Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in West Perrine, FL: What the Job Actually Involves
Vanities, tile, and fixtures in West Perrine run $9,000 – $28,000 for a full bathroom refit, with most of that spent on tile and the vanity rather than the fixtures themselves. A typical job takes 3 – 4 weeks from demo to final caulk, including the county inspections that come with any plumbing or electrical change. The number moves fast depending on square footage, whether plumbing relocates, and the tile grade you pick. Call (844) 761-9356 and we’ll walk you through it.
Most homeowners here are replacing a 1970s-era vanity, chipped floor tile, and builder-grade fixtures in one pass. That’s the job this page covers. If the project widens into walls, layout, or a full teardown, that’s part of a full Bathroom Remodeling in West Perrine scope and we’ll tell you straight when it crosses that line.
How We Sequence Vanities, Tile & Fixtures Work in West Perrine
Every job here runs the same five stages. The homeowner makes the decisions at each one, and the schedule doesn’t move unless a decision sits.
- Stage 1 – Site check and as-built (day 1). We measure the room, verify the drain and supply locations, and confirm the wall structure behind the vanity. In West Perrine’s older concrete-block homes, this is where we find out if the original aluminum wiring needs updating before a new GFCI circuit goes in. You decide: keep the layout or move the sink and outlets.
- Stage 2 – Demo and rough-in (days 2 – 5). We strip the old vanity, tile, and fixtures, then bring in the plumber and electrician for the rough-in. This is the stage where a hidden leak or a wall that needs a moisture barrier gets caught. You decide: fixtures now, because the rough-in has to match what’s going on the wall.
- Stage 3 – Tile and substrate (days 5 – 12). Backer board, waterproofing, then floor and wall tile. A standard 40-square-foot floor plus a tub surround takes four to five days for a careful setter. You decide: tile layout, grout color, and trim before this stage opens.
- Stage 4 – Vanity and fixture install (days 12 – 16). The vanity cabinet sets, the top goes on, and the sink, faucet, toilet, and shower trim get mounted. You decide: nothing at this point, which is the whole reason we lock the order early.
- Stage 5 – Final inspection and punch (days 16 – 20). County plumbing and electrical inspections, then sealing, caulk, and your walkthrough. You decide: the punch list, sign off, and we schedule the warranty coverage.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Vanities, Tile & Fixtures Options You’ll Actually Choose Between
Here’s where the money separates. These are the real choices West Perrine homeowners make, with the honest trade-off on each.
- Vanity cabinet: stock plywood boxes run $300 – $900 and survive a humid bathroom fine if the finish is sealed; solid-wood custom units cost $1,200 – $2,800 but hold up longer and can be cut to a tight clearance.
- Vanity top: quartz surfaces from Silestone or Caesarstone run $900 – $2,200 installed and shrug off mold and standing water, while cultured marble runs lower but stains over time.
- Floor and wall tile: porcelain ($4 – $9/sq ft installed) is the workhorse here because it resists moisture, while natural stone ($10 – $20/sq ft) looks richer but wants sealing twice a year in this climate.
- Fixtures: Kohler and Moen both hold up well in a subtropical bathroom; the trade-off is finish – brushed nickel shows water spots, chrome wipes clean, and matte black chips if dropped.
- Exhaust and moisture control: a properly sized fan vented to the exterior (not the attic) is the single biggest guard against the mold West Perrine’s May – October rainy season invites.
What Vanities, Tile & Fixtures Costs in West Perrine, FL
The full range is $9,000 – $28,000. That covers a standard bathroom’s vanity, floor and wall tile, and fixtures, including permit and inspection. Where you land inside that range depends on five things:
| Line item | Typical range |
|---|---|
| Bathroom vanity installation | $800 – $3,000 |
| Tile (floor + walls) | $3,000 – $9,000 |
| Fixtures (faucet, sink, toilet, shower trim) | $1,200 – $4,500 |
| Plumbing and electrical rough-in | $1,500 – $5,000 |
| Permit and inspections | $300 – $1,200 |
What pushes the number up: relocating the sink or toilet (new drain line), adding a second vanity, natural stone instead of porcelain, and legalizing an unpermitted add-on room before work starts. What keeps it down: keeping the layout, stock vanity cabinet, porcelain tile, and a smaller footprint.
A written estimate from us lists every line above with a fixed price. What it doesn’t include until you approve it: structural repairs found behind the tile, or a full tear-out if the existing shower pan has failed. We price those separately and in writing before we touch them, so the number you sign is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat West Perrine’s Homes Do to a Vanities, Tile & Fixtures Job
West Perrine (ZIP 33157) sits at the high point of Miami-Dade’s limestone ridge, and that rock shows up in this work more than you’d expect. Excavations for anything below grade hit coral rock that gets chipped rather than dug, and that same hard limestone changes how moisture moves under a slab. In practice, we check for failed shower pans and slab leaks before setting new tile over them, because the original 1950s – 1980s concrete-block homes here often have shallow slabs and original aluminum wiring that a new vanity outlet will expose.
Many houses on this side of US-1 have add-on rooms built without permits, so a bathroom refresh sometimes starts with an as-built survey and legalization. Inspectors know this area’s older homes well, and the county treats work near the urban development boundary as sensitive, which means a clean, correct permit package saves you weeks. The subtropical rainy season also shapes scheduling: plan tile and grout work before May if you can, since daily afternoon downpours and high humidity slow cure times and invite mold in enclosed assemblies.
Serving West Perrine, FL – Our Local Coverage Area
We serve West Perrine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in West Perrine
Most jobs run 3 – 4 weeks, with tile setting and cure time taking the longest stretch. Call (844) 761-9356 for a schedule built around your room.
Yes, if the plumbing or electrical moves, and a vanity replacement usually moves at least the outlet. A pure tile swap over the same layout may not need one. We pull the permits and pass the inspections so you’re covered. Call (844) 761-9356 to confirm your scope.
Often yes, especially if the new cabinet matches the existing drain and supply locations. That keeps the job at the low end of the $9,000 – $28,000 range. Call (844) 761-9356 and we’ll measure first.
Plan on $9,000 – $28,000 depending on tile grade, layout changes, and whether the wiring needs updating. Call (844) 761-9356 for an exact free estimate.
Every vanities, tile & fixtures job is backed by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship well past the first year. Call (844) 761-9356 to talk through the details.
Homeowners often pair a bathroom refresh with exterior work at the same time – we also handle Tile Roofing in West Perrine and Specialty Roofing in West Perrine for the whole-property picture. You can see the full Bathroom Remodeling range we offer, and where we work across West Perrine, on those pages.
Get a Free Estimate for Vanities, Tile & Fixtures in West Perrine
Call (844) 761-9356 for a free on-site estimate. We’ll measure the room, confirm the plumbing and wiring, and hand you a written, line-item price the same visit – no change orders, 0% financing for 18 months, and $1,000 off projects over $10,000. A live person answers around the clock, so you’re never stuck in a voicemail.
Written by the team at Groundwork Construction Co..