Junior ADU & Interior Conversion in Kendall, FL: What It Costs and How It Runs
A junior ADU and interior conversion in Kendall runs $45,000 – $130,000, typically takes 3 to 5 months from permit to final inspection, and usually means carving a small living suite out of existing square footage inside your main home rather than building anything new. Most Kendall jobs we scope land between 300 and 600 square feet. Call (844) 761-9356 to schedule a free on-site estimate and we’ll walk the space with you before a single number goes in writing.
How We Take a Junior ADU & Interior Conversion From Walkthrough to Final Inspection
Every job follows the same sequence. Here’s what actually happens, stage by stage, and what you’re deciding at each point.
Stage 1 – Walkthrough and feasibility (day 1, about 90 minutes). We measure the candidate space, check ceiling height, look at where the electrical panel sits, and trace how plumbing runs to the room. You decide which space becomes the suite: a converted den, a portion of an oversized family room, or a section of a garage. We also confirm whether a kitchenette is allowed under your existing layout before you commit to the cost of one.
Stage 2 – Design and permit package (weeks 1 – 4). We produce drawings and a written line-item scope for submittal to Miami-Dade County. You choose the layout: bedroom and bath side by side, or bath tucked behind a short hallway. You pick the entry configuration. Independent of the plan, this is when the county reviews the submittal. Nothing gets built until permits are issued.
Stage 3 – Demo and rough-in (weeks 5 – 7). The first week is selective demo: pulling drywall where the new walls land, protecting the floor you’re keeping, and capping off anything that has to move. Week two is rough framing, plumbing, and electrical, and week three is inspection for each trade. You decide fixture locations now, because moving a drain after this stage is a change order.
Stage 4 – Insulation, drywall, and finishing (weeks 8 – 12). Insulation goes in, drywall hangs and finishes, then flooring, cabinets, tile, and trim. This is the longest stretch and the one where choices made earlier show up. You decide paint, hardware, and fixtures at the start of this stage, not the middle.
Stage 5 – Final inspections and punch list (weeks 13 – 16). We walk the finished suite with you, correct anything on the punch list, and close out the county inspections. Most Kendall projects land near the 16-week mark, though a complex submittal can stretch the front end. Everything is covered by our 730-Day Done Right Promise, which is one of the longest workmanship guarantees in residential construction.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make on a Junior ADU & Interior Conversion
A junior ADU is a collection of decisions about how small-space living should work for one or two people. These are the ones that move the budget most.
- Kitchenette versus full kitchen: A kitchenette with a sink, small refrigerator, and two-burner cooktop costs less and pulls a simpler permit. A full kitchen with a range line adds cost and electrical capacity but suits a longer-term occupant.
- Bathroom configuration: A compact three-piece bath tucks into 40 – 50 square feet. A walk-in shower instead of a tub saves footprint and reads more modern. Tile choice alone swings this line from modest to premium.
- Flooring: Luxury vinyl plank handles moisture and the transition to the main house better than most. Tile is tougher in a bath but colder underfoot. Engineered hardwood looks best but needs a moisture check on a Kendall concrete slab before install.
- Exterior skin and materials on any new wall: James Hardie fiber cement siding holds up to Miami humidity far better than wood. We use it where a new exterior wall or bump-out is part of the conversion.
- Storage: A built-in closet system or a Wellborn cabinet package in the kitchenette does more for livability per dollar than extra square footage does, and both are stocked in finishes that read upscale.
- Door and entry configuration: A separate exterior entry costs more and requires more permit scope. Sharing the main entry keeps cost down but limits privacy. This is the single decision that most changes the feel of the finished suite.
