Full Bathroom Remodeling in The Crossings: What It Involves and What It Costs
Full bathroom remodeling in The Crossings means gutting the room to the studs and rebuilding it – new tub or shower, vanity, tile, lighting, ventilation, and plumbing trim – and the typical job runs four to six weeks on site. For most 33186 homes, the real price lands between $9,000 and $28,000 depending on size and whether plumbing or walls move. Call (844) 761-9356 for a free on-site estimate.
How a Full Bathroom Remodel Runs, Start to Finish
We don’t hand you a schedule and disappear. Below is the actual sequence, with the decisions you’ll make at each stage so nothing stalls the job waiting on a question.
Stage 1 – Site protection and demolition (days 1-3)
Day one is floor protection, dust barriers, and shutting off water to the room. Then we demo tile, tub, vanity, toilet, and drywall down to the studs. If the original 30-year-old wallboard is hiding water damage behind the shower, this is where you find out – and we photograph it before anything is covered back up. You’re choosing tub versus shower base around now, because it affects rough-in.
Stage 2 – Rough-in plumbing and electrical (days 3-6)
New valve, drain, and supply lines go in, along with the exhaust fan, GFCI outlets, and lighting rough-in. If you’re relocating a fixture (moving the shower to the opposite wall, say), this is the stage where that cost lives. You’ll decide fan placement and whether you want in-floor heat rough-in before the concrete patch is poured.
Stage 3 – Inspection and waterproofing (days 6-9)
Miami-Dade plumbing and electrical inspections happen here, before walls close. Then we build the shower pan and apply a liquid or sheet waterproofing membrane. This step is invisible in the finished room and it’s the one that decides whether you have a mold problem in year five. You pick the tile layout and grout line now so the substrate matches.
Stage 4 – Tile, fixtures, and finish (days 9-24)
Wall tile, floor tile, curb, niche, and trim go down, then the vanity, toilet, glass, and fixtures set on top. Tile is the longest single stage. You’ll finalize vanity height, mirror and sconce placement, and hardware finish here.
Stage 5 – Punch and final inspection (days 24-35)
Caulk lines, touch-up, a full water test on every drain and supply, and the final county inspection. We walk the room with you and write a punch list on the spot. Anything on that list gets fixed before we call it done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Shape a The Crossings Bathroom
Most of the money and most of the regret live in a handful of decisions. Here’s the honest read on each.
- Shower base vs. tiled pan. A prefab acrylic base is faster and cheaper; a tiled pan with a linear drain looks better and costs more, and it depends on a correct waterproofing membrane. For a 30-year-old home, we lean tiled only when the subfloor is solid.
- Tile size and grade. Large-format porcelain (12×24 or bigger) means fewer grout lines and easier cleaning but needs a flatter substrate. Natural stone looks rich and demands sealing. Ceramic is the budget pick and holds up fine in a secondary bath.
- Vanity. A KraftMaid or Wellborn semi-custom cabinet gives you the door style and finish you want and survives humidity far better than a stock big-box unit. Off-the-shelf saves money; it shows within a few years.
- Ventilation. A properly sized, ducted exhaust fan is non-negotiable in South Florida humidity. Undersized fans are why so many original bathrooms here grow mildew on the ceiling.
- Glass and door style. Frameless glass costs more and needs careful measurement. A framed enclosure or a simple tub door saves budget for tile or plumbing.
Homeowners often pair this with Roof Repair in The Crossings when the same insurance inspection flags both the roof and an aging bath, or with Roof Replacement & Installation in The Crossings if the tile roof is at end of life.
What Full Bathroom Remodeling Costs in The Crossings, FL
A full bathroom remodel in The Crossings runs $9,000 to $28,000. That’s the working number for a typical 33186 hall or primary bath, and here’s what pushes a job toward each end of it:
| Line item | Typical range |
|---|---|
| Full bathroom remodel | $9,000 – $28,000 |
| Vanity installation | $800 – $3,000 |
| Shower replacement | $3,000 – $8,500 |
- Size and layout. A compact hall bath sits low in the range; a primary bath with a double vanity and larger footprint climbs.
