Full Kitchen Remodeling in The Hammocks, FL: What It Takes and What It Costs
Full kitchen remodeling in The Hammocks runs $14,000 – $45,000 for most homes, and a typical CBS tract house from the 1980s – 2000s build era takes 5 to 8 weeks from demolition to final walkthrough. You’re replacing cabinets, counters, backsplash, sink, faucet, and flooring, usually with new lighting and outlets, and often reconfiguring a wall or two. Call (844) 761-9356 and we’ll walk your kitchen, measure it, and put a line-item number in writing.
How a Full Kitchen Remodeling Project Actually Runs, Stage by Stage
Most contractors tell you “we handle everything.” That’s not a schedule. Here’s the real sequence we run on a full kitchen remodel in The Hammocks, what happens when, and where you have to make a decision.
Stage 1: Measure, design, and permit (week 1 – 2)
We measure the room, check what’s behind the drywall, and confirm the layout. You pick the cabinet line, door style, counter material, and finish schedule here, because everything downstream depends on lead times. KraftMaid and Wellborn both run 4 to 6 weeks on semi-custom cabinets, so this decision sets the whole calendar. We pull the permit during this window.
Stage 2: Demo and rough-in (days 1 – 4)
Day 1 is tear-out: cabinets, counters, old backsplash, and flooring come out, and the room gets protected and sealed off. Days 2 through 4 are the rough work, which is where a full remodel separates from a cosmetic one. If you’re moving the sink, the range, or adding a dishwasher line, the plumber re-routes supply and drain here. The electrician runs new circuits for the microwave, disposal, and any added outlets. If a wall is coming down, we confirm it isn’t load-bearing before anyone swings a hammer.
Stage 3: Inspection (day 5)
Rough plumbing and electrical get inspected before anything closes up. This is the step homeowners forget to ask about, and it’s the one that protects you at resale. We schedule it and we’re on site for it.
Stage 4: Drywall, cabinets, and counters (week 2 – 5)
Drywall goes up, gets taped and sanded, then cabinets set. Cabinet install runs 2 to 3 days in a normal-size Hammocks kitchen. Template for countertops happens once cabinets are level and secured, and fabrication adds 5 to 10 business days for quartz or granite. This is the stretch where the room looks unfinished the longest. It’s normal.
Stage 5: Tile, fixtures, and punch list (week 5 – 8)
Backsplash, flooring, sink set, faucet, disposal, outlet covers, and appliance hookup. Then we walk the room with you, mark anything that isn’t right, and fix it before we call the job done. That final walkthrough is the part the 730-Day Done Right Promise is built around: if something isn’t right after we leave, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make (and What Each One Costs You)
A full kitchen remodel is really six or seven decisions. Here’s what the options are and the honest trade-off on each.
- Semi-custom vs. stock cabinets. KraftMaid and Wellborn semi-custom gives you the exact widths to fit the room and a longer finish warranty, at 4 to 6 weeks of lead time. Stock cabinets arrive in a week but force filler strips and limit your layout.
- Quartz vs. granite counters. Quartz is non-porous and doesn’t need sealing, which matters in South Florida humidity. Granite handles heat better and shows more natural variation, but it needs resealing once a year.
- Porcelain tile vs. luxury vinyl plank flooring. Tile is the Florida standard and survives a wet mop and a dropped pan. LVP is warmer underfoot and faster to install but can cup near a leak.
- Undermount vs. drop-in sink. Undermount looks cleaner and makes wiping the counter into the sink easy. It requires a solid counter and a slightly higher install cost.
- Layout: keep or move. Keeping the sink, range, and fridge where they are saves $2,000 to $6,000 in plumbing and electrical work. Moving the range or adding an island is the single biggest cost driver in the job.
- Lighting. Recessed cans plus under-cabinet LED is the standard upgrade. Adding a dedicated circuit for it is a permit item, not a weekend add-on.
What Full Kitchen Remodeling Costs in The Hammocks, FL
A full kitchen remodel in The Hammocks runs $14,000 to $45,000. A small or partial kitchen remodel lands $9,000 to $20,000. Where your job falls on that range comes down to five things.
| Line item | Typical range |
|---|---|
| Full kitchen remodel | $14,000 – $45,000 |
| Small or partial kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
The low end of that range is a cosmetic remodel: same layout, same plumbing locations, stock-grade cabinets, laminate or entry-level quartz, and a tile floor over the existing slab. The high end is a layout change with moved plumbing, semi-custom cabinetry, quartz throughout, an added island, and new lighting circuits. The five variables that move the number most:
- Room size and cabinet count. A galley kitchen and an open-plan kitchen in a 1990s Hammocks home are two different jobs.
- Condition behind the drywall. Water damage under an old sink or a discontinued drain stub changes the rough-in scope.
- Moving plumbing, electrical, or a wall. Each one adds permit scope and trade time.
- Material grade. Cabinet line and counter material swing the total by thousands, more than labor does.
- Permit scope. A straight replacement pulls a simpler permit than a layout change with moved services.
A written estimate from us lists cabinets, counters, tile, fixtures, labor, and permit line by line. What it doesn’t include: appliances unless you ask us to supply them, and any structural repair we can’t see until demo. We flag that possibility before we start, not after. Upfront pricing means the number on the estimate is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat The Hammocks Homes Specifically Do to This Job
The Hammocks is a large unincorporated Kendall-area subdivision built almost entirely between the 1980s and the 2000s, which means almost every kitchen we remodel here is a second-generation job on a 20- to 35-year-old concrete-block home, not new construction. That changes the work in ways a newer community out west doesn’t see. The original kitchens in these tract homes share the same vintage problems: particleboard cabinet boxes that swell at the toe kick, laminate counters delaminating at the sink cutout, and a single small window over the sink that makes the room dark by 4 p.m. Whole blocks hit the same milestone around the same time, so we regularly do two or three kitchens on the same street in a season. And every one of them is a renovation under Miami-Dade’s post-Andrew wind and impact code, which means if the plan touches a window or a sliding glass door, the replacement has to be a rated product with the paperwork to prove it. Interior walls, plumbing, and electrical inside the envelope don’t carry that requirement, but the exterior opening does. If you’re also updating the bathroom while the dust is up, homeowners often pair a full kitchen remodel with Full Bathroom Remodeling in The Hammocks or a Walk-In Showers & Shower Remodeling in The Hammocks so the trade visits stack. Our kitchen remodeling team handles the whole scope under one contract. If you want the wider project picture, start with Kitchen Remodeling in The Hammocks, and see the neighborhoods we cover on our The Hammocks service area page.
Serving The Hammocks, FL – Our Local Coverage Area
We serve The Hammocks and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Kitchen Remodeling in The Hammocks
Most full kitchen remodels in The Hammocks take 5 to 8 weeks from demo to final walkthrough. The two variables that stretch it are cabinet lead time (4 to 6 weeks for semi-custom) and countertop fabrication (5 to 10 business days after template). Call (844) 761-9356 for a schedule built around your specific kitchen.
Yes, if the work involves plumbing, electrical, or moving a wall, you need a permit and a rough inspection. A straight cosmetic swap of cabinets and counters in the same footprint often doesn’t. We pull the permit and we’re on site for the inspection, and the cost is in your written estimate so it isn’t a surprise later.
Yes, and it’s the fastest way to hold the budget. Keeping the sink, range, and fridge in their current spots saves roughly $2,000 to $6,000 in plumbing and electrical rough-in, and it usually shortens the job by a week. You can still change cabinet layout, counters, backsplash, and lighting. Call (844) 761-9356 and we’ll tell you what your existing layout can support.
Full kitchen remodeling in The Hammocks costs $14,000 to $45,000, with small or partial remodels at $9,000 to $20,000. The range reflects cabinet line, counter material, layout changes, and permit scope. Call (844) 761-9356 for an exact quote – the free estimate is done on site, with line items.
Every full kitchen remodeling project we complete is covered by the 730-Day Done Right Promise. That’s two years on workmanship: if something isn’t right, we come back and make it right. Product warranties from KraftMaid and Wellborn run separately and we hand you the paperwork. Ask about it when you call (844) 761-9356.
Get a Free Estimate for Full Kitchen Remodeling in The Hammocks
Call (844) 761-9356 to schedule a free on-site estimate for full kitchen remodeling in The Hammocks. A live person answers, day or night. We’ll measure the room, talk through layout and materials, and leave you with a written line-item estimate and a realistic schedule. If you’re planning the project alongside other work, ask about the $1,000 off projects over $10,000 and 0% financing for 18 months.
Written by the team at Groundwork Construction Co.