A Groundwork company - serving The Hammocks, FL
ADU Site Prep & Utilities in Kendall, FL | Groundwork Construction Co. of The Hammocks

ADU Site Prep & Utilities in Kendall - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Kendall, FL: What It Covers and What It Costs

ADU site prep & utilities in Kendall runs $45,000 – $130,000 for the sitework and service-connection portion of a detached unit, and typical schedules land between 6 and 14 weeks before framing starts. That number covers clearing and grading, the utility trench network, electrical service, water and sewer tie-ins, and the inspections that clear the way for the building itself. Call (844) 761-9356 for a free on-site estimate and a written, line-item scope.

Call (844) 761-9356

How We Sequence a Kendall Site Prep & Utilities Job

Site prep is not a vague “we handle everything” phase. It follows a fixed order, and each stage has a decision the homeowner has to make before we move on.

Stage 1: Survey, locate and utility verification (days 1 – 3)

Before anything gets cut, we confirm the buildable footprint against the survey, call in Sunshine 811 for locates on existing gas, fiber, water and electric, and verify where the sewer lateral actually runs. On a Kendall lot that already has a CBS house on it, the lateral is rarely where the drawings show. At this stage you decide the final pad position and how much driveway you want to keep. If the site needs a county tree permit or drainage review, that gets flagged here, not later.

Stage 2: Demolition and clearing (days 3 – 7)

We strip existing pavers, remove the concrete slab or shed footer, and pull out old fencing and landscaping in the footprint. Whatever material comes out gets hauled, not pushed into a corner of the yard. You confirm what stays (a mature mango tree, an existing utility meter pedestal) at the walkthrough on day 3, because moving something after grading starts means rework.

Stage 3: Grading and pad preparation (days 7 – 14)

Kendall’s flat, high-water-table lots need the pad built up and compacted correctly so drainage runs away from the existing house and the new unit. We rough-grade, excavate for the foundation and set the utility trench depth. This is where you decide the finished slab elevation and whether the unit gets a small stoop or a flush entry.

Stage 4: Utility trenching and rough-in (days 14 – 35)

Electrical, water and sewer lines go in the ground and get inspected before backfill. On most Kendall jobs this is where the schedule flexes, because the county inspection slot and the meter release don’t always land when you want them. We schedule the utility trench inspection in week two so backfill and grading can proceed in parallel. You decide panel amperage here: a 100-amp subpanel covers a small one-bedroom, a 125-amp or 150-amp feed is the safer call if the unit will run a heat pump and an EV charger.

Stage 5: Backfill, final grade and inspections (days 35 – 49)

Backfill gets compacted in lifts, the trench is closed, and the site is dressed back to grade. Final site and utility inspections are called, and you get a copy of the signed-off permits. Structural work on the unit itself starts only after this clears.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on This Job

  • Utility route – routing new trench along the fence line is cheaper and shorter than pulling a fresh line under an existing driveway. Under-slab crossing leaks into five-figure rework, so we only recommend it when there’s no alternative.
  • Electrical service – a meter pedestal at the property edge (faster, simpler to service) versus a subpanel fed from the house (cheaper normally, but adds load to an older panel).
  • Sewer tie-in – a gravity lateral where the grade allows it versus a grinder pump and lift station where it doesn’t. Grinders add roughly $4,000 – $9,000 and need periodic service, but they beat a re-graded lot.
  • Site drainage – French drain and swale versus a shallow dry well. On a Kendall lot after a summer downpour, this is the single biggest quality-of-life decision.
  • Pad finish – poured concrete versus pavers. Pavers cost more upfront but are easier to open for utility service later, and they hold up in Miami-Dade humidity.
  • Water service – a dedicated meter (meter set fee + monthly base charge) versus a sub-meter fed off the house main.

Silestone and Caesarstone aren’t part of the sitework, but if this unit is going to be a rental with a small kitchen, we’ll spec the same surfaces we use on a Small & Partial Kitchen Remodels in Kendall job so the ADU matches the main house. Kohler and Moen fixtures get ordered at the design stage, not during rough-in.

What ADU Site Prep & Utilities Costs in Kendall, FL

The sitework and utility portion of a detached ADU in Kendall runs $45,000 – $130,000. That is the number to budget for this phase only. The full unit, including the building, lands in the $90,000 – $220,000 range you’ll see quoted for ADU construction. Four variables push a job toward the low or high end:

  • Lot condition – a clean lot with easy access to a fence-line trench sits near $45,000. An over-improved lot with pavers, mature trees and a pool enclosure in the way can push the sitework alone past $80,000.
  • Utility distance – the length of the run from the meter and sewer tap to the pad. Every extra 25 feet of trench, conduit and wire adds cost.
  • Upgrades needed – a 100-amp feed off an existing 200-amp service is cheap. A service upgrade, a grinder pump or a new meter set adds real dollars.
  • Permit scope – Miami-Dade County sitework, drainage and utility permits, plus the inspections that go with each, are bundled into the written estimate. If a drainage plan review is required, expect a slower schedule.

Our written estimate lists every line: excavation, trenching, conduit, meter, tie-in, inspection fees and haul-away, with no change orders on work we scoped. Home Additions & ADU in Kendall pulls this phase into the bigger build so one contract covers sitework through finish. Call (844) 761-9356 for a free estimate – the pricing is upfront and fixed.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Kendall Lots Specifically Do to a Sitework Job

Kendall is a hard-built, fully developed corner of unincorporated Miami-Dade west of the Turnpike, and that changes this job more than the ADU itself. Nearly every site is an already-improved 1970s-to-1990s CBS lot with a barrel-tile or shingle roof, so the work starts with demolition, utility relocation and drainage, not a clean green build. Miami-Dade County permitting and NOA product-approval compliance drive the schedule as much as the excavator does: every utility component, conduit and drainage fitting that carries a HVHZ product approval has to match the paperwork. The flat lots and high water table near the canal-adjacent tract streets make drainage design non-negotiable, and the subtropical downpours that roll through most summer afternoons will find any low spot we leave. In the Kendall tract neighborhoods, after a tropical storm or a bad microburst, we see grade erosion and flooded trench lines where the prior drainage was never sized correctly. We pull the county permits and carry the approvals so the inspection punch list stays short.

Serving Kendall, FL – Our Local Coverage Area

We serve Kendall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Kendall

Get a Free Kendall Site Prep Estimate

Every Kendall site prep & utilities estimate starts with a free on-site visit: we walk the lot, verify the utilities, look at drainage and give you a line-item number in writing. Our live team answers 24/7, our technicians are background-checked and arrive in uniform, and the number we quote is the number you pay. If this is one phase of a bigger project, our Home Additions & ADU team can scope the whole build, and homeowners often pair this with a Full Bathroom Remodeling in Kendall once the unit is up. Call (844) 761-9356 to schedule your free estimate.

Written by the team at Groundwork Construction Co.

Why Kendall Chooses Groundwork Construction Co. of The Hammocks

We set the standard for ADU site prep & utilities in Kendall.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Kendall

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Kendall Customers Say

Trusted by homeowners across Kendall and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for ADU Site Prep & Utilities in Kendall?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Kendall.

(844) 761-9356

Request a Free Estimate in Kendall

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch