what moves a job toward the low or high end.
- Garage size and configuration: a single-car garage at the low end, a double or oversized garage with a bathroom and kitchen at the high end.
- Condition of the slab and structure: a cracked, settled, or moisture-weeping slab means repair before you build on it.
- Moving plumbing and electrical: putting a bathroom on the far side of the garage from the house’s stack costs more than backing it up to the existing plumbing wall.
- Panel capacity: a panel that can’t carry the new load means an upgrade, which adds to the electrical line item.
- Material grade: builder-grade cabinets and LVP flooring versus custom cabinetry and tile throughout.
- Impact glazing and roofing tie-ins: if the garage roof needs a retrofit or the door opening needs a new header and impact-rated window-wall, that adds scope.
A written estimate from us lists each of these lines with a price, so you see exactly where your number lands. Upfront pricing, no surprises: the number you see is the number you pay, and projects over $10,000 get $1,000 off. We also offer 0% financing for 18 months.
See the difference
Before
After
Before
After
Before
AfterWhat Sunset Homes Specifically Do to a Garage Conversion
Sunset is unincorporated Miami-Dade, which means your permit and every inspection go through the county’s UMS, not a city building department. That’s a scheduling rhythm out-of-area builders don’t know, and it can add weeks to a timeline that looked fine on paper. The housing stock is the other half of it. Most of the homes we work on in Sunset were built in the 1950s through the 1970s, before the 1994 Florida Building Code, so a garage conversion here is usually a code-upgrade job as much as a build. We regularly find original single-pane windows, carports that were enclosed without permits, and flat or low-pitch roofs that need to be tied into the new framed walls and made wind-load compliant. The 33173 ZIP has a lot of these mid-century blocks. And because the ground is flat and low, heavy summer rain can pool against a garage slab, so we check drainage and waterproofing before we pour or frame anything. If your conversion turns out to be part of a full Home Additions & ADU in Sunset plan, we scope it that way from the start so the two pieces line up.
Serving Sunset, FL – Our Local Coverage Area
We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in Sunset
Most conversions take 3 to 5 months from permit submission to final inspection, with the county review eating the largest single chunk. The construction itself runs about 10 to 14 weeks once the permit is in hand. Call (844) 761-9356 for an exact timeline for your garage.
Yes, always. Because Sunset is unincorporated, the permit and inspections go through Miami-Dade County’s UMS. A conversion changes the use of the space and adds plumbing, electrical, and habitable square footage, all of which require review. We pull the permits and schedule the inspections for you.
Often yes. If the bathroom backs up to the house’s existing plumbing wall and the slab is sound, you avoid the biggest cost drivers. A half bath or kitchenette-only layout stays on the low end of the $45,000-$130,000 range. We confirm feasibility during the site check before anything is committed.
A full conversion runs $45,000-$130,000 depending on garage size, slab and panel condition, bathroom and kitchenette scope, and finish grade. Impact glazing and roof tie-ins push the number up. Call (844) 761-9356 for a written, line-item estimate. Estimates are free.
Every garage conversion we build is covered by the 730-Day Done Right Promise: if it isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing. Our technicians have up to 12 years of experience, and they’re background-checked and arrive in uniform.
Get a Free Estimate for Your Sunset Garage Conversion
We’ll come out, measure the garage, check the slab and panel, and give you a written scope with a price that doesn’t move. When you call, a live person answers, day or night, and we’ll set a time that works for you. Reach us at (844) 761-9356. Homeowners across Sunset and the neighboring blocks in Westwood Lakes and Kendall call us for this exact job, and we’re glad to walk you through what your garage can become. Many also pair a conversion with Cabinets & Countertops in Sunset or Backsplash, Tile & Flooring in Sunset to finish the unit, and our Home Additions & ADU team handles the wider planning if your project grows. From foundation to finish line, we build it and back it in writing.
Written by the team at Groundwork Construction Co.