A Groundwork company - serving The Hammocks, FL
Garage Conversion ADU in South Miami Heights, FL | Groundwork Construction Co. of The Hammocks

Garage Conversion ADU in South Miami Heights - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in South Miami Heights, FL: What It Takes and What It Costs

A garage conversion ADU in South Miami Heights typically runs $35,400 to $94,400 and takes 10 to 16 weeks from permit submission to final inspection. The job turns an existing attached garage into a permitted living unit – bedroom or studio, full bath, kitchenette, separate entrance – without new exterior walls. Every conversion here needs Miami-Dade County permits. Call (844) 761-9356 for a free on-site estimate.

Call (844) 761-9356

Key takeaways:

  • Most South Miami Heights conversions land in the $35,400 – $94,400 band; plumbing location and bathroom count drive the swing.
  • Permits and inspections are the long pole, not the carpentry.
  • Older CBS garages often need structural documentation before you can pull a permit.
  • Costs are quoted line-item, upfront, with a 730-Day Done Right Promise behind the work.

How does the conversion actually run, stage by stage?

Here’s the real sequence, with the decisions you make at each step.

Stage 1: Feasibility and design (weeks 1-2)

We measure the garage, check ceiling height, and confirm the slab can carry the intended use. You decide the layout – studio, one-bedroom, or one-bedroom-plus-kitchenette – and where the bathroom sits. That single decision (bathroom on the shared wall with the house, or on the outer wall) sets the plumbing cost. You’ll also choose whether the driveway-facing opening becomes a wall with a window or a set of impact-rated French doors.

Stage 2: Permit drawings and submissions (weeks 2-5)

We produce the drawings, submit to Miami-Dade County, and track the review. Your decision here: if the garage is on an older block home, you may need a structural or wind-loading letter. We tell you up front if that’s likely so it doesn’t blindside you mid-review.

Stage 3: Demolition and rough-in (weeks 5-8)

Out go the garage door, opener, and track. We frame the new opening, run plumbing for the bath and kitchenette, pull electrical circuits, and add HVAC – most garages have none. You confirm fixture locations and outlet placement before the drywall closes. This is the stage where moving a bathroom wall by two feet costs real money, so we lock it in writing first.

Stage 4: Insulation, drywall, and finishes (weeks 8-13)

We install mold-resistant assemblies suited to South Florida humidity, tape and finish drywall, then set flooring, cabinets, fixtures, and paint. You choose finishes here – and homeowners often pair the kitchenette with Cabinets & Countertops in South Miami Heights so the unit matches the main house.

Stage 5: Final inspections and punch list (weeks 13-16)

Building, electrical, plumbing, and mechanical inspections get scheduled and passed. We walk the unit with you, fix the punch list, and hand over a clean, permitted ADU. The 730-Day Done Right Promise covers the workmanship from day one.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

What are the real choices you’ll weigh on this job?

  • Bathroom position: Stacking the bath against an existing wet wall keeps plumbing runs short. A bath on the far wall looks better on paper but adds trenching and venting cost. Worth it only if the layout truly needs it.
  • Exterior wall and door system: Impact-rated French doors or a picture window where the garage door was. Impact glass costs more upfront but Miami-Dade wind codes here effectively require it, and it holds up to hurricane season.
  • Flooring: Porcelain tile is the practical default for a garage slab – it tolerates humidity, cleans easily, and matches the block-home aesthetic. Luxury vinyl plank is warmer underfoot but less forgiving of slab moisture.
  • Kitchenette grade: A compact KraftMaid or Wellborn cabinet run with a quartz top reads like a real kitchen; a stock cabinet package saves a few thousand but looks like a converted garage. You pick the line and we price it line by line.
  • HVAC: A dedicated mini-split is the usual answer for a garage with no ducts. Extending the house system is cheaper to install but stresses the main unit.

Homeowners finishing a unit for family or rental often pair this with Backsplash, Tile & Flooring in South Miami Heights to tie the new space to the rest of the house.

What does a Garage Conversion ADU cost in South Miami Heights, FL?

Expect $35,400 to $94,400 for a permitted conversion in South Miami Heights. That’s real money, and it moves for five reasons.

  • Size: A one-car garage around 240 sq ft sits near the low end; a two-car conversion at 400+ sq ft pushes toward the top.
  • Bathroom count: One bath is standard. A second adds plumbing, venting, and finish cost.
  • Plumbing and electrical relocation: Reusing the shared wet wall versus trenching a new slab run is the biggest single swing.
  • Structural work: Removing or reinforcing a beam, or adding a cased opening to the main house, adds cost and engineering.
  • Finish grade: Stock cabinets and builder fixtures versus a KraftMaid kitchenette and quartz counters.

A written estimate covers demo and haul-away, framing, rough-in, insulation, drywall, finishes, fixtures, permit fees, and inspections. It typically excludes furniture, appliances above the standard package, and any pre-existing code violations in the main house discovered during inspection. The number on the quote is the number you pay – we don’t do change orders for surprises we should have caught.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What do South Miami Heights homes specifically do to this job?

Most garages we convert here sit on 1970s-1990s single-family concrete-block homes with stucco exteriors and flat or low-slope roofs, and that CBS construction shapes everything. The county’s 40-year (now 50-year) recertification requirement and post-Hurricane Andrew wind-mitigation code mean an older block home often needs documented structural and roof upgrades before an addition or conversion can be permitted. We see it in the 33177 ZIP constantly – a homeowner off SW 184th Street ready to build, only to learn the roof deck or tie-downs need paperwork first. That inspection burden is the real cost driver on South Miami Heights jobs, not the drywall. If the conversion is part of a larger plan, it usually fits inside our broader Home Additions & ADU in South Miami Heights scope, and we handle it all under one contractor.

Serving South Miami Heights, FL – Our Local Coverage Area

We serve South Miami Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: Garage Conversion ADU in South Miami Heights

Ready for a real number on your garage conversion?

We’ll come out, measure the garage, look at the block construction and the roof, and tell you honestly what Miami-Dade will require. You leave with a line-item written estimate and a realistic timeline – no pressure, no vague bids. Groundwork Construction Co. of The Hammocks handles the whole job, foundation to finish line, across South Miami Heights and the surrounding neighborhoods. Call (844) 761-9356 to schedule your free estimate, or reach out through Home Additions & ADU to see how this fits a larger plan.

Written by the team at Groundwork Construction Co.

Why South Miami Heights Chooses Groundwork Construction Co. of The Hammocks

We set the standard for garage conversion ADU in South Miami Heights.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in South Miami Heights

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What South Miami Heights Customers Say

Trusted by homeowners across South Miami Heights and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in South Miami Heights?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in South Miami Heights.

(844) 761-9356

Request a Free Estimate in South Miami Heights

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch