Garage Conversion ADU in The Crossings, FL: What It Costs and How Long It Takes
A garage conversion ADU in The Crossings typically runs $45,000 – $130,000 and takes 8 – 14 weeks from permit approval to final inspection. The work turns an attached garage into a permitted, separately-accessed living space: framing and insulation upgrades, a raised and finished floor, new electrical panel capacity, HVAC extension or a mini-split, a full bath, and a code-compliant separation between the unit and the main house. Call (844) 761-9356 to schedule a free on-site estimate and a written line-item scope before you commit to anything.
How We Run a Garage Conversion ADU, Stage by Stage
Every conversion we do in The Crossings follows the same sequence. The stages don’t move around, because each one depends on an inspection from the prior stage. Here’s what actually happens and when you have to make a decision.
Stage 1: Assessment and drawing set (weeks 1 – 3)
We start in the garage with a laser level, a moisture meter, and a look at the existing slab, the door header, and the panel. You’ll get a written scope with line-item pricing, not a lump sum. At this point you decide the unit’s layout: studio versus one-bedroom, where the kitchenette lands, and whether the entry comes from the main house, a new side door, or both. The drawing set and the HOA architectural submittal go out together, since one can stall the other.
Stage 2: Permitting (weeks 3 – 7, runs parallel with nothing)
Miami-Dade County and the City of Miami review the plans, and your HOA architectural review committee approves the exterior changes separately. We pull the permits and handle both rounds of comments. Nothing gets demoed before the permit card is issued; doing it the other way is how homeowners end up tearing out finished work. This is the longest wait in the job, and it’s the stage where a sloppy drawing set costs you weeks.
Stage 3: Demo and rough-in (weeks 7 – 9)
The garage door comes off and the opening gets framed and closed with a wall assembly that matches the house. Floor gets raised to clear the slab, plumbing is trenched for the bath and kitchenette, and electrical is run from a new subpanel. You’ll decide fixture locations and outlet counts during this window, and you’ll want to have the bath fixture spec locked before the rough-in inspection. The rough-in inspection happens before any drywall goes up.
Stage 4: Insulation, drywall, and finishes (weeks 9 – 12)
Closed-cell spray foam on the underside of the roof deck and the exterior walls, then drywall, then tape and texture. This is where material choices show up in the budget. Tile, flooring, cabinet grade, and door style get installed in this stage, along with the HVAC, the water heater if the unit gets its own, and the bathroom finishes.
Stage 5: Final inspections and handoff (weeks 12 – 14)
Electrical, plumbing, mechanical, and building final inspections, plus the certificate of occupancy. We walk the unit with you, demonstrate the systems, and hand over the warranty paperwork. The 730-Day Done Right Promise covers workmanship from that day, and if something isn’t right we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
The layout is the first decision and the one that costs the most to change later. After that, it’s materials. Here’s what actually moves the look and the number:
- Slab-on-grade versus raised floor: A raised subfloor over the existing slab costs roughly $4,000 – $9,000 more but gives you room for plumbing and keeps the floor above any slab moisture. Keeping the original slab and cutting trenches is cheaper but limits fixture placement.
- Full bath versus half bath: A three-quarter bath with a walk-in shower adds real rental value, but it pushes the plumbing scope. A half bath saves $6,000 – $12,000 and suits a guest suite or home office with occasional overnight use.
- Kitchenette grade: A simple sink, mini-fridge, and microwave niche versus a full KraftMaid or Wellborn cabinet run with a cooktop. The cabinet line itself swings $4,000 – $13,000 depending on box construction and door style.
- HVAC approach: Extending the main house system is cheapest up front but stresses the existing unit. A dedicated mini-split costs $3,500 – $7,000 installed and gives the tenant independent control, which most homeowners in The Crossings choose.
- Exterior cladding: Where the old garage opening gets closed, the patch has to match the original stucco. James Hardie panel or a stucco-to-match finish both work; stucco-to-match reads invisible and is what we recommend on CBS homes.
- Impact-rated glazing: Any new windows or doors in the unit need Miami-Dade product approval. Budget for it now rather than retrofitting later.
Homeowners often pair the conversion with Cabinets & Countertops in The Crossings for the kitchenette and Backsplash, Tile & Flooring in The Crossings for the bath and main floor, since those trades are already on site during Stage 4.
What a Garage Conversion ADU Costs in The Crossings, FL
Plan on $45,000 – $130,000 for a permitted garage conversion ADU in The Crossings. The low end is a studio with a half bath, a mini-split, and builder-grade finishes on the original slab. The high end is a one-bedroom with a full bath, a kitchenette with custom cabinetry, impact glazing throughout, and a raised floor with relocated plumbing.
