AfterTub to Shower Conversion Cost in The Hammocks, FL: What the Slab Adds to the Bill
A tub to shower conversion in The Hammocks typically runs $3,500-$10,000, and the full bathroom remodel it’s often part of lands at $9,000-$28,000. That spread is wide for a reason: moving a drain across a concrete slab can add $500-$1,500 on its own. Call (844) 761-9356 and a live person answers, day or night, with an upfront price before anyone touches a tile.
Key Takeaways
- The Hammocks homes sit on CBS slab foundations, so drain relocation means saw-cutting and patching concrete, not just rerouting pipe in a joist bay.
- Budget $500-$1,500 for that slab work depending on how far the drain has to move.
- Miami-Dade requires a plumbing permit for drain relocation, and the county inspection timeline adds real days to your project.
- Groundwork’s 730-Day Done Right Promise covers the slab patch and waterproofing membrane, the two spots most likely to fail.
Why the Drain Is the Line Item That Separates a Real Bid From a Low-Ball One
Groundwork Construction Co. of The Hammocks has been remodeling these homes since 2014. Our technicians have up to 12 years of experience, and the single most common surprise on a tub-to-shower job here is what happens when the old tub comes out.
Your tub drain and your planned shower drain rarely land in the same place. When they don’t, the new drain has to meet the old pipe. In a wood-frame house out of state, that’s plumbing work inside a crawlspace or a joist bay. In The Hammocks, it’s a concrete floor.
That means saw-cutting the slab, digging down to the drain line, rerouting or adding a trap, then patching the concrete back and sealing it before waterproofing even begins. It’s dusty, it’s loud, and it’s the work a cheap quote quietly leaves out. When you compare bids, ask every contractor one direct question: is the slab cut and patch in this number? If the answer is vague, you haven’t been quoted a conversion. You’ve been quoted a shower insert.
What Tub-to-Shower Work Actually Costs in The Hammocks
These are the market ranges we quote across The Hammocks. The up-front number you get from us is the number you pay.
| Project / line item | Typical range |
|---|---|
| Tub-to-shower conversion (standard) | $3,500-$10,000 |
| Walk-in shower installation | $4,500-$12,000 |
| Shower replacement (same drain location) | $3,000-$8,500 |
| Slab cut and drain relocation (add-on) | $500-$1,500 |
| Full bathroom remodel | $9,000-$28,000 |
| Bathroom vanity installation | $800-$3,000 |
Where your project lands inside that $9,000-$28,000 band depends on three things: whether the drain moves, whether the walls get retiled, and what the demo uncovers. Financing at 0% for 18 months is available, and projects over $10,000 take $1,000 off.
The Tile Behind the Tub, and Why the Walls Usually Come With It
Here’s the second thing most cost guides skip. Hammocks bathrooms were built in the 1980s through the 2000s, and the tile on those walls is not coming back into production. Pull the tub surround and you’ll often find the original tile running behind it, right up to where it stops in a line you can’t hide.
Matching decades-old tile is impossible. So in practice, a conversion in this neighborhood means re-tiling the whole wall, not just the shower. That scope belongs in the first quote, not in a change order after demo day. We walk through the bathroom with you, open the wall where we can, and price the retile up front so you’re not staring at a half-finished room and a revised invoice.
Permits, Inspections, and a Timeline That’s Actually Real
Miami-Dade requires a plumbing permit for any drain relocation. In unincorporated Kendall, that review and inspection runs through the county, and we don’t pretend otherwise. A drain move adds steps to your calendar, and we’d rather tell you that on day one than explain it on day twelve.
Budget your time around the inspection schedule, not around a sales pitch. If you’re comparing timelines, ask each contractor how they handle the county inspection and who’s on site for it. That answer tells you a lot about how the rest of the job will go.
For the wider scope this fits into, see our Bathroom Remodeling service and our local Bathroom Remodeling in The Hammocks page.
Common Scenarios We Walk Into on These Blocks
The Hammocks was built as one large master-planned tract, mostly in a narrow window. That gives us a pattern we don’t see in every part of Kendall. Whole streets hit the same milestone together, so what we find under one tub is usually what we find under the next three.
- The corroded cast-iron drain. On some 1980s builds, decades of humidity and use leave the old drain line thin and failing. We find it during demo, not after. Because a live person answers our phone around the clock, you get a decision and a revised quote the same day.
- The stucco and moisture question. South Florida humidity and wind-driven summer rain make moisture intrusion the enemy. If a wall has been quietly letting water in for years, the conversion is the moment it surfaces.
- The “my neighbor just did this” call. When one home on the block finishes a bath remodel, the calls start down the street. We know the vintage, the pipe, and the likely surprises before we cut.
What Our Written Guarantee Covers
The 730-Day Done Right Promise covers the two elements most likely to fail in any tub-to-shower conversion: the slab patch and the waterproofing membrane. If moisture intrusion shows up in year one, proving whose fault it is becomes our job, not yours. That’s the point of a guarantee backed in writing.
We use trusted brands like Kohler for fixtures, and every technician arrives background-checked and in uniform. From foundation to finish line, one accountable contractor handles the whole room. Ready to talk numbers? Start here and we’ll get you a free estimate and design consult.
FAQs
Most conversions here run $3,500-$10,000, with drain relocation across the slab adding $500-$1,500. The exact number depends on how far the drain moves and whether the walls need a full retile. Call (844) 761-9356 for an exact quote - estimates are free.
Only if the new shower drain lands where the old tub drain sits. When the layout stays put, you avoid the slab cut entirely and land near the $3,000-$8,500 shower replacement range. If the drain has to move, the slab work isn’t optional. We’ll tell you which case you’re in before any cutting starts.
For a worn tub and a bathroom you plan to keep, a conversion usually gives better long-term value than patching a failing surround in a 1980s-2000s home. If the tub is sound and the layout works, a shower replacement costs less. We price both so you can compare side by side. Call (844) 761-9356 and an experienced technician will walk you through it.
Plan on the drain move plus the Miami-Dade plumbing permit and county inspection schedule, which is why we quote a realistic timeline instead of a sales-pitch one. Small jobs without a drain move move faster. We give you the schedule up front and hold to it.
Get Your Upfront Price Today
Bring us the bathroom and we’ll bring the numbers. Groundwork Construction Co. of The Hammocks gives you an up-front price with the slab work, the retile, and the permit all in the same quote, backed by the 730-Day Done Right Promise. Call (844) 761-9356 for a free estimate, and a live person answers, 24/7.
Written by the team at Groundwork Construction Co. of The Hammocks, serving The Hammocks, FL.
What Our Customers Say
"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."
- Marco Castillo"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong