Walk-In Showers & Shower Remodeling in The Crossings, FL: What It Costs and How Long It Takes
Walk-In Showers & Shower Remodeling in The Crossings runs $4,500 – $12,000 for a new walk-in shower and $9,000 – $28,000 when the shower work sits inside a fuller bathroom renovation. Most single-shower projects here finish in 5 to 10 working days once the permit is in hand, and Miami-Dade permitting alone can add 2 to 4 weeks before demolition starts. Call (844) 761-9356 for a free on-site estimate, and we’ll walk your shower and give you a written number.
How Our Walk-In Showers & Shower Remodeling Process Works, Stage by Stage
Shower work is small in square footage and unforgiving in sequence. Skip a step and you find out a year later through a soft spot in the drywall behind the bedroom closet. Here’s the order we actually run it in.
Stage 1: Measure, moisture test, and scope (day 0, about 90 minutes)
Before anything is quoted, we pull the shower valve trim, check what’s behind the existing wall, and probe the backer for soft spots. In The Crossings homes, the original stall showers from the late 1980s and 1990s are often set on drywall with a thin moisture barrier, or worse, mastic over greenboard. If the substrate is sound we can tile over it with a bonded waterproof membrane. If it crumbles under a screwdriver, it comes out. You decide at this visit whether we’re doing a shower-only replacement or folding it into a Bathroom Remodeling in The Crossings scope, and that decision changes the whole budget.
Stage 2: Permit and selections (week 1 to week 4)
We pull the plumbing permit through Miami-Dade County, and because every property in this community sits inside an HOA tract, we also submit the architectural review packet if the project touches anything outward-facing. While the county reviews, you pick tile, drain style, valve brand, and glass. This is the longest stretch of the job and the one homeowners underestimate. Get your tile picked in week one, not week three, or you’ll be waiting on a backordered slab with a finished rough-in behind it.
Stage 3: Demo and rough-in (days 1 and 2)
Day one is tear-out: old tile, old pan, old valve. We protect the floor path, plastic off the doorway, and cart debris out the same day. Day two is plumbing rough-in. If the shower valve stays in the same wall cavity, this is a few hours. If you’re moving the drain to shift the entry point or relocating the valve, add a day and expect a county inspection before anything gets closed up. Nothing is covered until the inspector signs off.
Stage 4: Waterproofing and tile (days 3 through 7)
This is the stage that decides whether the shower lasts 15 years or 5. We build a sloped pan, install a bonded waterproof membrane with banded seams and corners, flood-test it, and then set tile. Curbless designs take an extra half day because the floor has to slope in four directions around a linear drain. Grout and cure time add another day before the glass template gets measured.
Stage 5: Glass, trim, final inspection (days 8 through 10)
Tempered glass is cut to the actual opening, not to the drawing, so there’s a 5 to 7 day fabrication window with most fabricators in the 33186 area. We set the enclosure, install the valve trim and showerhead, seal the joints, and walk the county inspector through it. Final walkthrough is with you, and that’s when the 730-Day Done Right Promise gets explained in plain terms: if a leak or a loose tile shows up, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for a Walk-In Shower in The Crossings
Most of the anxiety on this job comes from a tile showroom with 4,000 samples and no clear trade-offs. Here’s the honest version of what you’re picking between.
- Tile over a waterproof membrane vs. a solid-surface panel system. Tile gives you design freedom and holds resale value in The Crossings’ Mediterranean-style homes, but it needs grout maintenance and a properly sloped pan. A panel system like a factory-made acrylic or solid-surface surround goes in faster and cleans easier, but reads more builder-grade and limits your color choices.
- Curbless vs. a low curb. Curbless is the aging-in-place choice and looks cleaner. It costs more because the floor framing often has to be recessed or built up, and the waterproofing detail is fussier. A 4-inch curb is simpler, cheaper by roughly $800 to $1,500, and still easy to step over.
- Frameless glass vs. framed. Frameless with 3/8-inch tempered glass is the look most people want, and Mr-Glass and ViewLux both fabricate to local measurements. Framed enclosures cost less and hide imperfect wall alignment, which matters in 30-year-old CBS homes where walls are rarely plumb.
- Linear drain vs. center drain. A linear drain lets you use large-format tile without cutting it into a dozen little pieces around the drain, and it looks sharper. It adds a few hundred dollars and requires the floor to slope one direction only.
- Niche and bench add-ons. A recessed niche runs a couple hundred installed and is worth every dollar. A built-in bench or a corner seat adds $600 to $1,500 depending on whether it’s framed or tiled block.