What Junior ADU & Interior Conversion Costs in Kendall, FL
Junior ADU and interior conversion work in Kendall typically runs $45,000 – $130,000. A straightforward 300-square-foot conversion from an existing den with a compact bath lands near the bottom. A larger 600-square-foot job with new exterior walls, a full kitchen, and separate entry sits near the top. Below is what line items typically cost.
| Line item | Typical range |
|---|---|
| Interior conversion – layout, framing, drywall, flooring | $28,000 – $62,000 |
| Compact bathroom build-out | $9,000 – $22,000 |
| Kitchenette or small kitchen | $9,000 – $20,000 |
| Electrical rough-in and panel work | $4,000 – $12,000 |
| Plumbing rough-in and fixture connection | $3,500 – $10,000 |
| Permit and plan package | $3,000 – $9,000 |
| Exterior wall, siding, or entry modification | $6,000 – $18,000 |
Five things push a Kendall junior ADU toward the high end: (1) Size – every additional 100 square feet adds roughly $8,000 – $14,000. (2) Existing condition – a room with finished walls and slab in good shape converts cheaply; one with old plumbing, old wiring, or a cracked tile floor adds demo and repair. (3) Relocating plumbing and electrical – moving a bathroom drain 10 feet can add $2,000 – $5,000 in slab work. (4) Material grade – builder-grade versus premium cabinets, tile, and fixtures. (5) Permit scope – a conversion that touches no exterior footprint is simpler and cheaper to permit than one that adds a wall or entry.
Our written estimates are line-item and upfront: the number you see is the number you pay. We include permits pulled and inspections passed, materials, labor, and cleanup. Not included: temporary housing if the suite is the only livable space, and any structural repair discovered only after walls open.
See the difference
Before
After
Before
After
Before
AfterWhy Kendall Concrete Block Changes the Plan
Kendall is a fully built-out corner of unincorporated Miami-Dade west of the Turnpike, which means most of our junior ADU conversions happen inside a 1970s-to-1990s concrete block and CBS home, not on new ground. That has real consequences. CBS walls are thick and strong, but they don’t flex, so any new interior wall has to be planned around them rather than cut into them casually. Old plumbing in these homes is often steel or early PVC running through a slab, so if you’re moving a drain, we scope a slab penetration right away. The county’s permitting and inspection scheduling are the pulse of this work, and so is product-approval compliance, because Kendall sits inside the High Velocity Hurricane Zone. We also see several conversions a season in the homes off Kendall Drive and around the 33176 ZIP where a hurricane retrofit and a suite build get planned together, because tearing into interior walls is the right time to add roof-to-wall straps. If you’re pairing this with a wider scope, that belongs on our Home Additions & ADU in Kendall page or our broader Home Additions & ADU service, and we cover the full Kendall area for these jobs.
Serving Kendall, FL – Our Local Coverage Area
We serve Kendall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Junior ADU & Interior Conversion in Kendall
Most projects take 3 to 5 months, or roughly 13 to 16 weeks of active construction. The permit review at the front is usually the single biggest variable. Call (844) 761-9356 for a realistic timeline on your specific project.
Yes. Any conversion that adds plumbing, electrical, or new walls needs a Miami-Dade County permit and inspections. We pull the permits and schedule the inspections as part of the job. Nothing starts until the permit is in hand.
Often, yes, if your existing plumbing lines already run to the room. A bathroom added near an existing bathroom or over a nearby wet wall makes it much simpler. The walkthrough confirms this in the first hour.
Roughly $45,000 – $130,000 depending on square footage, whether a full kitchen is included, and whether new exterior walls or a separate entry are in the plan. Call (844) 761-9356 for a written line-item estimate; it’s free.
The 730-Day Done Right Promise covers all our work, and it’s one of the longest workmanship guarantees in residential construction. If something isn’t done right, we make it right. Homeowners frequently pair this with Kitchen Design & Layout in Kendall and Small & Partial Kitchen Remodels in Kendall when the main house needs work too.
Schedule Your Junior ADU & Interior Conversion Estimate in Kendall
A free on-site estimate starts with a walkthrough of your room or rooms and a conversation about how the suite will be used. We’ll measure, check the panel and plumbing, and come back with a written line-item quote and a projected timeline. Calls are answered by a live person, 24/7. Financing options include 0% for 18 months and $1,000 off projects over $10,000. Call (844) 761-9356 when you’re ready. Estimates are free, and there’s no pressure to commit.
Written by the team at Groundwork Construction Co. of The Hammocks.