Junior ADU & Interior Conversion in Kendale Lakes, FL: What It Costs and What It Takes
A junior ADU and interior conversion in Kendale Lakes typically runs $45,000 to $130,000, depending on the size of the unit, how much of the existing interior gets rebuilt, and what the structure needs before finish work starts. Most projects take 10 to 18 weeks from permit to final inspection. The work turns an underused room, wing, or attached space into a self-contained living suite with its own entry, kitchenette, bath, and climate control. Call (844) 761-9356 to schedule a free on-site estimate.
How junior ADU and interior conversion actually runs, stage by stage
Most contractors hand you a start date and disappear into the drywall. Here is the sequence we follow, what happens at each stage, and what you’ll be deciding while it moves.
Stage 1: Site walk and feasibility (week 1)
We measure the candidate space, check ceiling height, slab condition, and where the electrical panel and water heater sit. In Kendale Lakes CBS homes, we look closely at whether the wall you want to open carries load. You decide the unit’s footprint and whether it keeps its own exterior door or shares an entrance. This stage ends with a written, line-item scope.
Stage 2: Permits and drawings (weeks 2 – 5)
Miami-Dade plan review is the long pole. A junior ADU touches zoning, egress, and life-safety, so drawings go in early. You approve fixture and finish selections during the wait so nothing stalls at the counter. Typical review runs 3 to 6 weeks, longer if the plan examiner comes back with comments.
Stage 3: Demo, rough-in, and inspections (weeks 6 – 9)
We open the walls, frame any new partitions, and run plumbing, electrical, and HVAC for the unit. You get a rough-in inspection before a single piece of drywall goes up. If you’re pulling a separate meter for the ADU, the utility coordination happens here, and it’s the step most homeowners underestimate.
Stage 4: Insulation, drywall, and finish (weeks 9 – 15)
Spray foam or batt goes in, then drywall, tape, and texture. Cabinets, counters, tile, and fixtures land in a set order so trades don’t fight for the room. You confirm color and hardware this stage; changes after this point add dollars and days.
Stage 5: Final inspections and walkthrough (weeks 15 – 18)
Electrical, plumbing, and building finals clear, then we walk the unit together and build a punch list. That’s when the 730-Day Done Right Promise kicks in. This is often part of a full Home Additions & ADU in Kendale Lakes scope if the unit expands beyond a single interior space.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually change your unit
Every junior ADU comes down to a handful of forks in the road. Here’s what you’re deciding between, with the honest trade-off on each.
- Kitchenette vs. full kitchen. A sink, two-burner cooktop, and under-counter fridge keeps the unit under most ADU size limits and saves on plumbing. A full range and dishwasher cost more in rough-in and push the electrical load higher, but suit a longer-term tenant or family member.
- Wet bath layout. A Kohler or Moen shower-and-vanity combo keeps the footprint tight and the budget predictable. A walk-in with custom tile runs higher and takes an extra week, but holds up better to daily use.
- Countertop material. Silestone or Caesarstone quartz gives a durable, low-maintenance surface and resists the humidity that plagues laminate in South Florida. Laminate is the cheaper call and the one that fails first in a small, poorly vented suite.
- HVAC approach. A ductless mini-split keeps the unit independent and simplest to permit. Tapping the main house system costs less up front but can leave both spaces uncomfortable and complicates metering.
- Separate entry vs. shared. Its own exterior door costs more in framing and finish but makes the unit rentable and makes inspection cleaner. A shared entrance is cheaper and fine for family use.
What junior ADU and interior conversion costs in Kendale Lakes, FL
Expect $45,000 to $130,000 for the full job in Kendale Lakes. The low end fits a single interior space with an existing bath rough-in and modest finishes. The high end is a larger unit with a new entry, a full kitchen, and a separate meter. Here’s what moves the number:
| Line item | Typical range |
|---|---|
| Junior ADU & interior conversion (full) | $45,000 – $130,000 |
| Garage conversion | $30,000 – $80,000 |
| Full ADU construction | $90,000 – $220,000 |
| Kitchenette installation | $14,000 – $45,000 |
| Bath build-out | $9,000 – $28,000 |
The four variables that most often push a job toward the high end: relocating plumbing or a load-bearing wall, running a new electrical service or meter, upgrading to impact glass on the new door and windows, and finish grade on the kitchenette. Our written estimates itemize each trade and mark what’s included, so the number you see is the number you pay. Call (844) 761-9356 for a free estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Kendale Lakes homes specifically do to this job
Construction in Kendale Lakes is redoing a Kendall subdivision that’s already built out, not building one. Nearly every project here is a remodel inside a 1970s-90s CBS ranch on a small lot in 33183, which shapes the work in ways a greenfield job never sees. Miami-Dade’s post-Andrew product approval and post-Surfside structural inspection rules mean a new exterior door or window often becomes the permit entry point before the ADU scope even starts. The flat or low-pitch roofs and stucco walls common to these homes hide moisture intrusion that shows up once you open a wall. We plan for that, and we tell you when it’s found rather than surprising you with it later. If you’re refreshing the main house alongside the unit, homeowners often pair this with Small & Partial Kitchen Remodels in Kendale Lakes to keep the finishes consistent.
Serving Kendale Lakes, FL – Our Local Coverage Area
We serve Kendale Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Junior ADU & Interior Conversion in Kendale Lakes
Most Kendale Lakes projects run 10 to 18 weeks, with permitting eating 3 to 6 of those weeks. The build itself moves faster once inspections clear. Call (844) 761-9356 for a timeline tied to your specific space.
Yes. A junior ADU in Kendale Lakes requires permits for the structural, plumbing, electrical, and life-safety work, and Miami-Dade will inspect each stage. We pull the permits and handle the inspections so you’re not the one chasing the inspector.
Often, yes, if your existing bath rough-in and layout cooperate. Keeping the wet wall in place can save a meaningful slice of the budget. When a load-bearing wall or a relocation is unavoidable, we tell you before we quote, not after.
The typical range is $45,000 to $130,000, and the spread comes down to size, existing condition, plumbing and electrical changes, and finish grade. Call (844) 761-9356 for an exact written quote; estimates are free.
Every junior ADU and interior conversion we build is covered by the 730-Day Done Right Promise. If it’s not done right, we make it right, for two full years after the walkthrough.
Get a free on-site estimate for your junior ADU
If you’re weighing a junior ADU and interior conversion in Kendale Lakes, start with a free on-site estimate. We walk the space, measure, check the panel and plumbing, and hand you a written, itemized scope with upfront pricing and no surprises. Calls are answered by a live person, 24/7, and technicians arrive background-checked and in uniform. Call (844) 761-9356 to book yours, and see how this fits into the broader Home Additions & ADU work we do across Kendale Lakes.
Written by the team at Groundwork Construction Co.