A Groundwork company - serving The Hammocks, FL
New Detached ADU in Tamiami, FL | Groundwork Construction Co. of The Hammocks

New Detached ADU in Tamiami - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Tamiami, FL: What It Costs and How Long It Takes

A new detached ADU in Tamiami typically runs $53,100 to $153,400 for a modest one-bedroom unit, while a fully finished two-bedroom with its own kitchen and full bathroom pushes toward the ADU construction range of $106,200 to $259,600. Plan on 6 to 10 months from signed contract to certificate of occupancy, with permitting alone eating 8 to 14 weeks in unincorporated Miami-Dade. Call (844) 761-9356 to set up a free on-site estimate and get a real number for your lot.

Call (844) 761-9356

How a Detached ADU Gets Built in Tamiami, Stage by Stage

Most homeowners assume the hard part is picking finishes. It isn’t. The schedule lives or dies on the front end, so here’s what actually happens after you sign.

Stage 1 – Site walk and feasibility (week 1). We measure setbacks, check where the septic or sewer lateral runs, and confirm the buildable envelope against Miami-Dade zoning for your lot in 33184. You decide the footprint and whether the unit gets its own utility meter. This is the stage where a lot that looked big enough on paper turns out to have a 5-foot side setback problem, and we’d rather find that in week one than month three.

Stage 2 – Permit drawings and product approvals (weeks 2 through 14). Your plans go to Miami-Dade for review, and here’s where Tamiami projects really slow down: every window, door, shutter and roof assembly needs a Florida Product Approval or a Miami-Dade NOA number before the plans examiner signs off. We assemble those approval numbers up front so the review doesn’t bounce back. You decide the impact glazing package and the roof system during this window, because both have to be locked to get the permit.

Stage 3 – Site prep and foundation (weeks 15 through 18). Clearing, grading, underground plumbing, and a monolithic slab or stem-wall foundation, depending on your soil and the engineered design. Inspections happen at trench, rebar, and slab pour. You don’t decide much here, but you do need to keep your driveway clear and know that a summer thunderstorm can cost two days.

Stage 4 – Shell, rough-ins, and roofing (weeks 19 through 28). Block walls or wood frame, tie-beam, roof deck and tile or shingle, then electrical, plumbing, and mechanical rough-ins, each with its own inspection before the walls close. This is the longest stretch and the one homeowners underestimate. You lock in rough-in locations for outlets, the mini-split or ducted HVAC, and the water heater now, not later.

Stage 5 – Finish and final inspection (weeks 29 through 38). Drywall, cabinetry, flooring, trim, fixtures, paint, and the final mechanical, electrical, and building inspections that lead to your certificate of occupancy. You pick finishes back in stage 2, so this stretch moves if materials are on site. Most jobs land in a single pass, but a failed final inspection over a missing GFCI or an unsealed penetration can add a week.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Detached Unit

Once the permit is moving, the real decisions are about materials and how the unit will live. The trade-offs below are the ones that come up on nearly every Tamiami project.

  • Block versus wood frame. Concrete block costs more up front but handles salt air and humidity better and matches the surrounding ranch homes; wood frame is faster to erect and usually cheaper, but it needs careful moisture detailing in this climate.
  • Impact glazing versus shutters. Impact windows and doors cost more but eliminate the storm-prep scramble every June and meet the wind-borne-debris standard built into the code. Accordion or panel shutters are cheaper and still compliant, but you’ll deploy them every time a storm threatens.
  • Roof system. Barrel tile matches the neighborhood and lasts, but it’s heavier and pricier per square. Architectural shingle from GAF or CertainTeed is lighter on the budget and still meets wind uplift ratings when installed to spec.
  • Exterior cladding. James Hardie fiber cement siding holds paint and resists moisture far better than standard wood in salt-laden air; stucco over block reads as native to Tamiami but cracks and needs patching over time.
  • Kitchen and bath package. A compact galley with stock cabinets keeps the unit under budget; a full kitchen with KraftMaid or Wellborn cabinetry and a walk-in shower raises resale appeal for a rental or in-law suite.
  • HVAC. A ductless mini-split is cheap to install and easy to zone; a ducted system is more comfortable throughout but adds cost and ceiling space.

