A Groundwork company - serving The Hammocks, FL
Garage Conversion ADU in Richmond Heights, FL | Groundwork Construction Co. of The Hammocks

Garage Conversion ADU in Richmond Heights - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Richmond Heights, FL: What It Takes and What It Costs

A garage conversion ADU in Richmond Heights, FL typically runs $45,000 – $130,000 and takes 4 – 7 months from first demo to final inspection, depending on whether you’re adding a full kitchen and bath or a studio suite. The work turns an existing garage footprint into a permitted, livable unit: new floor build-up over the slab, framing for interior partitions, plumbing and electrical rough-in, impact-rated glazing where new openings go in, and a full close-out inspection before anyone moves in. Call (844) 761-9356 to schedule a free on-site estimate.

Call (844) 761-9356

Here’s the honest split: a straight studio conversion with a half bath and kitchenette lands in the $45,000 – $80,000 band. A one-bedroom with a full bath, dedicated laundry, and full kitchen runs to the top of the range. What pushes you one way or the other is almost always the slab and the drain lines, not the finishes. If the garage floor sits lower than the house, you’re building up; if the existing drain field is undersized or the garage sits on the limestone that runs close to the surface across this part of 33176, excavation costs climb before a single cabinet goes in.

How a Garage Conversion ADU Comes Together, Stage by Stage

Stage 1: Site walk and permit drawings (2 – 4 weeks). We measure the existing slab, note the ceiling height under the trusses, confirm whether the garage wall is load-bearing, and check where the panel sits relative to the new kitchen and bath. You decide at this stage whether the unit is a studio, a one-bedroom, or a two-bedroom, and that decision drives the drawing set. Your decisions: layout, entry point, whether the garage door becomes a window wall or gets infilled with James Hardie siding to match the house.

Stage 2: Demolition and slab work (3 – 7 days). Out come the old garage door, tracks, opener, and any shelving. If the slab is cracked or the floor needs build-up for plumbing, this is where the concrete saw and breaker come out. In Richmond Heights that can mean hitting rock earlier than expected, so we budget a contingency for slab breaking rather than discovering it mid-pour.

Stage 3: Rough-in (2 – 4 weeks). Plumbing, electrical, and HVAC go in behind the walls. You’ll pick fixture locations and confirm the mini-split head placement now, because moving a drain after the slab is patched costs real money. This is also when the structural tie-ins happen: new headers over enlarged openings, hurricane straps if the garage wall becomes a living wall, and impact-rated windows in any new wall penetration.

Stage 4: Insulation, drywall, and finishes (4 – 8 weeks, the longest stretch). Spray foam or batt insulation goes in, drywall gets hung and finished, then flooring, cabinets, countertops, and fixtures. If the ADU has a kitchen, this is where KraftMaid or Wellborn cabinetry gets set. Homeowners often pair this with Cabinets & Countertops in Richmond Heights to keep the color story consistent with the main house, and with Backsplash, Tile & Flooring in Richmond Heights if they want a distinct palette in the unit.

Stage 5: Inspections and punch list (2 – 3 weeks). Rough inspections happen before drywall; final inspections happen after finishes. You walk the unit with us before we call it done, and anything on that list gets fixed under the 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between for a Garage Conversion ADU

Most of the decisions on a garage conversion come down to a handful of real trade-offs. Here’s what actually matters:

  • Floor build-up vs. recessed slab: Building up over the slab with a sleeper system is faster and cheaper, but it eats 4 – 6 inches of ceiling height. Cutting the slab for recessed plumbing keeps the ceiling tall but adds excavation cost, and in Richmond Heights the limestone can make that cut slow.
  • Mini-split vs. ducted HVAC: A ductless mini-split is the practical choice for most garages because it fits without running ductwork through existing walls. Ducted systems cost more but blend better if the garage shares a wall with the main house.
  • Kitchenette vs. full kitchen: A kitchenette (sink, two-burner, under-counter fridge) saves $8,000 – $15,000 and suits a studio. A full kitchen is what a long-term tenant or family member actually needs, and it changes how much cabinetry and counter you’re buying.
  • Garage door infill vs. window wall: Infilling the opening with James Hardie siding is cheapest and looks clean from the street. A window wall with impact-rated glazing adds light and curb appeal but runs several thousand more once framing and glass are priced.
  • Wet bath vs. half bath: A full bath adds a tub or shower pan and a second drain; a half bath is a toilet and sink on one line. If the unit is going to a renter, most homeowners go full bath.

