Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat Is the First Step in a Kitchen Remodel in The Hammocks, FL?
The first step in a kitchen remodel is pulling your home’s original building permit record and confirming what’s actually inside your walls – not choosing a design or a contractor. For a 1990s concrete-block home in The Hammocks, that free public-records check tells you what was originally permitted, what a previous owner may have changed without a permit, and which walls are structural. Get that right and the rest of the project gets cheaper; skip it and demo day becomes the most expensive day of the job. Call (844) 761-9356 if you’d rather have someone walk the kitchen with you first – estimates are free.
Why the Permit Record Comes Before the Design Board
Almost every home in The Hammocks went up during a single master-planned tract build from the 1980s through the 2000s. That means most kitchens here are 20 to 35 years old and have usually changed hands two or three times since the original sale. Each owner is a chance for an unpermitted cabinet swap, a moved range, a laundry-to-pantry conversion, or a dishwasher circuit that was never inspected. The original as-builts describe the house as it left the builder – not the house you bought.
You can see all of it yourself, free, in about 15 minutes. Miami-Dade County’s online permitting portal lets you search by address or folio number. Pull two things: the original building permit and certificate of occupancy for the home, which show the footprint, the plumbing rough-in, and the electrical layout as permitted; then scan for any later permits filed at your address. A kitchen is the most-modified room in a tract home, so a gap of a decade or two with nothing filed is worth a second look before demo.
What you’re really hunting for:
- Original electrical service and kitchen circuits – a 1990s kitchen typically had one dedicated circuit for the fridge, one for the range (electric or gas), and a couple of small-appliance circuits. A modern kitchen with an island cooktop, wine fridge, and wall oven usually needs more.
- Plumbing rough-in location – moving a sink is straightforward; relocating a drain line through a slab-on-grade CBS floor is a different budget entirely.
- Permit history gaps – an unpermitted addition, wall removal, or garage conversion is common and always cheaper to discover before you sign anything.
- Footprint and set-backs – matters if the remodel grows into an adjacent laundry or lanai.
Non-Load-Bearing Wall or Concrete Block Bearing Wall?
This is the single most expensive question in a Hammocks kitchen remodel, and it’s the one most homeowners answer wrong. Nearly every single-family home here is CBS construction – concrete block and stucco – which means many interior walls are block, not drywall over studs.
A non-load-bearing partition wall (often a wood-stud or light metal-stud wall) can usually come down to open the plan to the living room or dining room. A concrete-block bearing wall carries roof or floor load. Touching one without engineer sign-off is how a $30,000 kitchen turns into a structural repair project that reshapes the whole budget. So before you sketch an open-plan layout, tap the wall, look at the permit drawings, and have a licensed structural engineer or contractor confirm which walls are which. Do not assume the wall between your kitchen and dining room is optional just because a neighbor opened theirs – tract homes in a uniform subdivision often have several different floor plans, and the wall configuration can vary block to block.
That’s also why a site walk beats a phone estimate every time. Groundwork Construction Co. of The Hammocks starts every kitchen project with a walk-through of the existing space and the permit file, not just a square-footage quote over the phone. Our technicians have up to 12 years of experience reading exactly this kind of second-generation CBS home, and the walk is where scope gets anchored to what’s actually standing there.
Scope Before Style: Why Counters and Cabinets Come Third
Countertop material, cabinet brand, tile, and hardware all matter – but none of them mean anything until the scope is defined and priced. If the scope is soft, the materials are a guess. Groundwork’s Kitchen Remodeling process starts by building a fixed scope document: what’s staying, what’s being replaced, what trades are involved, and what the permit requires. That document is what protects you from the change-order creep and vague bids that sink a lot of kitchen projects.
Once the scope is locked, materials become a real decision instead of a guess. Our curated brand partners – Kitchen Remodeling in The Hammocks uses KraftMaid and Wellborn cabinetry, Cambria and other premium quartz surfaces – mean you’re choosing from vetted options that hold up to South Florida’s humidity, not just whatever a supply house happens to have in stock.
You can see how scope-first pricing looks in real numbers. These are the ranges we work from in The Hammocks; the fixed-scope figure you get after the site walk will land inside them, not wander outside.
| Kitchen project type | Typical range in The Hammocks |
|---|---|
| Full kitchen remodel (CBS home) | $14,000-$45,000 |
| Small kitchen remodel | $9,000-$20,000 |
| Cabinet installation | $4,000-$13,000 |
| Countertop installation | $2,000-$6,500 |
| Backsplash installation | $800-$2,500 |
| Kitchen island installation | $3,000-$10,000 |
Upfront pricing means the number you see is the number you pay – and standing offers like 0% financing for 18 months plus $1,000 off projects over $10,000 make a full-scale kitchen accessible without surprise add-ons. Pair that with the 730-Day Done Right Promise and the guarantee only makes sense if the pre-construction discovery was done carefully. A contractor who hasn’t walked the house and read the file has nothing real to promise.
What About Miami-Dade Permits for a Kitchen Remodel?
In Miami-Dade’s High-Velocity Hurricane Zone, any kitchen remodel that touches electrical, plumbing, or structural elements requires a permit pulled before work begins – and almost every real remodel touches at least one of those. The county enforces product approvals for wind resistance, and inspectors check the rough-in before the walls close up. Skip the permit and three problems arrive later: your homeowner’s insurance can decline a claim tied to unpermitted work, resale can stall when a buyer’s inspector flags the file, and title issues can surface at closing. A permit costs a fraction of what an unpermitted discovery costs downstream.
What is the first step in a kitchen remodel if I already have a design?
A design still starts with the permit record and a structural check, because the drawing may show walls coming down that Miami-Dade code won’t allow without engineer sign-off. Send us the design and we’ll reconcile it against the as-builts and existing conditions on a site walk before estimating. That reconciliation is free with the estimate.
How much does a kitchen remodel cost in The Hammocks?
Most full kitchen remodels in The Hammocks land between $14,000 and $45,000; small kitchens run $9,000-$20,000. The figure that matters is the fixed-scope number after a site walk, not a range pulled from a website. Call (844) 761-9356 for a free upfront quote.
Can you find my original permit record for me?
Yes. We pull the original permit and any later filings as part of pre-construction at no charge. If the record is missing or incomplete – common in Hammocks homes built through the 1990s – we verify existing electrical, plumbing, and structure on site so the scope isn’t based on records that don’t match the house. Live people answer 24/7.
Why does Groundwork do a site walk instead of a quick phone estimate?
Because a phone estimate can’t see a concrete-block bearing wall or an unpermitted modification buried behind drywall. Our walk-through, the permit check, and the 730-Day Done Right Promise are all part of the same commitment: we don’t promise workmanship we haven’t scoped against what’s actually there.
The Builder’s Answer, In Short
Before a single cabinet is ordered in The Hammocks, the work starts with the files and the walls: pull the permit record, confirm which walls are structural CBS, and lock a fixed scope. Everything else in your kitchen – the KraftMaid cabinetry, the Cambria counters, the finish detail – is downstream of that. Our technicians have up to 12 years of experience with second-generation CBS homes, and we answer the phone live around the clock.
If you’d rather have it looked at, Groundwork Construction Co. of The Hammocks offers a no-pressure assessment in The Hammocks – call (844) 761-9356 for a free estimate and design consult. Upfront pricing, no surprises.
Written by the team at Groundwork Construction Co. of The Hammocks, serving The Hammocks, FL.