Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What Full Kitchen Remodeling in Kendall, FL Actually Involves
Full kitchen remodeling in Kendall, FL runs $14,000 to $45,000 and typically takes six to ten weeks from demo to final inspection. That covers new cabinets, counters, backsplash, flooring, lighting, plumbing fixtures, and the permit work Miami-Dade County requires. The timeline stretches when walls come down and plumbing or electrical moves. For a firm number on your kitchen, call (844) 761-9356 and we’ll walk the space with you.
How a Full Kitchen Remodel Moves From Demo to Walkthrough
Kitchens are the one room where sequence matters more than speed. Get the order wrong and you’re tearing out finished work. Here’s the real progression we run in Kendall homes.
Stage 1: Site protection and demo (2 to 4 days)
Day 1 is dust control: plastic barriers at the doorways, floor protection on the paths crews walk, and shutting off water and gas to the kitchen. Demo starts once the permit is posted. We pull cabinets, counters, and appliances, then strip to studs where the layout changes. You’ll want to decide where the temporary kitchen setup goes before this day, because the sink goes offline here.
Stage 2: Rough-in and inspections (1 to 2 weeks)
This is where plumbing, electrical, and any HVAC or structural changes happen. If you’re moving the sink or range, this stage is longer. Miami-Dade requires rough-in inspection before walls close, and the inspection scheduling itself can add days. You decide fixture locations and outlet placement now, in writing, before drywall.
Stage 3: Drywall, paint, and cabinet install (1 to 2 weeks)
Walls close, texture and paint go on, then cabinets land. Cabinet delivery timing drives this stage more than labor does. We confirm your cabinet order is on the truck before we schedule this window. You’ll confirm cabinet layout, hardware, and door style before this point or you’re paying restocking fees.
Stage 4: Counters, backsplash, and final hookups (1 to 2 weeks)
Countertop templates happen after cabinets are set, not before. Stone fabrication runs about a week. Then backsplash tile, then the final plumbing and electrical trim out, then appliances and the final inspection. You pick edge profiles and backsplash tile during stage 3 so nothing waits.
Stage 5: Punch list and walkthrough (2 to 3 days)
We walk the kitchen with you, mark anything that needs adjusting, and correct it. Then the final inspection clears and the kitchen is yours. This is where the 730-Day Done Right Promise goes to work: if something fails or shifts after that walkthrough, we come back and fix it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Shape a Kendall Kitchen
Most of your decisions come down to a handful of categories, and each one trades cost against durability in a way that matters in South Florida humidity.
- Cabinets: Stock cabinets save money and ship fast but limit your layout. Semi-custom is the middle ground most Kendall homes land on. Full custom fits awkward spaces and costs the most. In a humid climate, plywood boxes and a quality finish outlast particleboard.
- Countertops: Silestone and Caesarstone quartz hold up to heat and stains with almost no maintenance, and they don’t need sealing. Granite is durable but porous and needs periodic sealing. Laminate is the budget pick and shows wear faster near the sink.
- Backsplash: Ceramic or porcelain tile is affordable and forgiving; natural stone looks richer but needs sealing. Full-height tile walls read clean and handle splashing better than a short splash.
- Fixtures: Kohler and Moen both make durable faucets, and the difference between price tiers is mostly finish quality and valve internals. A good valve behind the wall matters more than the spout you see.
- Flooring: Porcelain tile handles moisture and spills best in a Florida kitchen. Luxury vinyl is warm underfoot and cheaper. Hardwood is beautiful and the most vulnerable to water.
- Ventilation: A range hood vented to the outside, not a recirculating unit, matters in a house that runs the AC most of the year.
What Full Kitchen Remodeling Costs in Kendall, FL
Expect $14,000 to $45,000 for a full kitchen remodeling project in Kendall. Here’s how the line items break down:
| Item | Typical range |
|---|---|
| Cabinets (installed) | $4,000 – $13,000 |
| Countertops | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island | $3,000 – $10,000 |
| Full remodel, all-in | $14,000 – $45,000 |
What pushes a job toward the high end: square footage (a 150-square-foot kitchen costs more than a galley), existing condition (cast-iron drains, aluminum wiring, or old drywall behind tile all get discovered at demo), relocating plumbing or electrical, material grade (custom cabinets and quartz versus stock and laminate), and permit scope when walls move or structure gets touched.
A written estimate from us is line-item and fixed. It spells out demo, disposal, materials, labor, permits, and inspections. What it doesn’t cover: unexpected structural or code issues found behind the walls, which we price separately with your approval before any work continues. No surprise change orders.
See the difference
Before
After
Before
After
Before
AfterWhat Kendall Homes Specifically Do to This Job
Kendall is a built-out, unincorporated stretch of Miami-Dade west of the Turnpike, mostly 1970s-to-1990s concrete block and CBS homes with barrel-tile or shingle roofs. Almost nothing here is new ground-up construction, so a kitchen remodel usually means opening up a house that was built to older electrical and plumbing standards. In tracts off Kendall Drive and deeper into the neighborhoods near 33176, we regularly find aluminum branch wiring or undersized panels that turn a simple appliance swap into a panel upgrade, and cast-iron or galvanized drain lines that fail pressure testing during the plumbing rough-in.
The other reality is paperwork. Miami-Dade permitting and the hurricane-zone product approval environment that followed Hurricane Andrew means inspection scheduling and NOA product approvals can add days to a job, not hours. In Kendall, the paperwork question often comes before the price question, and rightly so. We pull the permits, track the inspections, and don’t hand you a kitchen until it passes final.
This is why a full kitchen remodeling project in Kendall is not the same as a kitchen remodel in a newer inland market. The housing stock, the permitting, and the humidity all shape what a crew actually does on day two. If the wider scope grows past the kitchen, see our Kitchen Remodeling in Kendall page for how it fits a larger renovation, and if you’re redoing the adjacent bath, homeowners often pair this with Full Bathroom Remodeling in Kendall or Walk-In Showers & Shower Remodeling in Kendall to keep the crew and the schedule moving.
Serving Kendall, FL – Our Local Coverage Area
We serve Kendall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Kitchen Remodeling in Kendall
Six to ten weeks for most kitchens, with the inspection scheduling and cabinet lead times doing the most to stretch it. Moving plumbing or load-bearing walls adds a week or more. Call (844) 761-9356 for a schedule tied to your actual kitchen.
Yes, if you’re moving plumbing, electrical, or walls. Miami-Dade County requires permitting and inspection for those changes. A cosmetic swap without moving services may not need one, but we confirm before we start. We pull the permits and schedule the inspections.
Yes, and it’s the fastest, least expensive path. Keeping the sink, range, and walls where they are skips the rough-in inspection stage and shaves cost off the total. Many Kendall kitchens don’t need a layout change to feel completely new.
$3,000 to $10,000 depending on size, cabinetry, counter material, and whether it holds a prep sink or cooktop. It’s not structural, but it needs clearances checked – a tight kitchen loses more than it gains.
The 730-Day Done Right Promise covers workmanship for two years from the walkthrough. If something isn’t right, we come back and fix it. Call (844) 761-9356 to get the specifics in writing before you sign anything.
Get a Free Estimate on Your Full Kitchen Remodeling in Kendall
We’ll come out to your Kendall home, measure the kitchen, look at what’s behind the walls where we can, and give you a line-item written estimate with a fixed price and a real schedule. If the kitchen is part of a larger renovation, we’ll scope that too. You can see the full range of what we do on our Kitchen Remodeling service page, and our coverage across Kendall is here. Call (844) 761-9356 – estimates are free, and calls are answered by a live person.
Written by the team at Groundwork Construction Co.