What a New Detached ADU Costs in Tamiami, FL

The honest starting number for a detached ADU here is $53,100 for a small, simple unit and $153,400 at the top of the typical range, with larger two-bedroom builds landing between $106,200 and $259,600. Five things move you up or down that scale:

  • Size and footprint. A 400-square-foot studio costs a fraction of an 800-square-foot two-bedroom, and every additional square foot carries foundation, roof, and finish cost.
  • Utility runs. Trenching a new sewer lateral, water line, and electrical service from the main house is some of the least glamorous money you’ll spend, but it’s unavoidable on a detached build. A short run to a nearby meter is cheaper than a long trench across the yard.
  • Site conditions. Flat, clear ground is easy; a lot with an old slab, a tree to remove, or grading that needs fill adds cost and time.
  • Material grade. Impact glazing, tile roof, and custom cabinetry push toward the high end. Vinyl windows, shingle roof, and stock cabinets keep it near the low end.
  • Permit scope. If prior owners left an unpermitted Florida room or enclosure on the property, Miami-Dade may require you to legalize or demolish it before your new unit can pass. That’s a real line item, not a surprise we spring later.

A written estimate from us breaks out foundation, framing, roofing, MEP rough-ins, finishes, permit fees, and the impact product approvals, so you can see exactly what’s included. It won’t include furniture, landscaping, or the cost of connecting a separate utility meter if the county requires one, and we flag those up front. The number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Tamiami Homes Specifically Do to This Job

Tamiami is a low-rise, largely Cuban-American pocket of unincorporated Miami-Dade at the edge of the Everglades, and nearly everything built here predates the current wind code. The housing stock is mostly 1970s-90s concrete-block ranch homes with barrel-tile or shingle roofs, along with the Mediterranean-style townhome clusters off the SW 8th Street corridor. That matters for a detached ADU because the lot you’re building on often already has a leftover Florida room or patio enclosure from a prior owner that was never permitted. Before your new unit can pass Miami-Dade inspection, we frequently have to legitimize or demolish that old work, which changes both the schedule and the budget.

The other Tamiami-specific reality is the High Velocity Hurricane Zone. Every opening in the new unit needs a Miami-Dade NOA or Florida Product Approval, and the plans examiner will reject a submittal that’s missing one. The subtropical sun, salt air, and June through November storm season also mean fasteners, soffits, and stucco weather quickly, so we spec corrosion-resistant hardware and impact-rated assemblies from the start. Near-daily summer thunderstorms will cost you a few weather days on the exterior stages, and we build that into the schedule rather than pretending it won’t happen.

Serving Tamiami, FL – Our Local Coverage Area

We serve Tamiami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Tamiami

Get a Free Estimate on Your Tamiami Detached ADU

Building a new detached ADU in Tamiami is a big decision, and it starts with a real number. Call (844) 761-9356 and a live person answers, any hour, any day, to schedule your free on-site estimate and design consult. We’ll walk your lot, check the setbacks, price the permit scope, and hand you a written line-item estimate with no surprises. If your project grows into a full home addition, we handle that too, and homeowners often pair new units with our Home Additions & ADU service or finish the interior with Kitchen Design & Layout in Tamiami and Backsplash, Tile & Flooring in Tamiami. Our technicians have up to 12 years of experience, and every job is backed by the 730-Day Done Right Promise. See the wider scope on our Home Additions & ADU in Tamiami page, or check our Tamiami service area.

Written by the team at Groundwork Construction Co.

Why Tamiami Chooses Groundwork Construction Co. of The Hammocks

We set the standard for new detached ADU in Tamiami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tamiami

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tamiami Customers Say

Trusted by homeowners across Tamiami and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for New Detached ADU in Tamiami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Tamiami.

(844) 761-9356

Request a Free Estimate in Tamiami

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch