What a New Detached ADU in Kendall, FL Actually Involves
A new detached ADU in Kendall, FL is a self-contained second dwelling built as a separate structure on your lot, and it runs roughly $45,000 to $130,000 depending on size, utilities and finish level. Expect six to ten months from contract to final inspection on most Kendall lots, with plan review and Miami-Dade permitting eating the first two to three months before anyone frames a wall. Call (844) 761-9356 to start a free on-site estimate.
From an empty patch of yard to a certificate of occupancy: how we build a New Detached ADU
Detached means detached. There is no tie-in to your existing roofline, no sharing a wall, no structural surgery on your main house. What there is, instead, is a full small house in your backyard, and it moves through the same sequence any house does. Here is what actually happens, stage by stage, and what you’ll be deciding along the way.
Stage 1: Feasibility and lot check (2-3 weeks)
Before a single line gets drawn, we pull your lot survey and check setbacks, easements, flood zone and lot coverage against Miami-Dade County rules. Most of the work here is figuring out where the structure can legally sit and how the sewer or septic connection reaches it without crossing a pool line or a mature oak. You decide the footprint and rough size at this stage, usually somewhere between 500 and 900 square feet. This is also when we settle whether the ADU is for a family member, a rental, or a home office with a bathroom, because that decision drives everything downstream.
Stage 2: Design and permitting (8-12 weeks)
Plans go to Miami-Dade County for review, and this is the stage that separates a smooth project from a miserable one. Because Kendall sits inside the High Velocity Hurricane Zone, every window, door and roof assembly needs a product approval or NOA on file, and the structural drawings must show the wind-load path. We handle the submittals, respond to plan-review comments, and pull the building, electrical, plumbing and mechanical permits. Your decisions here: roof style, window product, and whether you want impact glazing throughout. Skipping impact glass to save money is a decision a lot of homeowners make and later regret.
Stage 3: Site prep, foundation and underground (3-4 weeks)
Clearing the footprint, grading, and pouring a monolithic slab or stem-wall foundation comes first, along with trenching the sewer lateral, water line and electrical conduit out to the structure. In Kendall we frequently hit old irrigation lines and undocumented pool plumbing, so a utility locate plus a slow, careful dig is standard. Inspections on the underground plumbing and slab happen before any concrete cures over them. You don’t decide much at this stage. You mostly stay out of the way and let the inspection calendar run.
Stage 4: Shell, roof and rough-in (8-10 weeks)
Block walls up, trusses set, roof dried in, then rough electrical, plumbing and HVAC run through the walls before insulation and drywall. Shell construction in South Florida means tie-beams, a strapped roof, and a stucco exterior that will get a coat of paint with real elastomeric body to it. This is where the framing inspection and the rough-in inspections stack up, and where a missed inspection slot can cost you a week. We schedule them ahead so the trades aren’t idle.
Stage 5: Finishes, final inspection and handover (5-7 weeks)
Drywall, cabinets, flooring, paint, trim, and the final mechanical, electrical and plumbing inspections leading to a certificate of occupancy. You’ll pick kitchen finishes, flooring and fixtures back in Stage 2, but they show up here, so there’s a reason we lock them early. Once you have the CO, the ADU is a legal, insurable, rentable space. Our 730-Day Done Right Promise covers the workmanship from there, and it’s written, not implied.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The decisions that actually change the number
A detached ADU is a small house, so the choices that matter are the same ones that matter in a full build. Here’s what you’ll weigh, with the honest trade-off of each:
- Size and layout. A 500-square-foot studio keeps costs down and gets you a legal rental or in-law space. Push past 800 feet with two bedrooms and a full kitchen and you’re at the top of the range. Smaller is cheaper and faster, but a studio rents for less.
- Impact glazing versus standard windows. Miami-Dade impact windows and doors add real money but eliminate shutters forever and satisfy HVHZ compliance cleanly. Standard windows with panels cost less up front and mean you’re installing shutters every June.
- Roof: shingle versus standing-seam metal. Shingle is cheaper and replaceable; metal lasts longer in salt air and reflects heat. In Kendall’s climate, both work, but metal wins on lifespan and heat load.
- Finishes. A KraftMaid or Wellborn cabinet package and mid-grade flooring give you a rentable, durable space. Builder-grade cabinets everywhere look fine on day one and then fall apart in five years of humidity.
- Exterior cladding. Stucco over CBS block is the regional standard and cheap to maintain. Fiber-cement siding like James Hardie is an option in some designs, but does require paint and attention in coastal conditions.
- Kitchenette versus full kitchen. A full kitchen with a range and vent hood is a bigger permit package and costs more, but a true full kitchen is what makes an ADU genuinely independent.
What a New Detached ADU costs in Kendall, FL
In Kendall, a new detached ADU runs $45,000 to $130,000, with most projects landing between $70,000 and $110,000 for a 600-800 square foot unit. That’s a broad spread, so here’s what actually moves you from one end to the other:
- Footprint and bedroom count. Going from a 500-foot studio to an 800-foot two-bedroom is the single biggest driver. Square footage means concrete, framing, roofing and HVAC capacity, and those costs stack.
- Utility runs. Distance from the main house and the existing electric panel, plus the condition of your sewer lateral, can add meaningful cost if the run is long or the panel needs an upgrade.
- Site conditions. Mature trees, old irrigation, pool equipment, or a soft spot in the soil can all require extra prep and grading work.
- Material grade. Impact glass throughout, a metal roof and upgraded cabinetry push the number up, while standard windows and builder-grade finishes pull it down.
- Permit scope. A detached ADU requires multiple trade permits and multiple inspections. If the county requires a plan revision midstream, the schedule and cost both move.
Every estimate we write is itemized: foundation, framing, roofing, electrical, plumbing, finishes, permits, and inspection fees all broken out. What usually isn’t included unless the project calls for it: landscaping and irrigation restoration, pool fence adjustments, and furniture or appliances beyond the standard package. We tell you what’s in and what’s not before you sign. No-hassle upfront pricing means the number you see is the number you pay. And with $1,000 off projects over $10,000 and 0% financing for 18 months, the upfront number is easier to plan around. This is where a brand like Tuff Shed comes up if you’re considering a pre-built shell, though a true detached ADU with full utilities and a kitchen is a site-built job, not a shed.
See the difference
Before
After
Before
After
Before
AfterWhat Kendall homes specifically do to this New Detached ADU project
Kendall is unincorporated Miami-Dade, west of the Turnpike, built out tight by the 1980s and 1990s. Almost every lot here is already improved, which means your ADU goes on a lot that already has a house, a driveway, usually a pool, and mature landscaping. That makes setbacks and lot coverage the first real constraint, and you feel it most in the dense tract neighborhoods off Kendall Drive and around 127th Avenue. Your lot likely has an easement that cuts into where you can build, and the survey tells you before design begins. The 1970s-to-1990s CBS (concrete block and stucco) housing stock also means the root systems of old oaks and ficus can run under your proposed slab. Salt-laden coastal air pushes roof and paint replacement cycles here harder than inland, so choose a metal or high-grade shingle roof and elastomeric exterior paint to stretch the interval. And because Kendall is inside the HVHZ, every opening and roof assembly needs a Miami-Dade product approval. Hurricane season and the afternoon downpours here make windborne debris protection and roof-to-wall strapping non-negotiable, not optional. The paperwork question comes before the price question in Kendall, and we pull the county permits and manage the inspections as part of the bid.
Serving Kendall, FL – Our Local Coverage Area
We serve Kendall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – New Detached ADU in Kendall
Six to ten months from contract to certificate of occupancy is realistic, with design and permitting eating the first two to three months and construction taking the rest. The permit timeline is the wild card, so we build in buffer at the front end. Call (844) 761-9356 for an estimate that maps your actual timeline.
Yes. A detached ADU in unincorporated Miami-Dade requires building, electrical, plumbing and mechanical permits, plus plan review and a certificate of occupancy before it’s legal to occupy or rent. We pull the permits and manage the inspections. Call (844) 761-9356 to understand what your lot requires.
Yes, and that’s the entire point of detached. The ADU has its own foundation, walls, roof and systems. The only connection is a utility trench from your main house to the new structure, and possibly a service upgrade to your existing panel. Call (844) 761-9356 to walk your lot and check the utility run.
No. We write a fixed, itemized quote that covers foundation through final inspection, so the number you agree to is the number you pay unless you change the scope. That’s the whole idea behind no-hassle upfront pricing. Call (844) 761-9356 for a written estimate and a chance to see the breakdown.
Every ADU we build is covered by our 730-Day Done Right Promise, which means if the workmanship isn’t right, we make it right for two full years. It’s written into the contract and it’s one of the longest workmanship guarantees in residential construction. Call (844) 761-9356 for the full details before you sign anything.
Ready to price your New Detached ADU in Kendall?
Call (844) 761-9356 for a free on-site estimate on a new detached ADU in Kendall. We’ll walk the lot, check setbacks and utility runs, and come back with an itemized written quote covering foundation through final inspection. Part of a bigger plan? Our Home Additions & ADU in Kendall page covers the wider scope, and homeowners often pair this with Backsplash, Tile & Flooring in Kendall once the ADU interior is finishing. Groundwork Construction Co. covers Kendall and the surrounding area, and our Home Additions & ADU service runs from foundation to finish line. Considering updates to your main house while the ADU goes up? See Kitchen Design & Layout in Kendall. Calls are answered by a live person, 24/7, and estimates are free.
Written by the team at Groundwork Construction Co.