Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Kitchen Design & Layout in Kendall, FL: What It Costs and How Long It Takes
Kitchen design and layout work in Kendall typically runs $14,000 – $45,000, and most projects take four to eight weeks from first measurement to final walkthrough. The design phase itself – drawings, cabinet plan, electrical and lighting locations, material selections – usually takes one to two weeks before a single cabinet comes off the wall. Call (844) 761-9356 to schedule a free on-site estimate; we’ll walk your kitchen, measure, and tell you what the layout can actually support.
How we plan a kitchen, stage by stage
Most contractors hand you a catalog and ask what color cabinets you want. That’s backwards. Layout comes first, because the layout decides everything after it – where the sink sits, how wide the walkway is, whether the fridge door opens against a wall.
Stage 1: Measure and walkthrough (day 1, about 90 minutes). We record every dimension, photograph the existing electrical and plumbing, and note which walls are structural. In a Kendall CBS home, that last part matters more than it does inland – the block walls don’t move, so the layout has to work around them, not through them. You decide here: what’s annoying you most about the current kitchen? Too little counter? Bad traffic flow? No pantry?
Stage 2: Layout options and drawings (days 2 – 7). We produce two or three layout schemes – usually a one-wall, L-shape, or galley variation, sometimes with an island if the room has the clear floor space (you need 42 inches of walkway minimum; below that, an island makes the kitchen worse, not better). You pick a direction and we finalize cabinet sizes, appliance footprints, and outlet and switch locations. This is the stage where changing your mind is free. After fabrication starts, it isn’t.
Stage 3: Material selection and firm quote (days 7 – 14). Cabinet line, door style, countertop material, backsplash, flooring, lighting. We price each option in writing so you can see what a quartz upgrade actually adds versus a laminate top. You sign off on a fixed number before demo.
Stage 4: Permit and demo (days 14 – 21). Miami-Dade County permitting runs through unincorporated Kendall, and if the layout moves plumbing or adds circuits, the scope goes on the permit drawings. We pull it and schedule the inspection. Demo and rough-in follow – typically three to five days for a standard kitchen.
Stage 5: Install and inspection (weeks 3 – 6, sometimes longer). Cabinets, countertop template and install, backsplash, fixtures, flooring, paint. Final inspection, punch list, walkthrough. You get the full sequence in writing before we start, so you know which weeks the kitchen is unusable and which days you’ll need to be home.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually shape your kitchen
Every design decision trades something against something else. Here’s the honest version of the ones that matter most.
- Stock vs. semi-custom cabinets. Stock boxes are cheaper and faster; semi-custom lets you fix the awkward 13-inch gap beside the fridge that stock sizes can’t fill. In a 1970s Kendall kitchen with irregular wall lengths, semi-custom often pays for itself in usable storage.
- Quartz vs. granite vs. laminate. Quartz is consistent and non-porous, which suits a humid climate; granite is tougher to stain but needs sealing; laminate is the budget pick and holds up fine if you’re planning to sell within a few years.
- Galley vs. L-shape vs. island. Galley maximizes counter run in a narrow room. An L-shape opens the floor. An island adds prep space and seating but only works with real clearance – measure before you fall in love with the picture.
- Appliance placement. Moving the range or sink means moving gas or plumbing, and that’s the single biggest cost swing in a layout change. Keeping them put saves thousands.
- Lighting plan. Recessed cans, under-cabinet strips, and pendants over an island are three separate circuits. Decide now, not after drywall.
We work with KraftMaid cabinetry and Cambria surfaces among others, and we’ll show you where the mid-grade option performs nearly as well as the premium one. No one needs the most expensive door on the wall.
What Kitchen Design & Layout costs in Kendall, FL
Plan on $14,000 – $45,000 for kitchen design and layout work in Kendall. That range is wide because layout complexity, not square footage, drives most of the number.
| Line item | Typical Kendall range |
|---|---|
| Design and drawings | Included in project quote |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Island installation (if layout allows) | $3,000 – $10,000 |
Four variables push a Kendall kitchen toward the top of that range. Relocating plumbing or gas adds $2,000 – $6,000 depending on how far and whether the slab has to be opened. Moving or removing a wall means structural review and a beam, and in a block home that’s real money. Material grade – a laminate-to-quartz jump alone is a few thousand. Permit scope grows if you add circuits, move a window, or touch the electrical panel.
Our written estimate is line-item and fixed. What’s included: design, permit pull, demo, install, inspection coordination, cleanup. What usually isn’t: appliance cost, structural engineering if a wall comes out, and any change you request after fabrication starts. Upfront pricing, no surprises – the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhy Kendall kitchens need a layout built for this climate and this paperwork
Kendall is a fully built-out corner of unincorporated Miami-Dade west of the Turnpike, which means almost every kitchen here is a rebuild inside an existing 1970s-to-1990s CBS home. There’s no new ground-up construction to speak of in ZIP 33176 – the work is gut-and-redo, and the block walls don’t flex for a trendy layout.
The paperwork question comes before the price question in this part of the county. Homeowners on Kendall Drive and out toward The Crossings ask whether we pull the Miami-Dade permit and whether products carry the county’s product approvals, because that’s the standard the county inspects to. If your layout moves a sink or adds circuits, it’s on the permit. If you skip it, it surfaces at resale.
The climate shapes materials too. High humidity and salt-laden air off the coast punish cheap hinges, particleboard boxes, and unsealed edges years faster than an inland kitchen sees. We spec moisture-resistant cabinet boxes and sealed countertop edges as a default here, not an upgrade. Homeowners often pair a kitchen layout with new flooring or a vanity refresh at the same time – see our Vanities, Tile & Fixtures in Kendall work if you’re touching adjacent rooms.
Serving Kendall, FL – Our Local Coverage Area
We serve Kendall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Kitchen Design & Layout in Kendall
Most Kendall kitchen design and layout projects take four to eight weeks from signed estimate to final walkthrough, with design and permit review eating the first two to three weeks. Small cosmetic layouts finish faster; projects that move plumbing or add an island run longer. Call (844) 761-9356 for a timeline specific to your kitchen.
Yes, if the layout moves plumbing, gas, electrical circuits, or walls. Miami-Dade County requires a permit for that scope, and the inspection has to pass before the job closes. Cosmetic swaps – cabinet fronts, countertop in the same footprint, paint – usually don’t trigger one. We pull the permit and coordinate the inspection as part of the job.
Often, yes. Keeping the sink and range where they are and rethinking cabinet runs, storage, and lighting solves most flow complaints without opening the slab or adding a beam. That approach typically lands in the $14,000 – $22,000 part of the range. We’ll tell you honestly whether the layout you want is achievable without the extra work.
Plan on $14,000 – $45,000 depending on layout complexity, material grade, and whether plumbing or structure moves. Cabinet installation alone runs $4,000 – $13,000, and countertops $2,000 – $6,500. Call (844) 761-9356 for an exact line-item quote – the estimate is free.
Every project we complete is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Calls are answered by a live person around the clock, and every technician is background-checked and arrives in uniform.
Get a free kitchen layout estimate in Kendall
If you’re rethinking your kitchen layout, the first step is a free on-site estimate. We measure the room, walk the existing plumbing and electrical, and tell you which layouts your space actually supports – no charge, no pressure. Call (844) 761-9356. A live person answers day or night. We’ll set a time, and you’ll leave the visit with a realistic number and a clear next step. Our kitchen remodeling service covers the wider scope if you’re ready for a full project, and the Kendall service-area page shows everything we handle here.
Written by the team at Groundwork Construction Co.