Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Kitchen Remodeling: The The Hammocks Owner’s Guide
We install IKO-compatible kitchen remodeling packages throughout The Hammocks, with full kitchen projects typically landing between $14,000 and $45,000 depending on cabinet layout, countertop selection and whether the footprint changes. In a town where humidity sits high most of the year and afternoon storms push water against west-facing walls, the failures that matter are rarely cosmetic. You usually find out something’s wrong when a cabinet run swells at the base after a summer of moisture, when a countertop seam lifts near the sink, or when a wall behind the backsplash feels soft to the touch. That’s the moment most The Hammocks owners start calling, and it’s the right moment.
Which IKO Models This Applies To
IKO is a brand most homeowners know from roofing shingles, so the first thing worth clearing up: when a The Hammocks homeowner tells us their kitchen has an “IKO system,” we walk the room and identify what’s actually there – cabinetry, underlayment panels, moisture barriers, or a mix. IKO’s building-product catalog overlaps with kitchen construction in moisture-control and underlayment materials, and those matter enormously in South Florida. Identification starts with two things: the label or stamp on the back panel of a cabinet run (if reachable without dismantling) and measured cabinet dimensions. Standard base cabinets run 24 inches deep and 34.5 inches high; standards shift slightly by series, so measure twice before you order anything.
On the OEM-versus-aftermarket decision, our honest position for The Hammocks: for moisture-barrier and underlayment products, matching the original brand spec matters because Florida’s climate punishes shortcuts. For cabinet hardware, drawer slides and trim, a quality aftermarket equivalent from a name like KraftMaid or a comparable line is often the smarter spend, and we’ll tell you which is which on your estimate. We don’t keep parts in inventory and we don’t carry them on a truck – we source to your project. Groundwork Construction Co. of The Hammocks is an independent service provider and is not affiliated with IKO.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Kitchen Remodeling Is Failing
- Cabinet bases swelling or delaminating. The particleboard or MDF core absorbs ambient humidity when the moisture barrier behind or under the cabinet run has failed. In The Hammocks, west-facing kitchen walls take the worst of it during the June-through-September storm season.
- Countertop seams lifting near the sink or dishwasher. Water intrusion at the seam breaks the adhesive bond over time. If you can slide a fingernail into the gap, the seal is already gone and the substrate below is likely wet.
- Backsplash tile popping or grout cracking in a straight line. A straight-line crack usually tracks a stud or a panel joint that’s moving – either the backing wasn’t fastened to spec or moisture has softened it.
- Soft spots in the wall behind the range or sink. Press firmly with a screwdriver handle; if it gives, the drywall or underlayment has absorbed water and needs to come out, not be painted over.
- Persistent musty smell that returns after cleaning. That’s a moisture problem inside the wall cavity or cabinet base, not a surface issue. Air freshener won’t fix it and neither will another coat of paint.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Installed costs for IKO-compatible kitchen remodeling in The Hammocks run in these ranges, and every quote we write is line-item so you can see where the money goes:
- Full kitchen remodel: $14,000 – $45,000
- Small kitchen remodel: $9,000 – $20,000
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Backsplash installation: $800 – $2,500
- Kitchen island installation: $3,000 – $10,000
What drives the range: cabinet count and box construction, countertop material (Cambria and Silestone sit higher than laminate), whether plumbing or electrical has to move, and how much moisture damage we uncover once the old surfaces come off. Our pricing is upfront – the number you see is the number you pay, no change orders for surprises we should have caught. Every project carries our 730-Day Done Right Promise. If it’s not done right, we make it right, and that’s in writing.
DIY or Call Us?
There’s real value in what a homeowner can check safely: press for soft spots, look for seam gaps, test cabinet doors for sag, and photograph everything before anyone touches it. That information makes your estimate sharper. Where DIY goes wrong on this work is the removal stage. Pulling a cabinet run or prying a countertop off can open a water-damaged wall, disturb plumbing connections, or expose mold that needs proper handling – and in The Hammocks, a kitchen opened up during storm season can’t sit half-finished while you wait on the right part.
We also see homeowners buy the wrong-spec replacement panel because the label was unreadable, then eat the cost. Our technicians have up to 12 years of experience reading these systems and sourcing the right match. If you’re unsure, call (844) 761-9356 – a live person answers 24/7, and estimates are free.
FAQs
A properly installed moisture barrier and cabinet system should hold 15 to 20 years in South Florida’s climate – but only if the original installation accounted for humidity. We regularly see failures at the 6-to-10-year mark in The Hammocks when the barrier was undersized or the wall wasn’t sealed correctly. Call (844) 761-9356 for a free assessment.
Sometimes, yes. If the damage is limited to one cabinet run or a single countertop seam, a targeted repair is often the right call and costs a fraction of a full remodel. If the moisture has spread into the wall cavity, a partial replacement just moves the problem. We’ll tell you honestly which one you’re looking at.
A small kitchen remodel typically runs 1 to 2 weeks; a full kitchen with new cabinets, countertops and backsplash runs 3 to 5 weeks. Cabinet-only installation is often completed in a single visit. Schedule depends on material lead times – Silestone and Cambria countertops are fabricated to order, so we build that into the timeline upfront.
We identify the existing spec by label, measurement and on-site inspection, then source from a verified supplier – not from a truck. That’s why we ask for photos or a walkthrough before quoting. Groundwork also works with KraftMaid, Cambria and Silestone for cabinet and countertop replacements. Call (844) 761-9356 to schedule your free estimate.
Written by the team at Groundwork Construction Co. of The Hammocks, serving The Hammocks and nearby areas.