Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Three Lakes, FL: What It Takes and What It Costs
A full kitchen remodeling in Three Lakes, FL runs $14,000 to $45,000 and takes 6 to 10 weeks from demo to final walkthrough on most homes. The number lands at the low end when you keep the existing layout and plumbing; it climbs toward the high end when walls move, wiring is brought up to code, or you step into premium cabinetry and stone. Call (844) 761-9356 and we’ll walk your kitchen and give you a written, line-item range before you commit to anything.
How a Full Kitchen Remodeling Project Actually Runs, Stage by Stage
Nobody hands you a kitchen in one delivery. It’s a sequence, and knowing the sequence is how you plan your life around it. Here’s how we run a full kitchen remodeling job in Three Lakes.
Stage 1: Design and selections (weeks 1 – 2)
We measure the room, confirm what’s staying and what’s moving, and set the scope in writing. You’ll make your big decisions here: cabinet line (KraftMaid and Wellborn are both on our list), countertop material, appliance package, and layout changes. Locking selections now is what keeps the job from stalling later, because cabinet lead times drive the whole schedule.
Stage 2: Permits and demo (days 1 – 4)
Permits get pulled before demo starts. On day one we protect floors and adjacent rooms, shut off utilities, and tear out cabinets, countertops, and flooring. If a wall is coming down, it comes down here, and if it turns out to be load-bearing we stop and price the beam before anything else moves.
Stage 3: Rough-in and inspection (days 5 – 12)
Plumbing, electrical, and any structural work happen now. This is where Miami-Dade’s inspectors come through before the walls close up. If your home still has aging aluminum wiring or a cast-iron drain under the slab, this is the moment to address it, not after tile goes down. You’ll approve any change order in writing before we proceed.
Stage 4: Drywall, cabinets, and surfaces (days 13 – 40)
Insulation, drywall, and paint go in, then cabinets get set and leveled, the countertop template is taken (stone fabrication typically adds 7 to 14 days), and flooring, backsplash, and lighting finish out. You’ll do a mid-project walkthrough here to sign off on cabinet placement and hardware before surfaces lock in.
Stage 5: Final install and punch list (days 41 – 50)
Appliances get set, plumbing trim and outlet covers go on, and we do a final inspection with you. You get a written punch list, and anything on it gets handled before we call the job done. Our 730-Day Done Right Promise backs the workmanship from there.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Decide What Your Kitchen Becomes
Most of the real decisions happen in stage 1, and they’re where budgets quietly move. Here’s the honest trade-off on each.
- Cabinet grade: Stock cabinets save money and time but limit sizes; semi-custom (KraftMaid, Wellborn) fits odd walls and lasts decades. The gap is often $3,000 to $8,000 and worth it in a 1980s home with non-standard dimensions.
- Countertop material: Laminate is the budget pick and wears fast in a busy kitchen. Quartz and granite run more but hold up to heat and daily use, and they suit the Mediterranean finishes common in Three Lakes homes.
- Layout changes: Keeping the sink and range where they are saves on plumbing and venting. Moving them is a real dollar jump, so we price it separately so you can see exactly what it buys.
- Flooring: Porcelain tile handles Florida humidity and spills without complaint; luxury vinyl is warmer underfoot and cheaper; hardwood is beautiful but requires care in a wet kitchen.
- Lighting and electrical: Recessed cans, under-cabinet strips, and dedicated appliance circuits are worth planning up front. Adding them later means opening finished walls.
What Full Kitchen Remodeling Costs in Three Lakes, FL
Plan on $14,000 to $45,000 for a full kitchen remodeling in Three Lakes, with most jobs landing in the middle of that range. The line items below are our real working numbers.
| Item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island | $3,000 – $10,000 |
| Full kitchen remodel (combined) | $14,000 – $45,000 |
| Small / partial kitchen remodel | $9,000 – $20,000 |
Five things push a Three Lakes kitchen toward the top of the range: the size of the room, the condition we find behind the walls, whether plumbing or electrical gets relocated, the grade of cabinet and stone you choose, and how much permit and inspection work the scope triggers. Relocating a sink or range means new drain lines and venting, which is one of the biggest single line items. A written estimate from us spells out exactly what’s included, from demo to final cleanup, and what isn’t, like appliance purchases or structural changes discovered mid-job. You approve every change in writing before we move. Call (844) 761-9356 for an exact quote; estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Three Lakes Homes Specifically Do to This Job
Three Lakes is a built-out 1980s – 90s pocket of western Kendall, ZIP 33186, where nearly every kitchen project is a remodel inside an aging Mediterranean-style concrete-block home, not new construction. That changes the work. These homes hit the age where aluminum wiring and cast-iron drain lines surface the moment demo opens a wall, so we plan for the possibility and price it honestly rather than surprising you. Remodeling here also means permitting through Miami-Dade County, where the High-Velocity Hurricane Zone code governs structural and impact work and requires strict product approvals on every permit. On townhome and villa lots in the low-rise communities around Three Lakes, HOA rules on dumpster placement, work hours, and exterior changes shape how we stage the job, and tight lots mean deliveries and debris hauling get scheduled, not improvised. Kitchen remodeling done here isn’t just cosmetic; it’s bringing a 30-plus-year-old room up to current code while you live in the house. We handle this as part of our wider kitchen remodeling service, and you can see the broader scope on our Kitchen Remodeling in Three Lakes page.
Serving Three Lakes, FL – Our Local Coverage Area
We serve Three Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Kitchen Remodeling in Three Lakes
Most full kitchen remodeling projects in Three Lakes take 6 to 10 weeks from demo to final walkthrough. Cabinet lead times and countertop fabrication drive most of the schedule, so locking selections early keeps the timeline tight. Call (844) 761-9356 and we’ll give you a schedule based on your actual scope.
Yes, most full kitchen remodeling in Three Lakes requires permits, and Miami-Dade County inspects the work before walls close. Any plumbing, electrical, or structural change triggers a permit, and HVHZ product approvals apply to specified materials. We pull the permits and coordinate inspections for you; it’s part of the written scope.
Yes, and keeping the layout is the single best way to control cost. Leaving the sink, range, and walls in place avoids new drain lines, venting, and structural work, which can save thousands. We’ll tell you honestly whether a layout change is worth the money or not.
Full kitchen remodeling in Three Lakes typically runs $14,000 to $45,000 depending on size, materials, and how much plumbing or electrical moves. Small or partial remodels land lower, around $9,000 to $20,000. Call (844) 761-9356 for a free written estimate, and we’ll itemize every line.
Every full kitchen remodeling project we complete is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That covers our workmanship for two full years, backed in writing. Call (844) 761-9356 to go over exactly what the guarantee covers.
Get a Free Estimate for Full Kitchen Remodeling in Three Lakes
If you’re weighing a full kitchen remodeling in Three Lakes, the best next step is a free on-site estimate. Call (844) 761-9356 and a live person answers, any hour. We’ll measure the kitchen, talk through your layout and material options, and hand you a written, itemized range with no surprises. Our technicians bring up to 12 years of experience, and you’ll get upfront pricing, our 730-Day Done Right Promise, and a job scheduled around your life. Homeowners often pair the work with Full Bathroom Remodeling in Three Lakes or a Walk-In Showers & Shower Remodeling in Three Lakes project while crews are already on site. We cover Three Lakes and the surrounding Kendall neighborhoods.
Written by the team at Groundwork Construction Co.