Full Bathroom Remodeling in Three Lakes, FL: What It Involves and What It Costs
A full bathroom remodeling in Three Lakes, FL typically runs $9,000 – $28,000 and takes 4 – 6 weeks of on-site work for a single hall or primary bath. That covers demolition to the studs, new waterproofing and tile, new fixtures, lighting, ventilation, and paint. The range swings widely because the difference between a straight swap and a job that moves plumbing or opens a wall is thousands of dollars. Call (844) 761-9356 to schedule a free on-site estimate.
How a Full Bathroom Remodeling Project Runs, Stage by Stage
We don’t hand you a calendar and disappear. Here’s the actual sequence, with the decisions you’ll make and roughly how long each stage takes on a Three Lakes bathroom.
Stage 1: Demolition and rough inspection (days 1 – 3)
We protect the floors and adjacent rooms, shut off water at the fixture valves, and tear out the tub or shower, vanity, toilet, tile, and drywall down to the studs. That’s when we find out what’s really behind the wall. In 1980s and 1990s Three Lakes homes, it’s often old cast-iron drain lines or aluminum branch wiring that need attention before anything new goes in. A Miami-Dade County inspector signs off on the rough plumbing and electrical before the walls close.
Stage 2: Rough-in and waterproofing (days 3 – 8)
New supply lines, drain relocation if you’re moving the shower or toilet, electrical for lighting and the exhaust fan, and then the waterproofing membrane for the wet area. You’ll choose your tile layout and grout color during this window so material is on site when the setter arrives. If you’ve picked a walk-in shower or tub-to-shower conversion as part of the wider scope, the framing and drain position get locked in now, not later.
Stage 3: Tile, flooring, and finishes (days 8 – 20)
Wall tile, floor tile, grout, and the curbless or curbed shower base go in. This is the longest single stretch because grout and thinset need cure time between coats. You’ll confirm trim, paint color, and hardware during this stage so nothing stalls.
Stage 4: Fixture and trim install (days 20 – 28)
Vanity, faucets, toilet, mirror, shower glass, and lighting go in. The exhaust fan gets wired and vented to the exterior, not into the attic, which matters in South Florida humidity. You’ll do a walkthrough with us here and flag anything that needs a touch-up.
Stage 5: Final inspection and punch list (days 28 – 35)
The county inspects the finished work, we handle the punch list, and you get a clean, dry bathroom back. Most full bathroom remodeling projects in Three Lakes close out within 4 – 6 weeks of demo day, assuming no surprises behind the wall.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make During a Full Bathroom Remodeling Build
These are the real decision points that shape your budget and how the bathroom holds up over the next 20 years.
- Shower base and tile: A curbless shower with a linear drain is the modern look and easier to age into, but it costs more in framing and waterproofing. A standard curbed base saves money and is faster to install. Porcelain tile is the workhorse; natural stone looks richer but needs sealing and costs more per square foot.
- Vanity and countertop: A stock vanity in the $800 – $3,000 range is the practical choice. Custom cabinetry and a stone top push higher but give you exact storage and a finished look. Brands like KraftMaid and Cambria come up here if you want a named, warrantied product.
- Fixtures and finishes: Kohler and similar lines sit in the middle of the market with solid warranties. Budget fixtures save upfront but show wear faster in a humid climate.
- Ventilation: A properly sized exhaust fan vented to the outside is non-negotiable in Three Lakes. It’s the difference between a bathroom that stays dry and one that grows mold behind the paint.
- Glass and doors: Frameless glass looks clean but costs more. Mr-Glass and similar suppliers carry the shower enclosures we specify most often.
What Full Bathroom Remodeling Costs in Three Lakes, FL
Expect $9,000 – $28,000 for a full bathroom remodeling in Three Lakes, with most jobs landing in the middle of that band. Here’s what moves the number:
- Size and layout: A hall bath under 50 square feet sits at the low end. A primary bath with a double vanity and separate shower climbs toward $28,000.
- Existing condition: Water damage, mold, or failing cast-iron drains found during demo add cost. We flag these in the written estimate as allowances rather than surprising you mid-job.
- Relocating plumbing or structure: Moving a toilet or shower drain is the single biggest jump. Keeping fixtures where they are saves thousands.
- Material grade: Porcelain versus natural stone, stock versus custom cabinetry, and fixture brand all shift the total.
- Permit scope: A Miami-Dade County permit for plumbing and electrical changes adds a line item but keeps the job legal and insurable.
Your written estimate is line-itemed, so you see material, labor, permit, and allowance costs separately. Upfront pricing means the number you see is the number you pay. 0% financing for 18 months and $1,000 off projects over $10,000 are available. This is part of a Bathroom Remodeling in Three Lakes scope that can also fold in a shower upgrade or vanity replacement if you want the whole room done at once.
See the difference
Before
After
Before
After
Before
AfterWhat Three Lakes Homes Specifically Do to This Job
Three Lakes is a built-out 1980s – 90s pocket of western Kendall, ZIP 33186, where almost every project is a remodel on an aging Mediterranean-style concrete-block home rather than new construction. That changes the bathroom job in three ways. First, the housing stock is now 30+ years old, so demo regularly turns up cast-iron drain lines and aluminum branch wiring that need replacing before the walls close. Second, permitting runs through Miami-Dade County’s post-Surfside product-approval and inspection regime, which governs the plumbing, electrical, and ventilation work on every bathroom permit. Third, tight HOA lots and shared walls in the villa and townhome communities mean staging, dumpster placement, and work hours are often set by the association, not just the county. We plan crews around all three. If the same house is due for a new roof or window upgrade, homeowners often pair this with Roof Repair in Three Lakes or a full Roof Replacement & Installation in Three Lakes while the house is already in remodel mode.
Serving Three Lakes, FL – Our Local Coverage Area
We serve Three Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Bathroom Remodeling in Three Lakes
Most full bathroom remodeling jobs in Three Lakes take 4 – 6 weeks of on-site work once demo starts. The biggest variables are permit turnaround through Miami-Dade County and whether demo reveals hidden plumbing or wiring issues. Call (844) 761-9356 for a realistic timeline on your specific bathroom.
Yes, if the job involves moving plumbing, adding electrical, or changing the ventilation, which most full bathroom remodels do. Miami-Dade County requires permits and inspections for that work, and skipping them can complicate a future sale or insurance claim. We pull the permits and pass the inspections as part of the job; call (844) 761-9356 to talk through your scope.
Yes, and keeping the toilet, shower, and sink where they are is the single biggest way to control cost. That avoids relocating drains and supply lines, which can push a job toward the high end of the $9,000 – $28,000 range. We’ll tell you honestly whether a layout change is worth it on your call at (844) 761-9356.
Full bathroom remodeling in Three Lakes runs $9,000 – $28,000, with most jobs in the middle of that band. Size, existing condition, material grade, and whether plumbing moves are the four levers that shift the total. Call (844) 761-9356 for a line-itemed estimate; estimates are free.
Every full bathroom remodeling project is covered by our 730-Day Done Right Promise. If the workmanship isn’t right, we make it right, backed in writing. Call (844) 761-9356 to review the details before you sign anything.
Get a Free Estimate for Full Bathroom Remodeling in Three Lakes
Call (844) 761-9356 to schedule your free on-site estimate for full bathroom remodeling in Three Lakes. A live person answers around the clock. We walk the bathroom, measure, note the condition behind the walls, and hand you a line-itemed written estimate with a realistic timeline. No pressure, no vague bids. Our Bathroom Remodeling service covers the full scope, and you can see the wider Three Lakes area we serve. Our technicians have up to 12 years of experience, and every crew member is background-checked and arrives in uniform.