A Groundwork company - serving The Hammocks, FL
ADU Site Prep & Utilities in Three Lakes, FL | Groundwork Construction Co. of The Hammocks

ADU Site Prep & Utilities in Three Lakes - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Three Lakes, FL: What It Takes and What It Costs

ADU site prep and utilities in Three Lakes means getting a lot and a structure ready for a detached or attached accessory unit: site grading and drainage, the concrete slab or pier foundation, and the underground runs for water, sewer or septic tie-in, and electrical service. Most Three Lakes projects run 6 to 12 weeks of site and utility work before framing ever starts, and the whole job typically lands between $45,000 and $130,000 depending on whether you’re building fresh or converting existing space. Call (844) 761-9356 and we’ll walk your lot and give you a real number instead of a guess.

Call (844) 761-9356

How we sequence site prep and utilities before any framing starts

The order matters more than the speed. Here’s the actual sequence we run, stage by stage, and where you’ll be making decisions.

Stage 1: Site walk, utility locate, and survey (days 1 – 3)

We start by calling in the 811 utility locate so nobody hits a buried line, then we survey the buildable footprint against the setbacks and your HOA’s rear-yard and side-yard rules. You’ll decide then whether the unit goes detached in the back or attaches to the house, because that choice changes every number downstream. Expect two to three days here.

Stage 2: Demolition, clearing, and grading (days 4 – 8)

If there’s an existing slab, shed, or old paver patio in the way, this is where it comes out. We grade the pad so water sheds away from both the ADU and your main house, which matters in a flat lot with our storm-season rainfall. You’ll approve the final pad elevation and drainage direction before we pour.

Stage 3: Underground rough-in for water, sewer, and electric (days 8 – 15)

This is the part most homeowners underestimate. We trench the water service, the sewer or septic tie-in, and the electrical conduit to the main panel before any concrete goes down. If your main panel is already maxed out, you’ll decide here between a panel upgrade and a subpanel feed. Trenching and rough-in usually take about a week and a half, weather permitting.

Stage 4: Foundation pour and curing (days 15 – 25)

Concrete block stem walls or a poured slab, set to Miami-Dade High-Velocity Hurricane Zone tie-down standards. Cure time is the silent schedule-killer: concrete needs roughly a week before framing loads go on it. You’ll sign off on the finished slab and any anchor bolt placement before the inspector does.

Stage 5: Rough inspections and utility connections (days 25 – 40)

We schedule the underground and foundation inspections through Miami-Dade County, then make the final utility connections at the meter and main. That’s the last gate before your framing crew arrives. Your decisions here are the meter placement and whether the ADU gets its own service or sub-meters off the house.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between on a Three Lakes ADU

Every ADU site and utility package comes down to a handful of real forks in the road. Here’s the honest trade-off on each, not a sales pitch.

  • Slab-on-grade vs. pier foundation: A slab is faster and cheaper on flat lots, which is most of Three Lakes. Pier foundations cost more and add schedule but handle uneven fill better. On a level lot, a slab gets you a cleaner floor and a faster inspection.
  • Sewer tie-in vs. septic: Most Three Lakes lots are on county sewer, so a simple lateral tie-in is the path. If you’re on septic, a new drain field or tank upgrade pushes the number up and the timeline out.
  • Panel upgrade vs. dedicated subpanel: If your main panel has headroom, a subpanel feed is cheaper. If it’s the original 1990s panel and already full, an upgrade adds cost but is the right call for a unit with its own kitchen and AC.
  • Utility runs in trench vs. overhead feed: Underground is cleaner-looking and HOA-friendly, since no wires cross your roofline. Overhead is sometimes cheaper but often gets flagged in architectural review.
  • Water heater and HVAC placement: A tankless unit tucked in a utility closet saves floor space; a standard tank is cheaper up front. We’ll size the AC to the unit’s square footage, not to the house.

Fixtures inside the unit are a separate but related choice. We work with Silestone and Caesarstone quartz for the small ADU kitchenette counter, and Moen fixtures keep the plumbing package predictable.

What ADU site prep and utilities costs in Three Lakes, FL

For a Three Lakes ADU, site prep and utilities typically run $45,000 to $130,000 on their own, before framing, finishes, or the unit itself. The spread is wide because the variables are wide.

What pushes a job to the low end: a level, empty lot with sewer already at the property line, a panel with spare capacity, and a compact slab. What pushes it toward $130,000: an uneven or filled lot that needs grading and retaining, a septic upgrade, a full panel replacement, long utility runs to the back of the lot, and multiple HVHZ foundation details on a larger footprint.

A written estimate from us breaks out grading, foundation, each utility run, inspection fees, and site restoration as separate line items. What’s typically not in the site-prep number: the ADU structure itself, interior finishes, kitchen and bath packages, and landscaping beyond basic restoration. The number you see is the number you pay, and we pull the permits and pass the inspections rather than handing that back to you.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Three Lakes homes specifically do to this job

Three Lakes is a built-out 1980s-90s suburban pocket of western Kendall, and that shapes this job in ways a fresh subdivision wouldn’t. There’s no vacant land waiting for a ground-up build. Nearly every ADU here is added to an older Mediterranean-style concrete-block home with a barrel-tile roof, and that home is often already mid-way through its own re-roof or impact-window upgrade. So the utility work has to coordinate with the main house’s aging systems: original aluminum wiring, aging panels, and cast-iron drain lines that may already be at the end of their service life.

Permitting runs through Miami-Dade County’s post-Surfside product-approval regime and HVHZ wind standards, which means every anchor, tie-down, and glazing product gets reviewed up front. On tight HOA lots in Three Lakes, staging room is a real constraint, and architectural review committees want drainage and utility routing shown before they’ll approve. We plan around those review timelines so your crew isn’t standing idle.

Because the original roofs are hitting end-of-life and code requires a wind-mitigation retrofit on re-roofs, you’ll sometimes see neighbors re-roofing in clusters after a storm, and that permit wave affects inspection scheduling. We’re covering Three Lakes and route around it. If the wider project scope comes up, like a room addition attached to the same footprint, our Home Additions & ADU in Three Lakes work handles that side, and homeowners sometimes pair the ADU with Small & Partial Kitchen Remodels in Three Lakes or a Full Bathroom Remodeling in Three Lakes inside the main house once the unit is up.

If you’re weighing the full scope of Home Additions & ADU for your property, this page covers just the site and utility side. You can see the areas we cover on our Three Lakes page.

Serving Three Lakes, FL – Our Local Coverage Area

We serve Three Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: ADU Site Prep & Utilities in Three Lakes

Get a free on-site estimate for your Three Lakes ADU site prep

We’ll come out to your Three Lakes property, walk the lot, check the utility layout and panel capacity, and put a written line-item estimate in your hands. No-hassle upfront pricing, a real number on paper, and the 730-Day Done Right Promise behind the work. Calls are answered by a live person around the clock. Call (844) 761-9356 to schedule your free estimate.

Written by the team at Groundwork Construction Co.

Why Three Lakes Chooses Groundwork Construction Co. of The Hammocks

We set the standard for ADU site prep & utilities in Three Lakes.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Three Lakes

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Three Lakes Customers Say

Trusted by homeowners across Three Lakes and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for ADU Site Prep & Utilities in Three Lakes?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Three Lakes.

(844) 761-9356

Request a Free Estimate in Three Lakes

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch