Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Richmond Heights, FL: What It Takes and What It Costs
A full kitchen remodeling in Richmond Heights typically runs $14,000 – $45,000 and takes six to ten weeks from demo to final walkthrough, depending on whether walls, plumbing, or the electrical panel move. That figure covers cabinets, countertops, flooring, lighting, and finish carpentry for a whole-kitchen gut, not a cosmetic refresh. For an exact number on your house, call (844) 761-9356 and we’ll walk the space with you.
How a Whole-Kitchen Gut Actually Runs, Week by Week
Most homeowners have never lived through a full gut, and the surprises come from sequence, not from materials. Here’s the order we run in Richmond Heights.
Stage 1: Walkthrough, measurements, and a written scope (days 1 – 5)
We measure the room, photograph the existing wiring and plumbing, and check what’s behind the drywall. You decide on layout at this point because everything downstream depends on it. Cabinet lead times set the calendar, so this is also when we lock the order.
Stage 2: Permits and demo (week 1 – 2)
We pull the permits, then protect the rest of the house with plastic and floor covering before the first hammer swings. Demo of cabinets, counters, and flooring takes two to four days. Anything structural, or any drain or circuit that has to move, gets flagged here, not in week six.
Stage 3: Rough-in and inspection (weeks 2 – 4)
Plumbing, electrical, and any framing changes happen now, then the inspector signs off before insulation and drywall go up. This stage is the biggest schedule variable on a Richmond Heights full kitchen remodeling job. Homeowners decide outlet placement, under-cabinet lighting, and appliance specs during this window.
Stage 4: Drywall, cabinets, and countertops (weeks 4 – 7)
Drywall and paint go first, then cabinets, then template and install for counters. Stone counters add roughly a week for fabrication. You’ll choose cabinet door style and finish before this stage and countertop slab during it.
Stage 5: Tile, fixtures, trim, and punch list (weeks 7 – 10)
Backsplash, sink, faucet, appliances, and final trim wrap the job. We walk the room with you, note every item on a punch list, and don’t close the file until it’s clear. The work is covered by our 730-Day Done Right Promise, so if something isn’t right, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Kitchen, and What Each One Costs You
A full kitchen remodeling means making a dozen decisions in a few weeks. Here’s the short version of what actually matters.
- Cabinet boxes and doors: Plywood boxes outlast particleboard in a humid climate; KraftMaid and Wellborn both offer semi-custom door styles that fit standard Richmond Heights layouts. Flat-slab doors are cheaper, shaker doors cost more but hide wear better.
- Countertops: Quartz is the practical pick for most families, low-maintenance and non-porous. Granite costs less per square foot but needs sealing. Laminate saves thousands if budget is tight but shows seams.
- Flooring: Porcelain tile handles spills and humidity well. Luxury vinyl plank is cheaper and warmer underfoot. Engineered hardwood looks best in open-plan rooms but needs care near the sink.
- Appliances: Panel-ready refrigerators and induction ranges push the budget up but integrate cleanly. Standard stainless is the value play.
- Layout: Keeping the sink and range where they are saves thousands in plumbing and electrical. Moving them opens up the room but adds real cost.
What Full Kitchen Remodeling Costs in Richmond Heights, FL
Expect $14,000 – $45,000 for a full kitchen remodeling in Richmond Heights. Here’s how the number breaks down:
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Backsplash: $800 – $2,500
- Island: $3,000 – $10,000 if you add one
- A smaller or partial scope: $9,000 – $20,000
What pushes a job toward the low end: same footprint, standard cabinet sizes, no plumbing moves, and a tight appliance package. What pushes it high: relocating the sink or range, adding an island, opening a load-bearing wall, upgrading to semi-custom cabinetry, or discovering old wiring that has to be brought up to current code. Every estimate we write is line-item and upfront, so the number you see is the number you pay. We also take $1,000 off projects over $10,000 and offer 0% financing for 18 months.
See the difference
Before
After
Before
After
Before
AfterWhat Richmond Heights Homes Do to This Job
Richmond Heights is one of South Florida’s historically Black communities, and its housing stock reflects decades of change. Many homes are mid-century concrete block ranches on slabs with terrazzo or tile floors, and plenty have been updated with additions or second stories. That mix matters: on a 1960s ranch near the 33176 corridor, we’re often tying new cabinetry into walls that have shifted since the original build, and the limestone bedrock sits close to the surface here, so any wall move that needs a footing can hit rock fast. We’ve also learned to plan moisture barriers carefully, because the high water table and summer downpours find every gap. On newer infill builds, hurricane code compliance drives how we anchor and what glazing we spec. If your kitchen remodel grows into something wider, our Kitchen Remodeling in Richmond Heights page covers the broader scope, and homeowners often pair a kitchen with Full Bathroom Remodeling in Richmond Heights or Walk-In Showers & Shower Remodeling in Richmond Heights while the house is already torn up.
Serving Richmond Heights, FL – Our Local Coverage Area
We serve Richmond Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Full Kitchen Remodeling in Richmond Heights
Six to ten weeks is typical, with cabinet lead times and inspection scheduling as the main variables. Jobs that move plumbing or open a wall land closer to ten. Call (844) 761-9356 to get a timeline for your specific layout.
Yes, in nearly every case. Richmond Heights follows Miami-Dade County permitting, and anything involving plumbing, electrical, or structural changes requires permits and inspections. We pull them for you and schedule the inspections.
Yes, and it’s the smartest way to control cost. Keeping the sink, range, and existing footprint intact can save several thousand dollars and shorten the schedule. We’ll tell you honestly which changes are worth the spend.
Expect $14,000 – $45,000 depending on size, layout changes, and material grade. Cabinet installation runs $4,000 – $13,000, countertops $2,000 – $6,500. Call (844) 761-9356 for a free estimate on your kitchen.
The 730-Day Done Right Promise covers our workmanship for two years, one of the longest guarantees in residential construction. If something isn’t right, we come back and fix it.
Get a Free Estimate on Your Full Kitchen Remodeling
Call (844) 761-9356 to schedule a free on-site estimate for a full kitchen remodeling in Richmond Heights. We’ll walk the room, talk through layout and material choices, and leave you with a line-item written quote, not a ballpark. You’ll get a timeline, a firm price, and straight answers about permits and inspections. Our Kitchen Remodeling team covers the wider scope, and we serve all of Richmond Heights and nearby communities.
Written by the team at Groundwork Construction Co.