Full Bathroom Remodeling in Richmond West, FL: Scope, Timeline and Cost
A full bathroom remodel in Richmond West runs $9,000 to $28,000 and typically takes four to seven weeks from demo to final inspection. You’re replacing the tub or shower, vanity, toilet, tile floor and wall finishes, lighting and ventilation in one coordinated job, not layering a new vanity over 1990s builder work. Call (844) 761-9356 for a free on-site estimate before you commit to a number.
How the Job Actually Runs, Stage by Stage
Full Bathroom Remodeling has a sequence, and it doesn’t compress well. Here’s what happens and when, so you know what you’re deciding and on which day.
Stage 1: Measure, design and material selections (week one, before any tool comes out)
We measure the room, photograph existing plumbing and electrical, and check the subfloor and wall framing. This is when you pick tile, vanity, fixtures and finishes. Decisions you own here: tile size and grout color, vanity width and top material, shower valve brand, lighting layout. That single week of decisions saves two weeks of change orders later.
Stage 2: Permit and protection (days one to three)
We pull the required permits and cover floors, adjacent rooms and HVAC returns before demo. The signed, line-item scope is the anchor here – the number you approve is the number you pay. Protect-the-rest-of-the-house work is a full day on its own.
Stage 3: Demo and rough-in (days three to eight)
Tear-out of tile, tub, vanity and drywall takes two to three days on a typical Richmond West bathroom. Then plumbing rough-in, electrical rough-in and any framing changes, followed by the rough inspection. This is the one stage where hidden problems surface: a rotted subfloor, a slow drain, old galvanized supply lines.
Stage 4: Waterproofing, tile and fixtures (days eight to twenty-five)
Waterproofing membrane, then tile walls and floor, then grout and cure. Vanity and toilet set next, then shower glass, trim and paint. Waterproofing is where a full remodel earns its keep. Skip it and the tile job fails in five years.
Stage 5: Final inspection and walkthrough (days twenty-five to thirty-five)
Final inspection, then a walkthrough with you. Every item on that walkthrough list gets closed under our 730-Day Done Right Promise, which covers workmanship for two full years after we hand back the keys.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Change the Result
A full bathroom gut is a rare chance to fix what the builder got wrong. These are the decisions worth your attention.
- Tile: porcelain vs. natural stone. Porcelain runs roughly $4 to $12 per square foot installed and shrugs off humidity. Marble and travertine cost more, need sealing, and stain faster in a steamy South Florida bathroom.
- Shower waterproofing: cement board plus membrane vs. a bonded sheet system. The membrane route costs less; a bonded sheet system costs more but gives you a written manufacturer warranty. We install both. We don’t skip either.
- Ventilation: a proper exhaust fan vs. a cheap builder-grade unit. A quiet 110 CFM fan with a timer keeps the room dry and stops the mold creeping behind fresh paint. Upgrading this costs little and everything depends on it.
- Vanity: stock vs. semi-custom. Stock cabinets from a KraftMaid or Wellborn line fit most Richmond West footprints. Semi-custom buys you a better drawer box and a tailored fit at a higher price.
- Layout: keep the drain and toilet where they sit vs. move them. Keeping plumbing in place saves money and inspection headache. Moving the toilet or shower drain means a slab cut on a Richmond West slab-on-grade home, and that’s real money.
What Full Bathroom Remodeling Costs in Richmond West, FL
Expect $9,000 to $28,000 for a full bathroom remodel here. A hall bath with stock finishes lands near the bottom. A primary bath with custom tile, a relocated shower and upgraded fixtures lands at the top.
What pushes the price:
- Size. A 40-square-foot hall bath and an 85-square-foot primary bath are different jobs.
- Condition behind the walls. Rotted subfloor, failed cast-iron drain, or missing waterproofing from an earlier remodel adds cost fast.
- Moving plumbing or structure. Relocating a drain, adding a wall, or widening a doorway for a hinged door means permits, framing and slab work.
- Material grade. Basic porcelain and a stock vanity vs. imported stone and a semi-custom vanity is a several-thousand-dollar swing.
- Permit scope. Plumbing and electrical changes trigger more inspections than a cosmetic refresh does.
Your written estimate itemizes demo, rough-in, waterproofing, tile, fixtures, labor and permit fees. It does not include the cost of a surprise slab repair if we find one after demo, which is why we write those as allowances in the quote and true them up with your approval. No-hassle upfront pricing, and 0% financing for 18 months if you want to spread the cost. Projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat Richmond West Homes Specifically Do to This Job
Most of the housing here went up in the 1990s and 2000s, in the gated subdivisions off SW 152nd through 168th Streets near US-1. That means we’re remodeling original builder bathrooms, not new construction. The hall bath in a 1998 house is likely 40 to 45 square feet, with a standard tub, a single-sink vanity and a dark exhaust fan. The tile is dated but sound. The waterproofing behind the shower often isn’t.
The county permitting reality matters on every full bathroom remodel in Richmond West. Miami-Dade’s post-Andrew High Velocity Hurricane Zone rules apply to the windows and doors that open onto a wet bathroom, and any new impact glazing has to carry HVHZ product approval. If you’re in one of the gated communities, expect the HOA architectural review to run alongside the permit process, sometimes ahead of it. Building those two approvals into the schedule up front is the difference between a five-week job and a nine-week one. Call (844) 761-9356 and we’ll walk your specific HOA requirements before we quote.
If the same home needs the roof or a window package addressed, homeowners often pair this with Roof Repair in Richmond West or a full Roof Replacement & Installation in Richmond West. And because this is part of a broader plan for many families, it’s worth seeing the wider Bathroom Remodeling in Richmond West scope alongside our bathroom remodeling service. We also cover the surrounding neighborhoods listed on our Richmond West service page.
Serving Richmond West, FL – Our Local Coverage Area
We serve Richmond West and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Bathroom Remodeling in Richmond West
Four to seven weeks is the honest range, and the countdown starts after permits and material selections are locked, not the day you sign. Demo and rough-in take the first week, tile and waterproofing the next two to three, and fixtures, glass and final inspection close it out. Call (844) 761-9356 for a schedule tailored to your bathroom.
Yes, if you’re changing plumbing, electrical or the shower pan, which a full remodel almost always does. Miami-Dade County requires permits and inspections on that work, and the county’s HVHZ rules apply to new windows or doors. We pull the permits, pass the inspections and hand you the closed-out record.
Often, yes, and it saves meaningful money. Keeping the toilet, shower drain and sink supply where they sit avoids slab cuts and shortens the permit scope. The trade-off is a layout that’s yours to work with, not reinvent. We’ll tell you honestly whether the existing layout is worth keeping.
$9,000 to $28,000, depending on size, condition and material grade. A hall bath with stock finishes sits low; a primary bath with custom tile and a relocated shower sits high. Call (844) 761-9356 for an exact quote and a free on-site estimate.
Our 730-Day Done Right Promise covers workmanship for two full years after completion. If something we installed isn’t right, we make it right. That’s a longer workmanship guarantee than most residential contractors offer, and it’s the reason we document every stage of the job.
Get a Free Full Bathroom Remodeling Estimate in Richmond West
Call (844) 761-9356 for a free on-site estimate on your full bathroom remodel in Richmond West. A live person answers, any hour. We’ll measure the room, review your layout and finish options, and hand you a written line-item quote with the permit and inspection scope spelled out, so you’re comparing real numbers instead of a ballpark. No pressure, no surprises.