KraftMaid Home Additions & ADU: The The Hammocks Owner’s Guide
We build and finish KraftMaid-cabinetry home additions and ADUs for homeowners in The Hammocks, and a typical addition in this market runs about $45,000 to $130,000 installed, with standalone ADU construction at $90,000 to $220,000. This isn’t a “part” that fails overnight the way a hinge or drawer glide does. It’s a scope decision, and owners usually arrive here after a smaller fix turns into a bigger conversation: a cramped kitchen with no pantry, a converted garage that never quite functioned as a bedroom, a casita the family needs to actually hold a bed, plumbing, and a door to the outside. That’s where KraftMaid comes in. The cabinets are the anchor of most additions, and the planning around them is what determines whether the new square footage works or just sits there.
Groundwork Construction Co. of The Hammocks is an independent service provider, not affiliated with KraftMaid. We build to KraftMaid’s cabinet specs, source the right series for your layout, and pull the permits. KraftMaid still manufactures the cabinetry; we handle everything around it.
Key Takeaways
- An addition in The Hammocks runs $45,000 to $130,000 installed; an ADU runs $90,000 to $220,000.
- KraftMaid compatibility depends on door series, cabinet depth, and finish, not just the look.
- We source KraftMaid through authorized channels and match the series to your addition’s layout.
- Every project is covered by our 730-Day Done Right Promise.
- Call (844) 761-9356 for a free estimate and design consult.
Which KraftMaid Models This Applies To
KraftMaid doesn’t sell cabinets as a single model line, and that trips up a lot of owners who assume “KraftMaid” means one thing. It’s a family of door styles and series, each with its own box construction, depth options, and finish system. If you’re matching new cabinetry to what you already have in The Hammocks, the door and drawer front is your first identifier. Look inside a cabinet door for the manufacturer label, then check the door’s edge profile and the drawer box joinery. KraftMaid’s all-plywood and particleboard box lines look similar from the outside and very different inside.
Height and depth matter more than most people expect. Standard base cabinets are 24 inches deep, but KraftMaid offers 12- and 15-inch depth options for islands and pantries, and getting that wrong means your addition’s footprint changes. The finish matters too; KraftMaid’s painted and stained finishes need to match across the batch, and finishes from different production runs can vary slightly. We order all cabinetry for a project together so the tone matches.
On the OEM-versus-aftermarket question, we recommend genuine KraftMaid cabinetry for the cabinet boxes and doors, since the box is what carries the weight and the warranty. Hardware, glides, and drawer pulls can be quality aftermarket equivalents without any issue, and that keeps costs honest. If you’re also doing countertops, we work with Cambria and Silestone; for fixtures, Kohler. Mixing brands isn’t a problem as long as the sizing and finish strategy is planned up front.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Home Additions & ADU Is Failing
An addition or ADU itself rarely “fails” in the way a part does. What fails is the planning around the cabinetry, or the cabinetry gets installed into a space that wasn’t ready for it. Here’s what we see when we walk a The Hammocks home that’s stuck mid-project or has an addition that never worked right.
- Cabinets that don’t close flush or sit out of square. This usually means the wall behind them wasn’t built to tolerance before install. KraftMaid boxes are square from the factory, so if the doors won’t sit right, the framing or the floor is the culprit.
- Finish separation at the joints. In South Florida humidity, cheap installation in an unconditioned addition causes paint and stain to separate where panels meet. KraftMaid finishes hold up when the space is properly conditioned; they fail when it isn’t.
- Drawers that bind after a season. That’s almost always a humidity and shimming issue, not a KraftMaid defect. The drawer box was level when installed and the floor moved.
- A converted garage or ADU with sagging shelves and no ventilation. If the space was never properly insulated and conditioned, the cabinetry takes the hit. This is the single most common reason a The Hammocks ADU cabinet install goes bad.
- Permit problems surfacing at resale. An addition or ADU built without proper permits in The Hammocks can’t be counted in the home’s square footage, which is why the county inspection record matters before you add a single cabinet.