What Walk-In Showers & Shower Remodeling Costs in The Crossings, FL
A walk-in shower installation in The Crossings typically lands between $4,500 and $12,000, and the same work folded into a full bathroom renovation falls in the $9,000 to $28,000 band. Straight replacement of an existing shower with the same footprint is the cheapest version, generally $3,000 to $8,500. Below is how the line items break out on a written estimate.
| Line item | Typical range |
|---|---|
| Walk-in shower installation (new footprint) | $4,500 – $12,000 |
| Shower replacement, same footprint | $3,000 – $8,500 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Frameless glass enclosure | $1,200 – $3,500 |
| Full bathroom remodel with new shower | $9,000 – $28,000 |
Five things push a job to the high end. First, footprint changes: moving a drain or relocating a valve into a new wall means cutting concrete slab and re-inspecting. Second, existing condition: hidden rot or a failed pan turns a $4,500 shower into an $8,000 one once the framing comes out. Third, material grade: porcelain over a membrane is one number, large-format marble-look slab or book-matched stone is another, and cut labor climbs fast with tile size. Fourth, glass: frameless tempered with a custom angle costs more than framed, and a 90-degree return adds a panel. Fifth, permit scope: a shower-only permit is one review cycle, while a full bathroom remodel with electrical and plumbing changes pulls multiple trades through the county.
A written estimate from us includes demo, haul-away, rough plumbing, waterproofing, tile labor, grout and sealant, valve and showerhead installation, and the final inspection. It typically does not include the glass enclosure if you buy it separately, specialty stone fabrication, or structural repairs discovered after demo. We don’t do change-order surprises on those: if we find rot, we photograph it, price it, and you decide before we continue.
See the difference
Before
After
Before
After
Before
AfterWhat The Crossings Homes Specifically Do to This Job
The Crossings is a master-planned Kendall subdivision built almost entirely in the late 1980s and 1990s, all inside ZIP 33186, and that single fact shapes nearly every shower we touch here. These are CBS homes with stucco walls and original Mediterranean tile roofs, so the work is like-for-like renovation of a 30-plus-year-old build, not new construction. The original shower pans from that era are the failure point: many were set with a rubber liner over a pre-sloped bed that has since settled, and the tile has started to hollow. We find soft drywall behind the valve wall on a good share of the showers we open. Any project that touches plumbing or electrical runs through Miami-Dade County and City of Miami permitting, and because every lot in The Crossings sits inside an HOA-governed tract, exterior-facing changes need architectural review on top of the county permit. Plan for that extra review cycle. The subtropical heat and summer rain also matter inside: continuous moisture detailing and proper exhaust venting are what keep a shower from growing mold behind the tile, and we size the vent fan to the room, not to whatever was in the box in 1994.
Homes in The Crossings are also aging into the resale and inspection window where a dated shower shows up on a buyer’s report next to the original single-pane windows. Homeowners often pair a shower update with Roof Replacement & Installation in The Crossings or Metal Roofing in The Crossings when they’re planning a package of upgrades before a sale or an insurance review. If you’re weighing the shower against the rest of the house, our broader Bathroom Remodeling service covers the full scope, and you can see everything we do across The Crossings on our service-area page.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Walk-In Showers & Shower Remodeling in The Crossings
Plan on 5 to 10 working days of on-site work, plus 2 to 4 weeks for the Miami-Dade County permit to clear before demolition begins. Glass fabrication adds another 5 to 7 days after tile is set. Call (844) 761-9356 and we’ll give you a schedule based on your actual shower, not a generic range.
Yes, if the project touches plumbing, electrical, or the shower pan, which almost every walk-in shower does. Miami-Dade County requires a plumbing permit for valve and drain work, and the HOA architectural review often runs in parallel for anything visible from outside. We pull the permits and pass the inspections; that’s part of the written scope.
Yes, and that’s the most common job we do in The Crossings. Keeping the drain and valve in the same location lets us replace the pan, membrane, and tile in a single-footprint shower and keeps the job in the $3,000 to $8,500 range. Moving the drain to a curbless design or shifting the entry point adds concrete cutting and a second inspection.
A walk-in shower installation runs $4,500 to $12,000, and a straight shower replacement in the same footprint is $3,000 to $8,500. Tile grade, glass type, drain style, and any hidden rot behind the wall are the variables. Call (844) 761-9356 for a written line-item estimate; the consultation is free.
Every shower we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If a leak, a loose tile, or a waterproofing failure shows up within that window, we come back and make it right. No fine print, no arguing about whether it’s covered.
Get a Free Walk-In Shower Estimate in The Crossings
If your shower is original to the house or you’re planning a walk-in conversion, call (844) 761-9356 to schedule a free on-site estimate in The Crossings. A live person answers around the clock. We’ll measure the shower, test the substrate, explain what’s behind the wall, and hand you a written line-item quote with no-hassle upfront pricing, plus the option of 0% financing for 18 months and $1,000 off projects over $10,000.