What a Garage Conversion ADU Costs in Richmond Heights, FL

The range for this job in Richmond Heights is $45,000 – $130,000. Where you land depends on five variables:

  • Unit size and layout: A 300-square-foot studio sits at the low end. A 600-square-foot one-bedroom with full kitchen and bath pushes toward the top.
  • Existing slab condition: A clean, level slab saves thousands. Cracked slabs, failed moisture barriers, or slab-on-grade plumbing that has to move all add cost.
  • Plumbing distance: The farther the new bath and kitchen sit from the main stack, the more trenching and line you’re paying for.
  • Material grade: Builder-grade cabinetry and vinyl plank keep you near $45,000 – $60,000. KraftMaid cabinets, tile floors, and stone counters move you past $90,000.
  • Permit scope and impact requirements: If you’re adding a bathroom, a kitchen, and a new entry door, the drawing set and inspection cycle grow. Impact-rated glazing in any new opening is required, not optional.

A written line-item estimate from us covers demo, framing, rough-in, insulation, drywall, finishes, permits, and inspections. It does not cover: landscape repair outside the footprint, new roof sections if you’re changing the roofline, or furniture and appliances you supply yourself. Those get spelled out separately so the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Richmond Heights Homes Specifically Do to This Job

Richmond Heights is one of South Florida’s historically Black communities, and its housing stock tells you what to expect on a garage conversion. The typical home here is a mid-century concrete block ranch on a slab, many with terrazzo-style floors or tile, and a garage that was built to a 1950s – 70s standard rather than today’s. That means the slab you’re converting is often thinner than current code, the ceiling under the trusses may be lower than a modern garage, and the electrical panel may not have room for a subpanel feeding a full ADU. We’ve also seen a wave of new infill builds on redeveloped lots, so crews here have to be as comfortable retrofitting a 1960s ranch as tying into new construction next door.

Two local conditions change this job specifically. First, the limestone bedrock sits close to the surface in Richmond Heights, so any excavation for a recessed slab, drain field, or footing hits rock earlier than it would in Kendall or Pinecrest. That means a breaker on the truck, not just a shovel. Second, the high water table and summer downpours make slab moisture barriers and foundation drainage non-negotiable – a conversion that ignores this smells musty by the second wet season. Hurricane code compliance drives roof tie-downs and impact glazing in every new opening. If your conversion is part of a full Home Additions & ADU in Richmond Heights scope, we coordinate the two so the inspections flow together rather than doubling up.

Serving Richmond Heights, FL – Our Local Coverage Area

We serve Richmond Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Richmond Heights

Get a Free On-Site Estimate for Your Garage Conversion ADU in Richmond Heights

Call (844) 761-9356 to schedule a free on-site estimate for your garage conversion ADU in Richmond Heights. On the call we’ll get your address, ask what you want the unit to do (rental, family, home office), and set a time to walk the garage. From there you get a written line-item quote, a permit scope, and a realistic schedule – no vague bids. We cover Richmond Heights and the surrounding areas.

Written by the team at Groundwork Construction Co.

Why Richmond Heights Chooses Groundwork Construction Co. of The Hammocks

We set the standard for garage conversion ADU in Richmond Heights.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richmond Heights

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richmond Heights Customers Say

Trusted by homeowners across Richmond Heights and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in Richmond Heights?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richmond Heights.

(844) 761-9356

Request a Free Estimate in Richmond Heights

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch