FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Tamiami: What It Costs and How Long It Takes
A tub-to-shower conversion in Tamiami typically runs $4,130 to $11,800 and takes three to six working days from demo to final inspection, depending on whether the drain stays put or moves. The job means pulling the tub and its surround, reframing and waterproofing the wet wall, resetting the drain and valve, and installing a new shower pan, tile or acrylic walls, and a glass door or curtain rod. Call (844) 761-9356 and we’ll walk your bathroom and put a written number in your hands.
How the Job Actually Runs, Stage by Stage
Most contractors describe this work in a single sentence. It doesn’t happen in a single sentence, and knowing the sequence is how you avoid the two-week job that turns into five. Here’s what we do, in order.
Days 1: Protection, demo, and the first surprise
We mask the floor path from the front door, shut the water at the fixture stops, and pull the tub, surround, and any drywall behind it. On 1970s and 1980s block homes, this is the moment we find out whether the tub drain was ever sealed properly. Removal takes a day. You decide nothing yet; we photograph everything behind the wall before it closes.
Day 2: Rough-in and framing
We set the new shower valve, relocate or extend the drain if the layout calls for it, and frame the opening so the finished shower is square and the pan sits level. If a bench or niche is going in, it gets blocked and framed here. This is when you confirm the final fixture finish and valve trim, because once the wall closes, changing it costs another day.
Day 3: Waterproofing and inspection
We install a bonded waterproofing membrane over the pan and walls, then run a flood test where the pan type calls for one, and schedule the rough plumbing inspection. Nothing gets tiled over wet substrate. This stage is the one homeowners least want to pay for and the one that decides whether the shower leaks into the room below in year four.
Days 4 through 5: Tile, glass, and trim
Wall tile and floor tile go in, then grout, then the shower door, valve trim, and any grab bars. Most jobs land tile by end of day four and finish trim on day five. Large-format tile runs faster than mosaic; a niche adds about half a day.
Day 6: Final inspection and walkthrough
The final plumbing and building inspection closes out the permit, we caulk the wet seams, and we walk the shower with you, checking slope, drain flow, and door swing. You get the signed-off inspection and our 730-Day Done Right Promise in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make Between
Four decisions drive most of the cost on this job. Here’s the honest trade-off on each, not the brochure version.
- Shower pan: site-built tile pan vs. prefabricated pan. A tile pan matches your bathroom floor and lets us size the shower exactly, but it’s the slower, more expensive route and depends entirely on the waterproofing being right. A prefab pan is faster, cheaper, and forgiving, and its slope is engineered for you. It also locks you into a set size.
- Wall surface: tile vs. acrylic or solid surface. Tile holds up for decades and lets you choose any look, but it needs sealed grout on the floor and a proper membrane behind it. Acrylic and solid surface walls clean easiest and skip grout entirely, at the cost of a more limited design range.
- Valve and trim: Kohler or Moen. Both are worth the small premium over generic builder valves because cartridges are stocked locally and replacement parts exist ten years out. Kohler leans heavier and dressier; Moen is easier to service and cheaper to repair. Grab bar integration is easier on some trim series than others, so decide early.
- Enclosure: framed glass, frameless glass, or curtain. Frameless glass looks best and costs the most. Framed glass is a fair middle. A curtain rod is the cheapest and totally reasonable if the shower is a second bath. Whatever you choose, glass size has to be measured after tile, so it’s ordered late.
What Tub-to-Shower Conversion Costs in Tamiami, FL
The range for this job in Tamiami is $4,130 to $11,800 for most single-bathroom conversions. Here’s how a job lands at the low end versus the high end.
| Scope | Typical Cost |
|---|---|
| Tub out, prefab pan, acrylic walls, curtain rod, no plumbing moved | $4,130 – $5,900 |
| Tile pan, tile walls, framed glass door | $5,900 – $8,260 |
| Tile throughout, bench or niche, frameless glass, Kohler valve upgrade | $8,260 – $11,800 |
| Drain or valve relocation requiring opening the slab | Add roughly 15 – 25% |
The five variables that move the number: the size of the shower footprint, whether the drain stays in place or moves, whether the existing valve is up to code, tile grade and format, and whether we’re opening a slab or rebuilding a bad substrate behind the old surround. A slab cut for a relocated drain is the single biggest jump on this list. Written estimates itemize demo, plumbing, waterproofing, tile, glass, and permit. What’s usually not included: a bathroom vanity or floor outside the shower area, wall paint, and any unpermitted prior work the inspection requires us to correct first.
See the difference
Before
After
Before
After
Before
AfterWhat Tamiami’s Homes Do to This Job
The block homes off SW 8th Street and through the 33184 ZIP were built mostly between 1970 and 1990, and many of them arrived at us through previous owners who did a bathroom quick-and-dirty. We see tub surrounds screwed straight to drywall with no membrane behind the tile, drains bedded in mortar that’s cracked, and the occasional shower built over a former Florida room conversion. Because Tamiami sits at the edge of the Everglades under Miami-Dade’s High Velocity Hurricane Zone rules, the permitting here is not a formality: a plumbing and building permit draws inspection sequencing, and if the shower shares a wall with a converted enclosure, we may have to legitimize or remove prior work before the new scope can pass. Wind-load and product-approval review doesn’t apply to interior tile, but any exterior wall penetration does, and the humidity means the membrane gives you years of real service only if it’s installed correctly. Homeowners here often pair a bathroom conversion with Metal Roofing in Tamiami or Tile Roofing in Tamiami if the roof is on the same timeline, and it’s usually worth scheduling both through one contractor. It also folds neatly into a full Bathroom Remodeling in Tamiami if the vanity, floor, and lighting are ready for the same pass.
Serving Tamiami, FL – Our Local Coverage Area
We serve Tamiami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in Tamiami
Most conversions take three to six working days, with a day added for each of the following: a moved drain, a slab cut, or a niche and bench. Glass door fabrication adds a few days of lead time before install, so plan for closer to seven to ten calendar days from start to a finished shower. Call (844) 761-9356 for an exact schedule after we see the bathroom.
Yes. A conversion that touches plumbing or the shower pan requires a plumbing permit, and often a building permit, under Miami-Dade rules. We pull the permit and handle the inspections, which is a large part of why a conversion here isn’t a weekend job. Call (844) 761-9356 and we’ll explain what your particular scope requires.
Usually yes. If the drain and valve stay in the same wall and floor positions, we work within them and skip the slab work entirely, which brings the job toward the $4,130 end. A wider shower footprint or a bench typically requires moving the drain, which pushes toward the $11,800 end. Call (844) 761-9356 to talk through your layout.
A conversion typically runs $4,130 to $11,800 while a full bathroom remodel across the same room runs $10,620 to $33,040, because the remodel also touches the vanity, floor, lighting, and paint. If the rest of the bathroom is in good shape, conversion is the more efficient spend; if everything is dated, one coordinated project usually costs less than two. Our Bathroom Remodeling team can scope both so you see the difference in writing.
Every conversion we complete is covered by our 730-Day Done Right Promise, which means if the waterproofing, drain, or tile fails within that window, we come back and make it right. That’s one of the longest workmanship guarantees in residential construction. Call (844) 761-9356 to schedule a free on-site estimate.
Get a Written Estimate for Your Tamiami Tub-to-Shower Conversion
We come to your home, measure the shower, open the wall enough to see what’s behind the old tub, and hand you a line-item estimate before you commit to anything. That estimate reflects the real permit scope for your block home in the Tamiami area, and our pricing is upfront with no surprises: the number you see is the number you pay. Projects over $10,000 can use our $1,000 discount and 0% financing for 18 months. Free estimate, real answers, no pressure.
Call (844) 761-9356 to schedule your free estimate.