Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Richmond Heights, FL: What the Job Actually Involves
Cabinets & countertops in Richmond Heights typically run $14,000 to $45,000 for a full kitchen’s worth of new cabinetry and stone, and most jobs take two to four weeks from demo to final caulk. The number moves with cabinet grade, countertop material, and whether the layout stays put or shifts plumbing and electrical. Call (844) 761-9356 and we’ll walk your kitchen and put a real range in writing before you commit to anything.
How We Run a Cabinet and Countertop Job, Stage by Stage
Cabinet and countertop work is a sequencing problem more than a construction problem. Get the order wrong and you’re paying for a second stone template or a cabinet that doesn’t fit a wall that moved. Here’s how we run it.
Stage 1: Measure and lock the layout (day 1). We template the room, check every wall for plumb and square, and confirm where the sink, range, and refrigerator land. This is your decision point: keep the existing footprint or move things. Moving a sink or range means plumbing and electrical changes, which is the single biggest cost swing on the job.
Stage 2: Order and confirm (days 2 – 5). Cabinets go into production. You sign off on door style, finish, and hardware, and we confirm the countertop slab or blank. Lead times on semi-custom cabinets run two to four weeks; that gap is when we schedule demo and coordinate any electrical or plumbing rough-in. You’ll approve a final line-item quote here, and the number on it is the number you pay.
Stage 3: Demo and prep (day 1 of install, usually one to two days). Old cabinets and counters come out. We check the substrate, address any water damage behind the sink, and set the new cabinet boxes level and shimmed to the wall. This is where a slab home on Richmond Heights limestone can surprise you: an out-of-level floor means extra shimming and, occasionally, a poured leveling patch before the boxes go in.
Stage 4: Countertop template and fabrication (two to five days after cabinets are set). Stone gets templated once the cabinets are in and secure, then cut and installed. This gap is normal and not a delay. You’ll pick the edge profile and confirm the sink cutout here.
Stage 5: Final set and punch (one day). Countertops go down, sink and faucet connect, and we walk the room with you. Every cabinet door gets checked for alignment, every drawer for glide, and the caulk lines get finished. The whole job is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
The decisions that matter most are the ones you live with every day: cabinet construction, door style, countertop material, and edge. Here’s the honest trade-off on each.
- Stock vs. semi-custom cabinets. Stock boxes in set sizes are the budget play and go in fast. Semi-custom lets you fit odd wall lengths and pick the finish. Custom is the premium tier and the longest lead time. For most Richmond Heights kitchens, semi-custom hits the sweet spot between fit and budget.
- Cabinet box material. Plywood boxes hold up to moisture and re-screwing better than particleboard. In a humid South Florida kitchen, that difference shows up over a decade, not a year.
- Quartz vs. granite vs. butcher block. Quartz is non-porous and needs no sealing, which suits a busy household. Granite is natural, unique, and needs periodic sealing. Butcher block is warm and affordable but wants oiling and doesn’t love a wet sink area.
- Edge profile and thickness. A standard eased edge keeps cost down. A mitered or built-up edge reads thicker and dresses up the room for more money.
- Sink and faucet. An undermount sink with a solid-surface countertop looks cleanest; a drop-in works with any material and costs less to install.
- Hardware and finishes. Soft-close hinges and full-extension glides are worth the small upcharge. They’re the difference between a kitchen that feels premium and one that doesn’t.
What Cabinets & Countertops Cost in Richmond Heights, FL
Full cabinet and countertop work in Richmond Heights lands between $14,000 and $45,000. That’s the honest range, and here’s what pushes a job to either end.
Size and run length. A galley kitchen with ten linear feet of cabinets sits near the bottom. An L-shaped or island kitchen with twenty-plus feet moves toward the top.
Cabinet grade. Stock boxes keep you low; semi-custom and custom climb from there. Door style and finish add on top.
Countertop material. Quartz and granite sit mid to high; butcher block and laminate sit low. Slab selection and edge profile matter too.
Layout changes. Keeping the sink and range where they are avoids plumbing and electrical work. Moving them adds cost and time.
Existing condition. Water damage behind the sink, an out-of-level floor, or old wiring that needs updating all add line items you can’t see until demo.
A written estimate covers cabinets, countertops, demo, install labor, and basic plumbing and electrical tie-ins. It typically doesn’t cover structural changes, major electrical upgrades, or appliance purchases unless you ask for them to be included. Upfront pricing, no surprises: what’s on the quote is what you pay. If a job crosses $10,000, you can take $1,000 off, and 0% financing for 18 months is available.
See the difference
Before
After
Before
After
Before
AfterWhat Richmond Heights Homes Specifically Do to This Job
Richmond Heights is one of South Florida’s historically Black communities, and its housing stock tells the story: mid-century concrete block ranch homes with terrazzo or tile floors on slabs, sitting alongside a wave of new infill construction as older lots are redeveloped. That mix matters for cabinet and countertop work because crews have to be equally comfortable tying into 1950s framing and setting boxes in a brand-new build. Plenty of these homes have been added onto or given a second story over the years, so a kitchen that looks simple on paper sometimes hides a wall that was moved, a header that was added, or a floor that’s out of level.
The limestone bedrock sits close to the surface in Richmond Heights, which is why foundation work here can hit rock sooner than in neighboring areas. For a cabinet job, that usually shows up as a slab floor that’s less than perfect, so we check level before the boxes go in. The high water table and summer downpours also make moisture a real concern: any cabinet run under a sink or against an exterior block wall gets checked for old water damage before new boxes go down. Working across Richmond Heights and the surrounding ZIP 33176, we’ve learned to plan for these conditions rather than discover them mid-install.
Serving Richmond Heights, FL – Our Local Coverage Area
We serve Richmond Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Richmond Heights
Most jobs take two to four weeks from demo to final punch, and that includes the lead time for cabinets and the stone fabrication window. The install itself is fast; the waiting is in production and templating. Call (844) 761-9356 and we’ll give you a schedule tied to actual lead times, not guesses.
Straight swap of cabinets and counters generally doesn’t require a permit. The moment you move plumbing, relocate electrical, or alter a wall, a permit and inspection come into play, and we pull and pass those. If your project is part of a full Kitchen Remodeling in Richmond Heights, the permit scope covers the whole job.
Yes, and keeping the sink and range in place is the simplest way to hold the budget. It skips the rough-in and inspection steps and shortens the timeline. If you want to shift the sink or add an island, that’s a conversation about scope and cost, not a dealbreaker.
$14,000 to $45,000 covers full cabinet and countertop work, including demo, install, and basic plumbing and electrical tie-ins. Cabinet grade, countertop material, and layout changes are the big levers. Call (844) 761-9356 for an exact quote, and estimates are free.
Every cabinet and countertop job is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space. If something isn’t right, we come back and fix it. Our technicians have up to 12 years of experience, and every one of them is background-checked and arrives in uniform.
Get a Free Estimate on Cabinets & Countertops in Richmond Heights
Call (844) 761-9356 for a free on-site estimate. We’ll measure the kitchen, talk through cabinet and countertop options, and hand you a written line-item quote with the 730-Day Done Right Promise behind it. A live person answers around the clock, so there’s no voicemail to wait on. Whether you’re updating a mid-century ranch or finishing a new build, this is where the numbers get real.
Written by the team at Groundwork Construction Co.