Cabinets & Countertops in The Crossings, FL: what the job really involves
Cabinets & countertops in The Crossings typically run $14,000 – $45,000 for a full package, with most single-room projects landing between $18,000 and $30,000 once the old uppers and lowers come out. The work splits into two trades that have to sequence tightly: cabinets get demoed, leveled, set and shimmed, then the counter template is taken and the stone comes back 5 – 10 business days later. Call (844) 761-9356 and we’ll walk your kitchen, measure the actual runs, and put real numbers on paper.
What pushes a Crossings project toward the top of that range isn’t the cabinets. It’s what’s behind them. Homes built here in the late 1980s and 1990s have original drywall, original plumbing stubs, sometimes original electrical, and the moment the old boxes come off the wall you find out what you’re actually dealing with. We price for that on the front end so the number doesn’t move mid-job.
How a cabinets & countertops job actually runs, stage by stage
Stage 1: Walkthrough, measurement, and layout lock (1 visit, about 90 minutes). We measure every wall run, check for out-of-square corners (common in these CBS homes after 30-plus years of settling), confirm outlet and appliance locations, and photograph the plumbing stub-outs. This visit is where you decide door style, finish, and whether the sink stays put or moves. Anything that relocates a drain or a circuit changes the budget, so we settle it here, not on day three.
Stage 2: Permit filing and HOA architectural review (1 – 3 weeks of lead time). Miami-Dade County permitting applies to cabinet and counter changes when you’re touching electrical, plumbing, or structure. If your tract within The Crossings also requires an architectural review application for anything visible from the street, that packet gets submitted in parallel. This is dead time in the schedule, not work time, but it’s real and it’s the reason a “two-week kitchen” quotes out at four.
Stage 3: Demo and prep (1 – 2 days). Old cabinets come out, appliances get pulled or protected, and the walls get patched and floated. Countertops come off in one piece or get cut out, depending on material. Floors get protected before anything heavy moves. This is the messy day. Expect noise and dust, and plan to not cook that night.
Stage 4: Cabinet set and counter template (2 – 3 days, then a wait). Base cabinets go in first, leveled and shimmed to the actual floor, not the imaginary one. Uppers follow. Then the counter fabricator templates the finished cabinet run. That template is the point of no return: once the slab is cut, the sink hole and faucet locations are committed. Stone comes back in 5 – 10 business days.
Stage 5: Counter install, sink set, final trim (1 – 2 days). Slab goes down, sink and faucet get set, cabinet hardware and toe kicks go on, and we run through every drawer and door with you before we call it done. Full package, this lands at 4 – 7 weeks from first walkthrough to final walkthrough, and the back half moves fast once the stone arrives.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually matter when you spec cabinets & countertops
- Stock vs. semi-custom vs. full custom. Stock boxes are the fastest and cheapest but come in fixed widths, so a Crossings kitchen with odd wall runs ends up with filler strips. Semi-custom (this is where KraftMaid sits, and it’s what most of our buyers choose) gives you real width increments, finish choices, and interior organizers for a meaningful but not crazy premium. Full custom buys you exactly the kitchen you drew and a 10 – 14 week lead time.
- Quartz vs. granite vs. porcelain slab. Quartz is non-porous and doesn’t need sealing, which matters in South Florida humidity. Granite is gorgeous and heat-proof but needs resealing yearly and every slab is a one-off. Porcelain and sintered surfaces handle heat and scratches well and cost more per square foot. Cambria is a strong quartz option if you want consistent color across a big island.
- Door style and finish. Painted shaker is the safe resale choice. Flat-slab laminate doors cost less and hold up fine, but they show every fingerprint. Therma-Tru and ViewLux aren’t cabinet brands, but if you’re also replacing the patio door while the kitchen is torn apart, that’s the moment to do it.
- Drawers vs. doors below. Full-extension soft-close drawers cost more per unit and are the single upgrade buyers regret skipping. Every lower run you convert to drawers is money well spent.
- Backsplash height and range hood. A full-height backsplash behind the range changes the tile order and adds a day. Decide it at spec time, not at install.
