Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Techo-Bloc Bathroom Remodeling: The The Hammocks Owner’s Guide
Techo-Bloc bathroom remodeling in The Hammocks typically runs $9,000 – $28,000 installed, depending on tile layout, waterproofing scope, and fixture swaps. We install Techo-Bloc-compatible wall and floor assemblies, match your existing stone or porcelain product to the right current series, and most single-zone jobs are finished in two to four visits. Groundwork Construction Co. of The Hammocks is an independent service provider and is not affiliated with Techo-Bloc.
Owners here usually find out something’s wrong the same way: a hairline crack spreading across a shower floor paver, grout that darkens and never dries, or a tile that sounds hollow when you step on it. In The Hammocks, that hollow sound is your first honest signal. The stone itself is rarely the villain – what fails underneath it is the waterproofing and the setting bed, and the visible paver is just the messenger.
Key takeaways:
- Installed range for a full Techo-Bloc bathroom remodel in The Hammocks: $9,000 – $28,000.
- Failure is almost always membrane, drainage, or thin-set related – not the stone.
- South Florida humidity plus daily shower cycles punishes shortcuts within 18 months.
- Every job we complete is covered by our 730-Day Done Right Promise.
- Call (844) 761-9356 – a live person answers, 24/7.
Which Techo-Bloc Models This Applies To
Techo-Bloc doesn’t make a bath-and-shower product line the way it makes pavers, so what we’re really matching is Techo-Bloc stone and porcelain used as a bathroom finish – typically wall tile, shower floor pavers, or a vanity backsplash assembled from their hardscape lines. The series that come up most in The Hammocks remodels are the ones with tight dimensional tolerance and a rectified edge: Travertina Raw, Mista, and the smooth-face Sandalus and Nordic families. Their modular face sizes (roughly 4×8 up to 12×24 inches, depending on series) are what drive your layout options in a standard 5×8 bath.
To identify the exact product on your floor or wall, pull a loose piece from a closet or behind the toilet and measure the face, the thickness, and the edge profile. Thickness is the tell – a 3cm paver was cut for exterior use, and setting it on a shower floor without the right slope and membrane is where leaks start. If the piece is bonded in place, look for the stamped series name on the factory edge or on a leftover box in the garage.
Here’s the OEM-versus-aftermarket call for Techo-Bloc specifically: since the company doesn’t manufacture bathroom fixtures, there’s no “OEM replacement part” to chase. What matters is matching the current series color and finish, because dye lots shift between production runs. A 2021 Travertina Raw in Chestnut will not perfectly match a 2025 batch. When we can’t source a dead-on match, we isolate the mismatch to a low-visibility zone – behind a door swing or under a vanity apron – rather than pretend it’s invisible. If you’re comparing countertop surfaces in the same remodel, we also install KraftMaid cabinetry, Cambria, and Silestone, and can coordinate the palette.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Techo-Bloc Bathroom Remodeling Is Failing
Water damage in a finished bath moves slowly and then all at once. Watch for these five signals, and don’t wait for the ceiling below to stain.
- Hollow or drummy tile. Tap the floor and walls with a plastic-handled tool. A dead, hollow sound means the thin-set has debonded from the substrate – usually from a setting bed that was never fully cured or a slab that flexed.
- Grout that stays dark after drying. Grout darkening that doesn’t fade overnight points to moisture trapped under the stone. In The Hammocks, the culprit is often a missing or bridged waterproofing membrane at the shower curb.
- Efflorescence and white powder. That chalky haze is mineral salt pushed out by water moving through the assembly. It’s a symptom, not a stain – clean it and it returns within weeks if the moisture source is still active.
- Lippage and lifted edges. A paver that sits proud of its neighbor by more than a couple of millimeters means the substrate has shifted. Stone doesn’t grow; the floor beneath it moved.
- Cracks along a straight line. A crack that runs dead-straight usually follows a control joint, a cold joint, or the edge of a backer board – a structural clue, not a random break.
