Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in West Perrine, FL: What It Involves and What It Costs
A tub-to-shower conversion in West Perrine, FL typically runs $3,500 to $10,000 and takes three to seven working days once the permit clears. We remove the old tub, rebuild the wet area with a waterproofed shower pan and new tile or a solid-surface surround, and reset the valve and drain. Most West Perrine homes fall in the $4,500 – $7,000 range. Call (844) 761-9356 for a free on-site estimate.
How the Job Actually Runs, Day by Day
Here’s the sequence we follow on a conversion, so you know what to expect and when you have to make a decision.
- Day 1: demolition and discovery. We pull the tub, cut back the surround, and open the wall around the valve. This is where we find out what’s underneath – old galvanized drain lines, a cracked pan liner, or a wall cavity with no waterproofing membrane at all. You see what we see before we build anything back.
- Day 2: rough-in and inspection. New drain and valve are set, blocking for grab bars goes in, and framing is corrected if the tub alcove wasn’t square. If the job needs a plumbing permit and inspection, this is when it happens, so the schedule depends on the county inspector’s window. You decide the shower valve finish and trim now, before the wall closes.
- Day 3 – 4: waterproofing and tile. We install cement board, a liquid or sheet membrane, and set tile or a solid-surface wall panel. Tile has to cure before grout, which is why a fully tiled shower takes a day longer than a panel system.
- Day 5 – 6: pan, glass, and trim. Shower pan is finished, the door or curtain rod is hung, and the valve trim, drain cover, and any niches are set. Final inspection happens here if the permit requires one.
- Day 7: punch and walkthrough. We clean up, run the shower to check drainage and grading, and walk you through the finished job. Our 730-Day Done Right Promise covers the work from that point forward – if something’s off, we come back and make it right.
For a small bathroom that’s part of a full Bathroom Remodeling in West Perrine project, the conversion slips into the larger schedule rather than running standalone. On its own, the timeline above holds for most West Perrine homes.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Four decisions drive the finished look and the final number. We walk through each at the estimate.
- Wall finish: tile vs. solid-surface surround. Full tile costs $1,200 – $3,500 in material and labor on a typical alcove, looks custom, and lasts decades if the waterproofing is done right. A solid-surface or acrylic panel system runs $600 – $1,800 installed, goes in faster, and cleans easily, but it ages faster and looks factory-made.
- Pan: pre-formed vs. tiled. A pre-formed acrylic or composite pan runs $400 – $900 installed and is reliable. A mud-set tiled pan costs $1,000 – $2,200 and lets the floor match the walls, but it depends entirely on the installer’s waterproofing discipline.
- Valve and trim: existing vs. new. Reusing the existing valve saves $300 – $800. Replacing it with a new pressure-balance unit from Moen or Kohler runs $400 – $900 and is worth it if the old valve is more than 15 years old – it’s the one thing behind the wall that’s expensive to change later.
- Configuration: alcove, walk-in, or curbless. An alcove shower (keeping the existing tub footprint) is the simplest and cheapest. A curbless walk-in costs $1,000 – $2,500 more because the floor has to be recessed or built up and the drain relocated.
Glass: a framed door runs $500 – $1,200; a frameless enclosure runs $1,200 – $2,800. Most West Perrine homeowners pair a tiled shower with a framed door and upgrade later if they choose.
What Tub-to-Shower Conversion Costs in West Perrine, FL
The full range for this job in West Perrine is $3,500 to $10,000, with most homes landing between $4,500 and $7,000. Where a job lands depends on five things:
- Size of the old tub alcove. A standard 30-inch alcove is the low end. A 60-inch garden tub that has to be widened or reconfigured adds $800 – $1,800.
- Existing condition. Galvanized drain lines, rotted subfloor, or a wall cavity with no waterproofing pushes the job to the high end – sometimes $1,000 – $2,500 in repair work on top of the conversion.
- Plumbing or electrical relocation. If the drain has to move or the valve is being repositioned, add $500 – $1,500 plus permit scope.
- Material grade. Basic ceramic tile and a pre-made pan sit at the low end. Porcelain, natural stone, and a custom mud-set pan sit at the high end.
- Permit scope. A straight swap usually needs a plumbing permit and inspection; a full relayout adds permits and inspection time.
Our written estimate is line-item and fixed: what’s included, what isn’t, and the number doesn’t change after work starts unless you add scope. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat West Perrine Homes Specifically Do to This Job
West Perrine (ZIP 33157) sits at the high point of Miami-Dade’s limestone ridge, just west of the urban development boundary, and the housing stock reflects it. Most of the homes here are 1950s – 1980s concrete-block single-family houses, and many still have the original bathroom plumbing from that era. The problem we see most often isn’t the tile: it’s the drain. Old cast-iron and galvanized drain lines have often corroded to the point where a new shower pan needs a new drain run. We scope that on day 1, before anyone commits to a finish. The other local reality is the block wall itself – it’s dense, and cutting for a relocated valve means chipping, not sawing drywall the way you would in a newer stick-built house. That adds time and hand labor, so we build it into the schedule. West Perrine also sits in the May – October rainy season belt, which means moisture management during a conversion matters: we never leave an open wall cavity through a weekend without a vapor barrier. We cover West Perrine and the surrounding areas, including Palmetto Estates, Kendall, and Richmond Heights – see our West Perrine service page for the full list. Homeowners often pair a conversion with Metal Roofing in West Perrine or Tile Roofing in West Perrine when the whole house is being refreshed. It’s all part of our Bathroom Remodeling scope.
Serving West Perrine, FL – Our Local Coverage Area
We serve West Perrine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in West Perrine
A standard conversion takes three to seven working days once the permit clears, with tile jobs at the longer end because of cure time. Panel systems can finish in three. The wildcard is discovery on day 1 – if the drain or subfloor needs repair, add one to three days. Call (844) 761-9356 for a firm timeline after we see the bathroom.
Yes, if the plumbing valve or drain is being replaced, which covers most conversions. A straight cosmetic swap that reuses the existing valve and drain sometimes doesn’t require one, but Miami-Dade County is strict about anything inside a wet wall. We pull the permits and pass the inspections as part of the job, and we tell you up front which permit applies.
Yes. Keeping the drain and valve in their current positions is the most common and cheapest route, and it’s why the alcove configuration dominates. Moving the drain adds $500 – $1,500. A curbless walk-in adds more because the floor has to be recessed.
The range is $3,500 to $10,000, with most jobs between $4,500 and $7,000. The variables are size, existing condition, material grade, and whether plumbing is moving. Call (844) 761-9356 for an exact quote – estimates are free.
Our 730-Day Done Right Promise covers the conversion for two years from the walkthrough – if it’s not done right, we make it right. That covers waterproofing and installation, not normal wear on a shower door or a valve cartridge. Every technician who shows up is background-checked and in uniform.
Get a Free Estimate on Your Tub-to-Shower Conversion
If you’re ready to retire the tub and get a shower you’ll actually use, call (844) 761-9356 for a free on-site estimate in West Perrine. A live person answers, 24/7. We’ll look at the bathroom, measure the alcove, check the drain and valve, and give you a written line-item quote with the exact number before you commit to anything. From foundation to finish line, it’s one call and no surprises.
Written by the team at Groundwork Construction Co.