Replacement Cost & What’s Included
A home addition in The Hammocks runs $45,000 to $130,000 installed, and a standalone ADU runs $90,000 to $220,000. A garage conversion sits in the middle at $30,000 to $80,000. Those numbers include the structure, the KraftMaid cabinetry, and the finish work, and here’s how they break down.
| Scope | Installed Range (The Hammocks) |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
| Cabinet Installation (KraftMaid) | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
What drives the range: the size and footprint of the addition, whether it needs a new foundation, roof tie-in, and electrical and plumbing runs, the KraftMaid door series and depth mix, and the finish level you choose. We give you an upfront written estimate with line items, so you see exactly where the money goes. No surprises. Every project carries our 730-Day Done Right Promise, and if something isn’t right, we come back and make it right. The number you see on the estimate is the number you pay on the invoice.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
A homeowner in The Hammocks can safely handle some of the planning side: measuring the room, sketching layout ideas, checking that the door will clear the swing, and confirming the electrical panel can handle the new circuit. That’s useful work. What you shouldn’t do is run the addition or ADU build yourself, and that’s not because we want the job. It’s because framing, permits, and electrical in The Hammocks require a licensed contractor and county inspection, and a failed inspection on an addition means tearing back finished work. Cabinetry is heavy and needs level floors and square walls before it goes up; a KraftMaid box installed onto an out-of-level surface will fail at the doors within a year.
We’ll be straight with you: if the addition is already framed and permitted, we can step in for the cabinetry and finish work. If it’s not, we handle the whole scope from foundation to finish line. Either way, call (844) 761-9356 and we’ll tell you what’s worth doing and what isn’t. A live person answers, 24/7, and the estimate is free.
FAQs
KraftMaid cabinetry lasts 20 to 30 years or more when the addition is properly conditioned and the cabinets are installed level and square. In South Florida humidity, the failure point is almost always the space, not the cabinet: an unconditioned garage conversion or a leaky ADU wall will shorten cabinet life quickly. If your addition stays dry and air-conditioned, the KraftMaid boxes and doors hold up for the long haul. Call us for a walkthrough if you’re not sure your space is ready.
Sometimes. If the structure and permits are sound and the issue is the cabinetry or the finish, a repair and cabinet replacement is the right call. If the addition was built without permits or the framing is out of square, a rebuild is the honest answer. We’ll evaluate the structure before quoting anything, and we tell you which side of that line you’re on.
A cabinet replacement in an existing addition typically takes 2 to 5 days; a full addition or ADU build takes several weeks to a few months depending on scope and permitting. The permit timeline in The Hammocks is the variable nobody controls, so we plan around it and keep you updated. We don’t promise same-day on planned construction, because nobody builds an addition in a day.
We source KraftMaid cabinetry through authorized channels, matched to the door series, depth, and finish your addition needs. We order everything for a project together so the finish tone matches, and we confirm the series against your existing cabinets if you’re adding to them. We don’t claim to stock KraftMaid parts locally or carry them on a truck, and we tell you the lead time upfront so there are no surprises. Call (844) 761-9356 to talk through your layout and get a free estimate.
Why The Hammocks Homeowners Call Groundwork
The Hammocks is a community where additions and ADUs are common, and the homeowners we work with have usually been through a project before. They’ve seen vague bids, crews that disappear, and warranty language that means nothing. We answer the phone with a live person 24/7, we send background-checked uniformed technicians on every job, and we back the work with the 730-Day Done Right Promise. From foundation to finish line, one contractor, one written estimate, one accountable team. We’ve been serving local communities for over 42 years, and our technicians have up to 12 years of experience. Every project is built to last and backed in writing.
If your addition or ADU is stalled, or you’re planning one and want KraftMaid cabinetry that fits the space right the first time, call (844) 761-9356 to schedule your free estimate and design consult. We’ll bring the numbers, the plan, and the honest assessment. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.
Written by the team at Groundwork Construction Co. of The Hammocks, serving The Hammocks and nearby areas.