One Florida-specific reality to file away: our humidity and near-daily shower cycles age a bathroom assembly faster than the same product would last up North. A membrane that survives a dry climate for ten years can fail in The Hammocks in half that time if it was installed thin. Pair that with the afternoon thunderstorms that push moisture through exterior walls, and waterproofing becomes the whole ballgame.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For The Hammocks, here’s a line-item view of what drives the installed number. These are honest market ranges, and your written quote will lock the figure before we start – upfront pricing, no surprises.
- Full bathroom remodel: $9,000 – $28,000
- Small bathroom remodel: $5,000 – $12,000
- Walk-in shower installation: $4,500 – $12,000
- Tub-to-shower conversion: $3,500 – $10,000
- Shower replacement: $3,000 – $8,500
- Vanity installation: $800 – $3,000
What moves you inside that range: whether the waterproofing membrane and drain assembly get fully rebuilt, how much Techo-Bloc stone or porcelain you’re setting, and whether the layout changes require new plumbing rough-in. Parts and labor are quoted separately so you can see exactly where the money lands.
Every project is backed in writing by our 730-Day Done Right Promise – if something isn’t right, we make it right. That long a guarantee only makes sense when the waterproofing was done to spec, which is exactly why we don’t shortcut it. Ask about our current offers: a free project estimate and design consult, 0% financing for 18 months, and $1,000 off projects over $10,000.
DIY or Call Us?
There’s a safe side and an unsafe side to this. You can absolutely check the symptoms yourself: tap for hollow spots, watch a grout line for moisture, and photograph any cracks or efflorescence. Those observations help us quote faster and often catch a leak before it reaches the ceiling below.
What you shouldn’t DIY is the rebuild. Rebuilding a shower pan means removing stone, cutting out the failed membrane, re-sloping the drain, and re-setting the Techo-Bloc product on a correctly cured bed – and doing it wrong means water sitting against your framing for another cycle. Cutting and setting stone over an improperly prepped substrate is a fast path to the exact failure you called about. Electrical and plumbing rough-in inside the wet zone should always go to a licensed tradesperson, and we coordinate those for you.
If you’re seeing any of the signs above in The Hammocks, call (844) 761-9356 for a free estimate. A live person answers around the clock.
FAQs
How long does a Techo-Bloc bathroom last in The Hammocks? A properly installed assembly will hold up for 15 to 25 years, but how long the waterproofing lasts is the real question. In our humidity, cheap membrane work can fail in under two years, while a correctly sloped, fully cured install lasts decades. The stone outlasts everything around it. Call (844) 761-9356 for a free inspection-based estimate.
Can the existing Techo-Bloc stone be repaired instead of replaced? Often, yes. If the failure is isolated – a few drummy pavers or one cracked field tile – we can spot-remove, rebuild the membrane beneath, and re-set matching pieces. Full replacement is only necessary when the leak spans the whole pan or the color lot can’t be matched. We’ll tell you which situation you’re in before you spend anything. Call (844) 761-9356 to schedule.
How long does the swap take? A shower replacement or tub-to-shower conversion typically takes two to four working days; a full bathroom remodel in The Hammocks runs closer to two to three weeks. Cure time for the setting bed and waterproofing drives the schedule and can’t be rushed without gambling on the result. Call (844) 761-9356 for a timeline tied to your specific bath.
How do you source the Techo-Bloc product? We source through regional hardscape suppliers and match against current production batches, checking face size, thickness, and finish before it ever reaches your door. Because color lots shift between runs, we order enough reserve material up front to cover a future repair – something worth planning for on any bathroom in The Hammocks. We never guess on a match; we verify the sample against your existing stone. Call (844) 761-9356 to talk through your product and get a free estimate.
Written by the team at Groundwork Construction Co. of The Hammocks, serving The Hammocks and nearby areas.