What cabinets & countertops costs in The Crossings, FL
Full packages in The Crossings run $14,000 – $45,000. Pulled apart, here’s where the money goes:
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
Four things push a Crossings job toward the high end. Size of the cabinet run is the first. Existing condition is the second: original 1990s plumbing that needs a stub-out moved, or a 20-amp circuit that has to be upgraded for a new range, both add real dollars. Material grade is the third; quartz over stock laminate can swing the counter line by $2,500. And permit scope is the fourth: a like-for-like swap that touches nothing mechanical stays cheap, while anything relocating a drain or adding a circuit goes through Miami-Dade County inspection and the price reflects it.
A written estimate from us is line-item: cabinets, counter, labor, demo, permit fees, and disposal are all broken out so you can see what each line actually is. What’s not included is typically the appliance package, any structural change discovered behind the drywall, and finish carpentry beyond the cabinet footprint.
See the difference
Before
After
Before
After
Before
AfterWhy cabinets & countertops jobs in The Crossings look different
This is a master-planned Kendall subdivision built in the late 1980s through the 1990s, almost entirely inside ZIP 33186, and it’s fully built out. There’s no new construction here. Every cabinets & countertops project we run in The Crossings is a renovation of an original Mediterranean-style CBS home, which means we’re pulling permits through Miami-Dade County and the City of Miami inside an established community rather than breaking ground on a lot. The housing stock is uniform enough that we know what we’ll find: original drywall, original plumbing, and cabinets that have been baking in subtropical heat and humidity for three decades.
That HOA layer is the part homeowners underestimate. Exterior changes require architectural review on top of county permitting, which is different from the unincorporated pockets nearby. Inside the kitchen you’re usually clear, but if the project touches a window or a patio door, schedule the review early. And since these homes are hitting 30-plus years, plenty of Crossings owners are pairing new cabinets & countertops with a wider Kitchen Remodeling in The Crossings scope – new flooring, lighting, the whole thing. If you’re already tearing the room apart, our kitchen remodeling service covers it under one contract.
We cover all of The Crossings and the surrounding tracts. Many of our kitchen clients also ask about the bathroom down the hall while we’re on site; homeowners often pair this with Walk-In Showers & Shower Remodeling in The Crossings or a Tub-to-Shower Conversion in The Crossings for the same reason: the permits and the crews are already there.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in The Crossings
Plan on 4 – 7 weeks from first walkthrough to final, with 1 – 3 weeks of that being permit and HOA review. The active work is roughly 2 weeks, and the stone fabrication wait of 5 – 10 business days sits in the middle. Call (844) 761-9356 for a schedule specific to your home.
You need a Miami-Dade County permit whenever the job touches electrical, plumbing, or structure; a straight like-for-like swap with nothing moved often doesn’t. Because The Crossings is HOA-governed, exterior-visible changes also need architectural review. We file the permit, pull the inspection, and handle the paperwork, and we tell you up front which path applies.
Yes, and it’s the smartest way to keep the budget down. Keeping the sink, range, and outlets in place lets us work within the existing rough-ins. Moving a drain or adding a circuit adds cost and triggers inspection. We’ll show you both options in the estimate and let you decide.
A full package runs $14,000 – $45,000. Cabinet installation alone is $4,000 – $13,000 and countertops $2,000 – $6,500. The exact number depends on run length, material, and how much of the original plumbing and electrical needs updating. Call (844) 761-9356 for a free on-site estimate; the number you see is the number you pay.
Every cabinets & countertops project we do is covered by our 730-Day Done Right Promise. If it’s not done right, we make it right, for two full years after install. Our technicians have up to 12 years of experience, and calls are answered by a live person around the clock.
Get a free cabinets & countertops estimate in The Crossings
Call (844) 761-9356 for a free on-site estimate on your cabinets & countertops in The Crossings. We walk the kitchen, measure the runs, and leave you with a written line-item quote, no surprises. Eligible projects over $10,000 get $1,000 off, and 0% financing for 18 months is available. A live person picks up around the clock, every day.