Tub-to-Shower Conversion in Sunset, FL: What It Involves and What It Costs
A tub-to-shower conversion in Sunset, FL typically runs $3,500 – $10,000 and takes about one to two weeks from demo to final inspection, depending on whether the drain and plumbing stay where they are. The job means removing the tub and its surround, prepping the wet area, waterproofing, setting a new shower base or a curbless sloped floor, tiling, and installing new fixtures and a glass or curtain enclosure. Call (844) 761-9356 to schedule a free on-site estimate.
How Our Tub-to-Shower Conversion Process Actually Runs
Every conversion we do has the same backbone, but the day-to-day looks different based on what’s behind the wall. Here’s the real sequence so you know what to expect and what you’ll be deciding, and when.
Day 1: Protection, demo, and discovery
We lay floor protection, shut off water, and pull the tub and surround out. This is the discovery day: we open the wall and check for the two things that show up constantly in older Sunset homes – a rotted subfloor around the drain and old galvanized or copper lines that don’t match a modern valve. You’ll get a call the same day if anything found changes the scope, with a price before we proceed. No change orders slipped in after the fact.
Day 2 – 3: Rough-in and inspection
We relocate the drain if you’re going curbless or moving the layout, set the new shower valve (pressure-balance or thermostatic), and address any framing issues. If the valve moves or the drain relocates, we pull the plumbing permit through Miami-Dade County and schedule the rough-in inspection. The homeowner’s job here is choosing the valve trim and confirming the shower footprint before the floor is set. This stage usually takes two working days, plus inspection scheduling.
Day 3 – 4: Waterproofing
We install a cement or foam backer board, then a bonded sheet membrane or a liquid-applied waterproofing system, and flood-test the pan. This is the stage that decides whether the shower lasts 20 years or fails in three. You don’t have to make any decisions here except whether you want a shower niche and where it goes.
Day 5 – 8: Tile and finish work
Your chosen tile goes up on walls and floor, grout and caulk are set, and the shower valve trim, head, and any bench or niche get finished. This is where patience matters: grout needs to cure before the glass goes on. A standard 3′ x 5′ footprint with 12″ x 24″ wall tile usually runs three to four days of setting. Mosaic-heavy or herringbone patterns add a day or two.
Day 9 – 10: Enclosure, fixtures, and final inspection
Glass panels or a framed enclosure go in, the drain cover, trim, and any grab bars are installed, and we walk the county inspector through the finished job. You get a final walkthrough with us where we test the drain slope, check for leaks, and hand over care instructions. Total: about two weeks for a straightforward conversion, three or more if plumbing or structure has to be moved.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for Your Sunset Conversion
Most of the question of whether your conversion feels like a cheap motel shower or a real upgrade comes down to four choices. Here’s the honest version of each.
- Shower base vs. curbless sloped floor. A prefab acrylic or cultured-marble base is the budget choice, roughly $300 – $800 installed, and it’s durable. A tiled curbless floor costs $1,200 – $2,500 more but looks custom and lets you age in place without a trip hazard. Curbless requires the drain to be moved, which is why it’s rarely a straight swap.
- Wall surround material. Acrylic surrounds ($500 – $1,200) are fast and low-maintenance but read as builder-grade. Porcelain or ceramic tile ($1,500 – $4,500) is what most Sunset homeowners choose for a mid-range conversion. Natural stone (travertine, marble) runs $3,000 – $6,000 and needs sealing and more careful maintenance in Florida’s humidity.
- Shower valve and fixtures. Pressure-balance valves are code-minimum and cost $150 – $350. Thermostatic valves ($400 – $800) let you set an exact temperature, which matters if you have kids or older family members. Kohler and similar brands we work with sit in the durable mid-to-high range.
- Enclosure. Framed glass ($400 – $900), semi-frameless ($800 – $1,500), or full frameless ($1,200 – $2,500). Frameless looks best and cleans easiest; framed is what you choose when the budget goes to the shower floor instead.
One more decision: bench or no bench. A tile bench runs $400 – $900 and takes up floor space. Grab bars are cheaper and more flexible if aging-in-place is a future concern.
What a Tub-to-Shower Conversion Costs in Sunset, FL
Expect $3,500 – $10,000 for a tub-to-shower conversion in Sunset, FL. The low end is an acrylic surround on the existing drain footprint; the high end is tile, a curbless floor, moved plumbing, and a frameless enclosure.
Here’s what moves the number:
- Whether plumbing moves. Keeping the drain where the tub’s is saves roughly $800 – $2,000. Relocating the drain or valve for a curbless floor or a different footprint pushes you toward the high end.