Five variables push the number:
- Size and layout: A one-car garage conversion lands around 250 – 300 square feet; a two-car conversion can reach 400 – 500. Every 100 square feet adds roughly $12,000 – $18,000 in finished space.
- Plumbing distance: The farther the new bath sits from the main stack, the more trenching and venting. Moving the bath to the far corner of a two-car garage can add $5,000 – $9,000.
- Electrical capacity: An older 150-amp panel may need an upgrade to carry the subpanel and the new HVAC. Panel work adds $2,500 – $6,000 and it’s non-negotiable for a permitted unit.
- Finish grade: Tile versus LVP, custom versus stock cabinets, and framed versus frameless shower glass swing the finishes line by $10,000 – $25,000.
- Permit and HOA scope: A conversion with exterior changes (new entry door, new window, exterior patch) goes through more review than an interior-only change, and the drawing set is bigger.
A written estimate from us lists the demo, framing, rough-in trades, insulation, drywall, finishes, fixtures, permits, and inspections as separate lines, so you can see exactly what’s included. What typically isn’t included: furniture, appliances beyond the spec’d package, landscaping repair around the new entry, and any HOA fees. Upfront pricing means the number you see is the number you pay unless you change the scope.
See the difference
Before
After
Before
After
Before
AfterWhat The Crossings Homes Specifically Do to This Job
The Crossings is a master-planned Kendall subdivision built in the late 1980s through the 1990s, almost all of it inside ZIP 33186. That matters here because nearly every garage we convert is in a CBS stucco home with an original attached two-car garage, so we’re renovating like-for-like inside a built-out tract, not adapting new construction. The permitting runs through Miami-Dade County and the City of Miami, and on top of that every job sits inside an HOA-governed tract where exterior changes need architectural review. That combination of county permit plus HOA review is the reality of working in The Crossings, and it’s different from the unincorporated pockets around us.
The housing stock is also hitting 30-plus years. We regularly see original single-pane windows and aging garage doors, and the conversion is a natural moment to address both. Subtropical heat, summer humidity, and hurricane exposure drive the spec: closed-cell insulation against the roof deck, continuous moisture detailing at the slab and wall junctions, and impact-rated glazing on any new opening. Exterior work gets scheduled around the June – November storm window, which is why we push the closing-wall and stucco patch into the earliest possible slot after permit issuance.
This is one piece of a larger project scope for a lot of homeowners; if you’re planning the conversion as part of a Home Additions & ADU in The Crossings plan, we scope both together so the drawings and the HOA submittal line up. You can see the wider service at our Home Additions & ADU hub, and we cover the full The Crossings service area, plus nearby Three Lakes, Country Walk, The Hammocks, and Kendale Lakes.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in The Crossings
Expect 8 – 14 weeks of construction after permit approval, plus 4 – 6 weeks for county and HOA review before that. The build itself is faster than the permitting, and the two don’t overlap because we don’t demo before the permit card is issued. Call (844) 761-9356 for a realistic timeline on your specific garage.
Yes. A garage conversion ADU requires a Miami-Dade County building permit and, because The Crossings is HOA-governed, architectural review committee approval for any exterior change. Converting a garage without permits creates a disclosure problem at resale and can void insurance. We pull the permits and handle the inspections.
Sometimes. A studio with a half bath placed near the existing main stack can avoid major plumbing work, and many single-story CBS garages don’t need structural changes beyond the door opening. A full bath with a shower usually requires trenching the slab or a raised floor. We determine which path fits during the site assessment.
Most conversions here land between $45,000 and $130,000, depending on size, bath configuration, HVAC approach, and finish grade. The kitchenette cabinets and the bath scope are the two biggest swing factors. Call (844) 761-9356 for an exact quote; the estimate is free and comes with a written line-item scope.
Every conversion we build is covered by the 730-Day Done Right Promise: if the workmanship isn’t right, we come back and make it right. That covers the trades we install, from framing through finishes. You’ll get the warranty documentation at handoff, along with the inspection records.
Get a Free Estimate on Your Garage Conversion ADU in The Crossings
Call (844) 761-9356 to schedule a free on-site estimate for your garage conversion ADU in The Crossings. We’ll walk the garage, check the panel and slab, talk through the layout you have in mind, and follow up with a written line-item scope and a realistic timeline. No pressure, no vague bids, and a live person answers the phone around the clock.
Written by the team at Groundwork Construction Co.