Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Kohler Home Additions & ADU: The The Hammocks Owner’s Guide
We build Kohler-appointed home additions and ADUs in The Hammocks, and the all-in price for a ground-level addition here typically lands between $45,000 and $130,000 depending on square footage, foundation work, and finish level. The first thing most owners notice is that the new roofline doesn’t meet the existing one cleanly, or that the tub and shower fixtures in a new ADU bath are running on undersized lines. In The Hammocks, where most lots sit on the same shallow water table and limestone shelf, that early roof and drainage detail is where additions get expensive if it’s rushed.
We’re an independent builder, not affiliated with Kohler. We install Kohler plumbing and bath fixtures inside the work we build, and we hold the same standard for KraftMaid, Cambria, and Silestone when a project calls for them.
Which Kohler Models This Applies To
Kohler products come into an addition in two places: the bath (toilets, tubs, shower valves) and the kitchen (sinks and faucets). Model identification matters most for rough-in dimensions. Kohler’s Santa Rosa and San Souci one-piece toilets both use a 12-inch rough-in, but the San Souci’s tank sits closer to the wall, which matters in the tight half-bath layouts that show up in The Hammocks additions. If you’re matching a Kohler shower valve to an existing wall, measure from the finished wall face to the valve center: Kohler’s standard is 2-3/4 inches, and a renovation that moves the wall out with tile will throw that off by half an inch or more.
The labels live inside the tank lid, on the faucet escutcheon underside, or cast into the fixture near the drain. Photograph that label before we order. OEM Kohler replacement parts are the safe call for anything that seals or carries water; quality aftermarket equivalents are fine for trim and accessories where the fit is forgiving. On additions, we generally spec Kohler for the parts you’ll touch daily and let the tolerances elsewhere be standard.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Kohler Home Additions & ADU Is Failing
Most of these surface during the first wet season, which in South Florida means a hard test.
- Water puddling at the new-to-old roofline. The transition flashing was lapped wrong or didn’t account for the existing roof pitch. This is the number one addition failure we get called back on in The Hammocks.
- A Kohler tub or shower draining slow from day one. The drain line under a new slab went in with a shallow slope. Once the slab cures you can’t fix it without cutting, so it has to be right the first time.
- Hairline cracks at the wall seam between the addition and the original house. Usually differential settlement on soil that wasn’t compacted properly before the footing went down. Limestone-and-sand here settles unevenly if it’s rushed.
- Musty smell in the new ADU bath. The exhaust vent terminates in the attic instead of through the roof. Florida humidity finds that fast, and the fixture isn’t the problem.
- Doors in the addition that stick in summer and free in winter. Humidity swings on an unconditioned or under-insulated wall assembly. Sometimes framing, sometimes a gap in the building envelope.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s what the work actually runs in The Hammocks, with pricing on the full scope rather than a single part:
- Home addition: $45,000 – $130,000
- ADU construction: $90,000 – $220,000
- Garage conversion: $30,000 – $80,000
What drives the range: square footage, foundation type, roof tie-in complexity, and whether the addition includes a Kohler-appointed full bath. A 400-square-foot guest addition with a three-quarter bath sits near the bottom; a 600-square-foot ADU with a full Kohler kitchen and bath runs higher. Our bids are line-item, upfront, and they don’t move once the contract is signed. Every project carries the 730-Day Done Right Promise, and we pull the permits and see the inspections through.
DIY or Call Us?
You can safely check a few things yourself: photograph the Kohler label, measure the rough-in on an existing fixture, watch for water at the roof transition after a hard rain, and note which doors stick. That information saves us diagnostic time and you money.
Where DIY goes wrong on additions is almost anything structural or envelope-related. Roofline flashing, footing, slab work, and rough plumbing under a new floor aren’t homeowner jobs, and a bad detail here fails silently for a season and then costs double to correct. ADU construction in particular involves permitted structure that has to pass inspection, and the shortfall is on you if it doesn’t. Call (844) 761-9356 for a free estimate and design consult, and we’ll tell you honestly what’s a repair and what needs rebuild. Live person, 24/7.
FAQs
How long does a Kohler-appointed ADU take to build in The Hammocks? A typical ADU here runs four to seven months from permit to final walkthrough, depending on size and whether a Kohler full bath is part of the plan. Site work and concrete pour are the slow parts; finish-out moves quickly. Call (844) 761-9356 for a realistic timeline on your lot.
Can I repair an addition instead of rebuilding it? Often yes, if the failure is localized: flashing at the roof transition, an exhaust that needs re-routing, or a door that needs re-hanging. Once the problem runs into the foundation, rough plumbing, or the building envelope of a permitted structure, repair usually costs more than doing it right the second time. We’ll give you a straight answer either way.
Will the price change once work starts? No. Our quotes are upfront and line-item, and the number you see is the number you pay. The only way a price moves is if you request a change to the scope, and that gets priced and approved in writing before we touch it.
How do you source the Kohler fixtures for the addition? We order directly from Kohler-approved distribution, matched to the model and finish you select, and we confirm rough-in dimensions against the drawings before the walls go up. We don’t carry stock on a truck, so everything is ordered per job. Call (844) 761-9356 to start your free estimate.
Written by the team at Groundwork Construction Co. of The Hammocks, serving The Hammocks and nearby areas.