- Existing condition behind the wall. Rotted subfloor, old galvanized lines, or missing blocking adds $500 – $2,500. In homes built before 1994, we plan for at least some of this.
- Tile grade and pattern. Large-format porcelain on a straight lay is efficient. Mosaic floors, herringbone, and natural stone add labor and material.
- Permit scope. A straight fixture swap is minimal paperwork. Relocating the drain triggers a plumbing permit through Miami-Dade County UMS and adds inspection time.
- Enclosure and fixtures. The difference between a $400 framed enclosure and a $2,500 frameless one is often half the job’s variance.
A written estimate covers demo, disposal, waterproofing, tile, base or floor build, valve, and enclosure. It usually excludes design fees, mold remediation if we find it, and structural repair beyond the shower wall. That last point matters: if we open the wall and find water damage that runs into adjacent framing, that’s a scope change and you’ll see the price before we touch it. Upfront pricing, no surprises is how we work, and our 730-Day Done Right Promise covers the workmanship after the final walkthrough.
See the difference
Before
After
Before
After
Before
AfterWhat Sunset Homes Specifically Do to This Job
Sunset is unincorporated Miami-Dade, which means permits and inspections go through the county’s Unincorporated Municipal Services office, not a city hall. That’s a scheduling reality, not a technicality: it can add a week or more to a tub-to-shower conversion that moves plumbing, and it’s the step out-of-area crews get tripped up on. Houses here were largely built between the 1950s and 1970s, so we open walls on tile tub surrounds that have been patched two or three times and find the original 2″ drain plumbing under a lot of that. In the ZIP 33173 blocks off Sunset Drive and the side streets running toward the Kendall edge, we regularly see the same failure: a small leak behind a decades-old tub surround that rotted the subfloor quietly for years before the homeowner noticed. We also do the feasibility work up front, because a curbless floor in a 1960s slab house often needs a cut-and-rebuild of the drain that wouldn’t be needed in a newer build. If your conversion is part of a wider project, our Bathroom Remodeling in Sunset page covers the full scope, and homeowners often pair a new shower with Metal Roofing in Sunset or Tile Roofing in Sunset when the same storm season exposed roof issues.
Serving Sunset, FL – Our Local Coverage Area
We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Sunset
A standard conversion takes about one to two weeks of active work, plus inspection scheduling if plumbing moves. The sequence runs roughly: demo on day one, rough-in and inspection over days two to three, waterproofing on day three to four, tile through days five to eight, and enclosure plus final inspection on the last two days. A complex tile pattern or a curbless rebuild can stretch this to three weeks. Call (844) 761-9356 for a realistic timeline on your specific bathroom.
Yes, you typically do, and in Sunset it goes through Miami-Dade County’s UMS office rather than a local building department. Any change to the drain, valve, or waterproofing system requires a plumbing permit and an inspection of the rough-in and the final. A straight replacement of identical fixtures without moving anything is the one case where paperwork is lightest. We pull the permit and schedule the inspections as part of the job. Call (844) 761-9356 to confirm what your Sunset address needs.
Yes, and it’s the most common way we do it. If the drain and valve stay where they are, we set a shower base over the existing tub footprint and finish the walls. The trade-off is you keep a standard 30″ x 60″ footprint and can’t go curbless without relocating the drain. If you want a walk-in with no curb, budget for the drain move and the extra permit scope. Call (844) 761-9356 to talk through which fits your space.
Most conversions in Sunset land between $3,500 and $10,000. The low end is an acrylic surround on the existing drain. The high end is tile walls, a curbless floor, a relocated drain, and a frameless glass enclosure. Rotted subfloor, old line replacement, and mold remediation are the most common surprises that push a job toward the top of the range. Call (844) 761-9356 for an exact quote – estimates are free and itemized line by line.
Our workmanship is covered by the 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. That covers the install – waterproofing, tile, drain slope, and fixture set – for two full years after the final walkthrough. If something fails because of how we built it, we make it right. The shower valve and enclosure carry their manufacturers’ warranties on top of that. Call (844) 761-9356 to schedule your free estimate and see the written scope before you commit.
Get a Free Tub-to-Shower Conversion Estimate in Sunset
We’ll come out, measure the bathroom, check the drain and valve, and tell you honestly whether a straight swap or a curbless rebuild fits your space and budget. You’ll leave the visit with a written, line-item estimate and a clear timeline. If the conversion is part of a bigger plan, our Bathroom Remodeling service and the Sunset service-area page show the full picture. Call (844) 761-9356 – a live person answers around the clock, and estimates are free.