New Detached ADU in Three Lakes, FL: What It Costs and How Long It Takes
A new detached ADU in Three Lakes typically runs $45,000 – $130,000 and takes four to seven months from signed contract to final inspection. The low end covers a modest one-bedroom unit on an existing slab; the high end covers a full two-bedroom, two-bath structure with a kitchen, its own electrical service, and impact-rated windows and doors. Call (844) 761-9356 and we’ll walk your lot, confirm what Miami-Dade will require, and put a real number in writing.
The Stage-by-Stage Sequence for a New Detached ADU in Three Lakes
Detached work moves in a predictable order. Here’s what actually happens, and where your decisions land.
Stage 1: Site walk and feasibility (week 1)
We measure setbacks, check where your existing sewer lateral and water main run, and confirm the lot can hold the footprint you want under Miami-Dade setback and lot-coverage rules. You decide the unit size and whether it’s a studio, one-bedroom, or two-bedroom. This is also where the HOA architectural review packet gets assembled, because in Three Lakes that submission runs parallel to everything else.
Stage 2: Design, engineering, and permits (weeks 2 – 8)
Drawings go to an engineer for wind-load and foundation detailing, then to Miami-Dade for plan review. Expect four to eight weeks in the county queue. You sign off on the final layout, exterior finish, and roof pitch here. Nothing gets ordered until the permit is issued.
Stage 3: Site prep and foundation (weeks 9 – 12)
We clear the footprint, run underground plumbing and electrical conduit, and pour the slab or stem-wall foundation. Inspections happen before the pour and again after. On a tight Three Lakes lot, staging the material drop and keeping the driveway clear is a real part of the plan.
Stage 4: Structure, roof, and rough-in (weeks 13 – 20)
Concrete block walls go up, then the tie-beam, then the roof framing and barrel-tile or shingle cover. Rough electrical, plumbing, and mechanical inspections follow. You’ll choose fixtures and finishes during this window so nothing sits waiting.
Stage 5: Finishes and final inspection (weeks 21 – 28)
Insulation, drywall, cabinets, tile, paint, and trim. Final building, electrical, and plumbing inspections, then the certificate of occupancy. We walk the unit with you and hand over the warranty paperwork. Everything we build is covered by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for a Detached ADU
- Stick-built versus panelized shell: A site-built concrete-block structure matches your existing Three Lakes house and handles hurricane wind loads without question. A panelized or prefab shell can shorten framing time by a couple of weeks but still needs local engineering and permits, so the savings are smaller than they look.
- Exterior finish: James Hardie fiber-cement siding holds paint longer in South Florida sun than stucco over block, but stucco matches the neighborhood look. Most Three Lakes homeowners pick stucco for the main walls and fiber-cement for accents.
- Roof: Barrel tile to match the main house, or a standing-seam metal panel that sheds the May – November rain more cleanly. Tile costs more up front and needs the same wind-mitigation detailing either way.
- Windows and doors: Impact-rated glazing is effectively standard on new construction in the High-Velocity Hurricane Zone. Non-impact units with shutters are cheaper at purchase and a hassle every storm.
- Kitchen and bath: A full kitchen with KraftMaid or Wellborn cabinetry and a real range versus a kitchenette with a sink and microwave. This one choice swings the budget more than any other.
- Utilities: Tapping your existing electrical service versus pulling a separate meter. A separate meter makes the unit legally rentable as its own address and adds cost and coordination with FPL.
What a New Detached ADU Costs in Three Lakes, FL
Plan on $45,000 – $130,000. Where your project lands depends on five variables:
- Size and bedroom count: A 400-square-foot studio sits near the bottom; a 900-square-foot two-bedroom near the top.
- Utility runs: Distance from your main panel and sewer tap. A 40-foot trench across a finished yard is not the same as a 10-foot connection.
- Kitchen and bath scope: A full kitchen adds roughly $12,000 – $25,000 over a kitchenette.
- Finish grade: Tile versus luxury vinyl, custom cabinets versus stock, impact glazing on every opening.
- Permit and engineering scope: County plan review, wind-load engineering, and any HOA review fees.
A written estimate from us lists each line and the permit fees separately. It does not include landscaping restoration, furniture, or appliance upgrades beyond what we spec together. The number you see is the number you pay, and 0% financing for 18 months plus $1,000 off projects over $10,000 is available if you need it.
See the difference
Before
After
Before
After
Before
AfterWhat Three Lakes Homes Specifically Do to This Job
Three Lakes is a built-out 1980s – 90s pocket of western Kendall, ZIP 33186, where the housing stock is concrete block with stucco and barrel-tile roofs. That matters for a detached ADU in two ways. First, we’re almost always tying a new structure into a 30-plus-year-old service panel and sewer lateral, and those connections often need upgrading before the county will sign off. Second, Miami-Dade’s post-Surfside product-approval and wind-mitigation rules mean every component on a new roof or opening has a current approval number, and we plan the inspection sequence around the county’s timeline rather than against it. Lots in the villa and townhome sections here are tight, so staging space is part of the site plan from day one. If your project grows into something larger, that’s part of a full Home Additions & ADU in Three Lakes conversation, and homeowners often pair this with Kitchen Design & Layout in Three Lakes when the unit will get real use.
Serving Three Lakes, FL – Our Local Coverage Area
We serve Three Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Three Lakes
Four to seven months from signed contract to certificate of occupancy, with permit review as the single biggest variable. Call (844) 761-9356 for a timeline built around your lot.
Yes. Miami-Dade County requires a full building permit plus electrical, plumbing, and mechanical permits, and each is inspected separately. We pull the permits and manage the inspections.
Only if a code-compliant connection point already exists within reach, which is rare on Three Lakes lots. Most projects need a new trench run from the main panel and a tie into the sewer lateral.
$45,000 – $130,000 depending on size, kitchen scope, utility runs, and finish grade. Call (844) 761-9356 for an exact quote – estimates are free.
Every ADU we build carries our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If it’s not done right, we make it right.
Get a Free Estimate for Your Detached ADU in Three Lakes
Call (844) 761-9356 and a live person answers, day or night. We’ll schedule a free on-site estimate, measure your lot, review setbacks and HOA requirements, and hand you a written line-item quote with permits and engineering broken out. Our technicians have up to 12 years of experience, and they arrive background-checked and in uniform. If you’re weighing this against smaller jobs, see our Home Additions & ADU service and the work we do across Three Lakes.