- Existing condition. Hidden rot, failed waterproofing, or a slab that needs repair adds cost you can’t see until demo.
- Plumbing and electrical moves. Keeping fixtures where they are is the biggest lever. Relocating a drain or adding a circuit raises the number.
- Material grade. Porcelain and a stock vanity versus stone tile and semi-custom cabinetry is a multi-thousand-dollar spread on its own.
- Permit scope. A like-for-like refresh vs. a layout change with plumbing relocation changes the permit and inspection footprint.
Your written estimate itemizes demo, rough-in, tile, fixtures, and permit. It typically excludes structural surprises until demo reveals them, which is why we photograph everything before it’s covered.
See the difference
Before
After
Before
After
Before
AfterWhy The Crossings Homes Make This Job Different
The Crossings is a master-planned Kendall subdivision built almost entirely inside one ZIP, 33186, and nearly every home here is a late-1980s to 1990s CBS stucco house with a clay tile roof. That means bathroom work here is like-for-like renovation of original Mediterranean-style homes, not new construction – and pulling permits runs through Miami-Dade County and the City of Miami in a community that’s fully built out.
The part that trips up homeowners elsewhere is the association. Every job in The Crossings sits inside an HOA-governed tract, so exterior changes need architectural review. For a bathroom, that means the review board cares about anything visible from outside: window and door style, exterior vent and fan terminations, and paint or finish on an exterior wall the remodel touches. We plan the ARB submission and match exterior details to community standards before the first tile is set, so you aren’t facing a violation after the fact. Inside, the 30-plus-year-old housing stock shows its age: original plumbing that’s near end of life, single-pane windows that fog and leak, and bathrooms that grew mildew under undersized fans. South Florida humidity and the June-to-November storm window also push us to schedule exterior-facing work around the wet season.
We cover the whole area – see our Bathroom Remodeling in The Crossings page for the broader scope – and this level of detail is what our bathroom remodeling service delivers across The Crossings and neighboring areas like Three Lakes, Country Walk, The Hammocks, and Kendale Lakes.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Bathroom Remodeling in The Crossings
Most full bathroom remodels run four to six weeks on site. Demo and rough-in take about a week, inspections land around day nine, tile is the longest stage, and final inspection closes it out. Add a week if plumbing or electrical relocates. Call (844) 761-9356 to put a real date on your job.
Yes – any full remodel that moves plumbing, electrical, or structure needs permits through Miami-Dade County and the City of Miami, plus an HOA architectural review for anything visible outside. We pull the permits and manage the inspections. Call (844) 761-9356 to confirm what your project needs.
Yes, and keeping the layout is the single biggest saver. A like-for-like remodel – same tub location, same toilet, same vanity wall – stays in the low end of the $9,000 to $28,000 range. Relocating a drain or adding a circuit climbs from there. Call (844) 761-9356 for an exact quote.
It runs $9,000 to $28,000 for most 33186 homes, with size, existing condition, material grade, and permit scope moving the number. A compact hall bath sits near the bottom; a larger primary bath with a double vanity sits near the top. Call (844) 761-9356 – estimates are free.
Every full bathroom remodeling project is backed by our 730-Day Done Right Promise – if it isn’t done right, we make it right. Transparent pricing means the number on your written estimate is the number you pay, barring a documented structural surprise you approve first. Call (844) 761-9356 with questions before you commit.
Get a Free Estimate on Your The Crossings Bathroom
We do free on-site estimates for full bathroom remodeling in The Crossings. On the call, a live person answers around the clock, and we’ll schedule a walkthrough, talk through your layout, and hand you a written line-item quote. Call (844) 761-9356 to start. Our technicians have up to 12 years of experience and arrive background-checked and in uniform.