Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Kendall West: What the Job Actually Involves
A tub-to-shower conversion in Kendall West typically runs $3,500 to $10,000 and takes five to eight working days from demolition to final walkthrough, depending on whether the drain moves and how much of the original wall tile you’re keeping. A direct swap over an existing tub footprint, keeping the same drain location, sits at the low end. A conversion that widens the opening, moves the valve, or rebuilds the wall backer lands at the high end. Call (844) 761-9356 and we’ll price your specific bathroom, not a ballpark.
How the Five Stages Run, Day by Day
Most homeowners picture a conversion as a two-week blur. It isn’t. Here’s the real sequence we follow in Kendall West, and what you’re deciding at each point.
Stage 1: Measure, Verify, and Decide the Footprint (1 day)
We pull the actual tub dimensions and check the drain position, the valve height, and what’s behind the tile or wall panel. This is where you choose whether the shower takes the full alcove or leaves a small seat or storage niche. If the drain has to move, that decision happens now, not mid-demo.
Stage 2: Demolition and Substrate Prep (1 – 2 days)
Out comes the tub, the tile surround, and any rotted backer. In a lot of the late-1980s and 1990s CBS homes here, we find moisture damage at the tub apron and behind the lower wall – that gets caught at this stage, not after the new tile is up. We set the drain and prep the subfloor for the new pan.
Stage 3: Plumbing and Rough-In (1 day)
The new valve, trim, and drain get set and checked for leaks. If you’re going from a tub-and-shower combo to a shower-only, the old tub spout line is capped at the wall. This is the point where you confirm fixture finish and rough-in height, so the trim you picked actually matches what’s going in the wall.
Stage 4: Waterproofing, Tile, and Glass Template (2 – 3 days)
Backer board, waterproof membrane, then tile on the walls and pan. We template the glass after tile is set, so the enclosure fits the actual opening rather than a nominal measurement. You pick grout and trim at the start of this stage.
Stage 5: Fixture Install, Glass, and Walkthrough (1 day)
Showerhead, valve trim, drain cover, glass panel and door go in. We run water, check for leaks and slope, and walk the job with you before we pack up. That walkthrough is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
The choices below are where the price and the long-term durability actually live. Here’s the honest trade-off of each.
- Acrylic or fiberglass shower pan and wall kit: lowers cost, installs fast, and holds up well in a humid climate because there’s no grout to fail. It reads builder-grade, and scratches are hard to repair. Suits a rental, a guest bath, or a tight budget.
- Tile walls with a tile or pre-formed pan: the most common choice in Kendall West, and it lets you match the rest of the house. Costs more in labor and needs proper waterproofing behind it. Suits homeowners who plan to stay.
- Prefab versus custom pan: a prefab pan is cheaper and faster; a custom pan lets you fit an odd alcove exactly and slope the floor properly. Worth it when the existing tub footprint is irregular.
- Fixture finish and brand: standard chrome or brushed nickel runs lower than specialty finishes. Kohler and Moen trim are the ones we’re asked for most; the valve body is where you don’t want to cheap out.
- Glass enclosure: framed glass costs less, frameless looks cleaner. Both add to the job; a shower-only conversion almost always wants at least a fixed panel.
- Curb versus curbless: a curbless entry is the upgrade people ask about, but it usually means a recessed pan and a drain move, which pushes you up the price range.
What Tub-to-Shower Conversion Costs in Kendall West, FL
The lead number for this job is $3,500 to $10,000. Here’s what pushes a project toward one end or the other:
- Existing condition: hidden rot or failed waterproofing adds demo and substrate time. A clean tub-out sits low; a rebuild sits high.
- Drain and plumbing location: keeping the drain where it is keeps the job in the lower half of the range. Moving it adds rough-in and inspection.
- Material grade: an acrylic kit versus full tile with a custom pan is the single biggest swing.
- Glass and door style: frameless versus framed, door versus fixed panel.
- Permit scope: a valve and drain change usually triggers a plumbing permit. A cosmetic swap over the same plumbing often doesn’t.
Your written estimate should spell out demo, disposal, substrate, waterproofing, tile or panel, plumbing rough-in, glass, and permit. It should also state clearly what’s not included – moving a wall, adding a niche, or relocating the showerhead to a different wall. No-hassle upfront pricing means the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Kendall West Homes Specifically Do to This Job
Most of the bathrooms we convert here sit inside the single-family and low-rise villa homes built from the late 1980s into the 2000s across ZIP 33193. The walls are typically CBS with stucco, which is good news for a conversion: solid substrate behind the tile, and fewer structural surprises than you’d find in older interior Miami neighborhoods. The recurring issue is moisture at the tub apron and behind the lower surround, because South Florida’s humidity and the heavy summer storms find any failing caulk joint. Houses on the western edge, backing the Everglades conservation buffer, also fall into stricter setback and drainage review, so if the conversion grows into anything touching the slab or footprint, that review shapes the schedule. And because this is a build-out of the 1980s through 2000s, the original tubs are often at the end of their life right about now – which is exactly why the calls come in. We cover the full area; see our Kendall West service page, and if you’re planning more than one bathroom, this work often folds into a full Bathroom Remodeling in Kendall West scope. Homeowners often pair this with exterior projects like Metal Roofing in Kendall West or Tile Roofing in Kendall West when they’re already scheduling trades.
Serving Kendall West, FL – Our Local Coverage Area
We serve Kendall West and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Tub-to-Shower Conversion in Kendall West
Most conversions take five to eight working days, with a couple of inspection-day gaps if plumbing is permitted. The demo and prep run first, tile and waterproofing take the middle stretch, and the final day is fixtures and glass. Call (844) 761-9356 for a schedule based on your bathroom.
Usually, if the drain or valve moves, a plumbing permit is required; a surface-level swap over the same plumbing often doesn’t need one. We pull the permit when it’s needed and handle the inspection. We’ll tell you up front which side of that line your job falls on. Call (844) 761-9356 to confirm your scope.
Yes – staying on the existing drain and valve keeps the job simpler and cheaper. If the tub and shower drain already share a location, we can keep it; if you want a curbless entry or a relocated showerhead, that’s when plumbing moves. Call (844) 761-9356 and we’ll check your layout.
The range is $3,500 to $10,000, driven mostly by tile versus acrylic, drain location, and glass style. Hidden water damage can push the number up. Call (844) 761-9356 for an exact quote – estimates are free.
Every conversion is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. The fixtures and glass carry their own manufacturer coverage. Call (844) 761-9356 to ask what’s covered on your specific job.
Get a Free Tub-to-Shower Conversion Estimate in Kendall West
We’ll come out to your Kendall West bathroom, measure the alcove, check the drain and substrate, and give you a written line-item quote – no ballpark, no surprises. On the call we ask a few questions about your tub, your timeline, and what you’re hoping for, then schedule the free on-site estimate. Call (844) 761-9356.
Written by the team at Groundwork Construction Co.