Tub-to-Shower Conversion in Country Walk, FL: What It Costs and How Long It Takes
A tub-to-shower conversion in Country Walk runs $3,500 – $10,000 and usually takes 5 to 10 working days from demo to final inspection, though a straightforward swap in a typical Country Walk hall bath often lands closer to a week. The job means pulling the tub, reworking the drain and valve wall, waterproofing, setting a shower pan and tile, and getting the work inspected under Miami-Dade County permitting. For an exact number on your bathroom, call (844) 761-9356 and we’ll walk the room with you.
How the Conversion Actually Runs, Day by Day
We stage tub-to-shower work in five passes. Each one has a decision point for you, and knowing them in advance is the difference between a calm week and a surprise.
1. Demo and drain survey (day 1). Out comes the tub, the surround, and any rotted backer behind it. In Country Walk’s 1980s – 90s CBS homes, this is where we find out whether the original tub drain lines up with a standard shower drain position. If the drain sits where a centered pan needs it, great. If not, you decide whether to shift a few inches or redesign around the existing drain.
2. Rough-in and valve work (days 2 – 3). The old tub spout and valve get replaced with a pressure-balance or thermostatic shower valve. We set the new drain, adjust the supply lines, and open the wall just enough to add blocking for grab bars and a bench if you want them. This is your decision window for fixture brand and valve type – a Moen or Kohler trim set affects both the price and how the finished wall reads.
3. Waterproofing (days 3 – 4). A cement backer board goes up, then a bonded waterproof membrane over the walls and pan. In South Florida’s humidity, this step is non-negotiable – a failed membrane behind tile is the reason so many showers here start smelling musty within three years. We flood-test the pan before anything else goes on top.
4. Tile and finish (days 5 – 8). Floor tile, wall tile, niche, and grout. This is where most of your visual choices live, and where the schedule stretches if you picked a large-format tile or a niche that needs extra framing.
5. Glass, trim, and inspection (days 8 – 10). Shower door, trim, caulk, and the final inspection. The glass alone can add a few days if it’s a custom cut, so choose the door style early, not on day nine.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
What You’re Choosing Between: Materials and Configurations
The bone of a tub-to-shower conversion is the shower pan and wall system. Here’s the honest read on each option we install.
- Acrylic or fiberglass pan and surround. The fastest and cheapest route, and it wipes clean easily. The trade-off: fewer color choices, and it can crack over time in a home with heavy use. Suits a hall bath or a rental.
- Tiled pan with a mortar bed. The traditional build. You get the exact size and slope you want, and it matches the rest of the bathroom. It costs more and needs real waterproofing skill, which is where a careful installer earns their keep.
- Tiled walls in porcelain or ceramic. Porcelain is denser and holds up to Florida’s hard water better than ceramic. Large-format tile means fewer grout lines but more skill and a higher install price.
- Natural stone or quartz-look tile. Silestone and Caesarstone for a vanity top, plus a matching stone or stone-look tile in the shower, gives a high-end read. The catch is maintenance and cost – natural stone needs sealing, and cut pieces add to the bill.
- Frameless glass versus a prefab door. Frameless glass opens the room visually and suits a larger shower; a prefab door is the practical pick for a tight one. We measure before you commit, since a custom panel adds cost and lead time.
- Niche, bench, and grab-bar blocking. Each is a small upcharge, and each has to be decided before waterproofing.
What Tub-to-Shower Conversion Costs in Country Walk, FL
Expect $3,500 – $10,000 for a full tub-to-shower conversion here, with most Country Walk jobs landing mid-range. The number moves on five things, and we’ll show you each one in a written line-item quote.
- Shower size and shape. A standard 30″ x 60″ alcove keeps cost down; a longer or angled shower means more tile, more glass, and more framing.
- Existing condition. Hidden rot behind the tub, a failing drain, or a wall that needs reframing adds labor. Country Walk’s concrete-block walls often need short furring strips to hold new backer board.
- Relocating plumbing, electrical, or structure. Moving the drain or adding a light in the shower means open wall, new rough-in, and a bigger permit scope. Leaving the valve and drain where they are keeps you toward the low end.
- Material grade. Acrylic at the low end, tiled walls and a tiled pan in the middle, stone or large-format porcelain at the top.
- Permit scope. A County permit for the drain and valve change is standard. Adding electrical or moving walls widens the permit and the inspection list.
A written estimate should spell out demo, rough-in, waterproofing, tile, glass, fixtures, permit, and cleanup. What’s often missing from competitor quotes: the flood-test, disposal of the old tub, and whether glass is included at all. Ask before you compare.
See the difference
Before
After
Before
After
Before
AfterHow Country Walk’s Housing Stock Shapes This Job
Country Walk is a master-planned west Kendall subdivision built out largely in the 1980s and 1990s, so most of what we work on here is a maturing, uniform housing stock inside a tight HOA framework. That matters for a tub-to-shower conversion in two ways. First, Miami-Dade County permitting and inspection apply to the drain and valve work, and the Country Walk HOA’s architectural review adds a layer many neighboring areas don’t impose – if your project changes the exterior footprint or a window, expect an HOA review. Second, the original tubs and surrounds in these homes are now 30-plus years old, and the failures we see are consistent: cracked acrylic surrounds, membrane-free backer behind tile that’s been quietly leaking, and drain assemblies that are past their service life. The good news is a conversion is a contained interior job, so most Country Walk projects stay inside the home and out of the HOA review. When a full redo is in the cards, this often fits inside a broader Bathroom Remodeling in Country Walk, and homeowners sometimes pair the work with re-roofing or exterior upgrades through Metal Roofing in Country Walk or Tile Roofing in Country Walk.
Serving Country Walk, FL – Our Local Coverage Area
We serve Country Walk and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Country Walk
Plan on 5 to 10 working days from demo to inspection, with most Country Walk jobs finishing around a week. Custom glass adds a few days of lead time, so the door style gets chosen early.
Yes – the drain and valve change requires a Miami-Dade County permit, and the work is inspected. We pull the permit and walk the inspection. Call (844) 761-9356 for an exact scope on your bathroom.
Usually yes. If the existing drain and valve sit where the new shower needs them, we keep them and stay toward the low end of the range. Moving the drain or adding a light widens the scope and the permit.
The range is $3,500 – $10,000, driven by shower size, existing condition, material grade, and permit scope. Call (844) 761-9356 for a free, written line-item quote – no guesswork.
All of our work is covered by the 730-Day Done Right Promise – if it’s not done right, we make it right. You’ll also have the manufacturer warranty on fixtures.
Get a Free Tub-to-Shower Conversion Estimate in Country Walk
Call (844) 761-9356 for a free on-site estimate. We’ll walk the bathroom, check the drain and valve position, outline your material options, and put a line-item number in front of you – no vague bid, no surprises. Upfront pricing, a live person on the phone, and the 730-Day Done Right Promise on every job. We cover all of Country Walk and the surrounding west Kendall area.
Written by the team at Groundwork Construction Co. of The Hammocks.