A Groundwork company - serving The Hammocks, FL
Garage Conversion ADU in West Perrine, FL | Groundwork Construction Co. of The Hammocks

Garage Conversion ADU in West Perrine - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in West Perrine, FL: Cost, Timing, and What’s Actually Involved

A Garage Conversion ADU in West Perrine typically runs $45,000 – $130,000 and takes about 3 to 5 months from permit submission to final inspection. The work turns an existing attached or detached garage into a legal, permitted living unit: new slab or floor system, framed walls, insulation, plumbing, electrical, HVAC, kitchenette, full bath, and a separate entrance. Call (844) 761-9356 for a free on-site estimate before you commit to a scope.

Call (844) 761-9356

How a Garage Conversion ADU Comes Together, Stage by Stage

Garage conversions fail or succeed on the first two weeks. Here’s the real sequence we run, and what you’re deciding at each step.

Stage 1: As-built survey and feasibility (week 1)

Before anything gets demoed, we measure the existing garage, document the slab condition, and check what’s inside the walls. In West Perrine’s older concrete-block homes, that often means confirming whether the garage was ever permitted and whether original aluminum wiring runs through it. You decide the layout here: studio versus one-bedroom, where the bath sits, and whether the garage door opening gets framed in with a window wall or a standard door and stucco. This is also when we confirm setback and lot-coverage numbers against county records.

Stage 2: Permit submission and plan review (weeks 2 – 8)

We prepare and submit the drawings and pull the permits. Miami-Dade review timelines move around, and garages near the urban development boundary can draw extra scrutiny, so we build real calendar days into the schedule instead of promising a date we can’t hold. You’ll sign off on the final plan set before submission. Nothing gets built until the permit is in hand.

Stage 3: Demo, slab, and framing (weeks 8 – 12)

Out comes the garage door, the old opener hardware, and any shelving or storage. The floor gets addressed next: sometimes the existing slab is fine with a topping pour, sometimes it needs a new vapor barrier and pour. Then framing goes up for the new interior walls, the bath, and the closet. This is the loudest, dustiest stretch, and it’s when your floor-plan decisions become permanent.

Stage 4: Rough-ins and inspections (weeks 12 – 16)

Electrical, plumbing, and HVAC rough-in happen together so the trades aren’t cutting into each other’s work. If the garage shares a wall with the house, we tie mechanical systems in carefully and seal the assembly against moisture. The county inspects framing and rough-ins before any drywall goes up. You decide fixture locations and outlet placement during this window, not after.

Stage 5: Finishes, final inspection, and handover (weeks 16 – 20)

Insulation, drywall, paint, flooring, the kitchenette, the bath tile, and the exterior stucco patch all land in this stretch. Final inspection closes the permit, and we walk the unit with you. Anything that isn’t right gets fixed under the 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between for a Garage Conversion ADU

Most of the money and most of the arguments live in these decisions. Here’s the honest breakdown.

  • Studio versus one-bedroom layout: A studio keeps the cost near the $45,000 floor because it avoids a second set of walls and a second door. A one-bedroom adds framing, a closet, and often a corridor, pushing you toward the middle of the range. Studios suit rental income; one-bedrooms suit family.
  • Floor system: Topping the existing slab is the cheapest path. A new poured slab with proper vapor barrier costs more but solves the moisture problems common in shallow-slab West Perrine garages. It’s the difference between a floor that stays flat and one that cups within two summers.
  • Kitchenette countertops: A compact quartz or granite surface from Silestone or Caesarstone holds up to a renter’s abuse and cleans easily; laminate will save you a few thousand but shows wear fast. We spec quartz on most units.
  • Bath fixtures: Kohler and Moen fixtures sit at a sensible middle ground: durable, serviceable, easy to replace cartridges years from now. Bargain-brand faucets cost less upfront and get swapped within five years.
  • Windows and the old garage opening: Impact-rated windows and doors cost more but meet Florida Product Approval and cut your insurance. Framing the old overhead opening with an impact slider is a common move.
  • HVAC approach: A dedicated mini-split keeps the unit independent and metered separately. Tying into the house system costs less but blurs the utility split if you’re renting.

What a Garage Conversion ADU Costs in West Perrine, FL

Plan on $45,000 – $130,000 for a permitted garage conversion in West Perrine. The low end is a simple studio with a topped slab, one mini-split, and laminate. The high end is a one-bedroom with a new slab, full kitchen, upgraded finishes, and impact glazing throughout.

The variables that move the number:

  • Size of the garage: A single-car bay tops out near 250 square feet; a double converts to a comfortable one-bedroom. Every additional square foot adds framing, drywall, flooring, and finishes.
  • Existing condition: Original aluminum wiring, an unpermitted prior addition, or a cracked slab all add scope. Legalizing what’s there before building on it is often the single biggest cost swing.
  • Moving plumbing and structure: Keeping the new bath near the house’s existing drain stack saves thousands. Pushing it to the far corner of the garage means trenching and new drain runs.
  • Material grade: Quartz counters and tile showers sit at the top; laminate and a pre-fab shower pan sit at the bottom. The spread is real, roughly $15,000 – $25,000 between entry and premium finishes.
  • Permit scope: A full conversion with electrical, plumbing, and structural permits costs more in fees and inspection cycles than a cosmetic build-out. It also protects resale value.

Our written estimates are line-item, so you see exactly what’s included: demo, permits, framing, MEP rough-ins, insulation, drywall, finishes, and cleanup. What typically isn’t included: furniture, appliances beyond the kitchenette, landscaping repair, and any work needed to legalize an unpermitted prior structure. The number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What West Perrine Homes Specifically Do to This Job

West Perrine (ZIP 33157) sits at the high point of Miami-Dade’s limestone ridge, just west of the urban development boundary. That location matters on a garage conversion in two ways. First, the ground is rock-hard oolitic limestone, so any new slab or trenching for a relocated drain has to be chipped rather than dug, which adds labor time and cost. Second, county permitting treats work near the EDB as sensitive, so plan review can run longer than in neighborhoods closer to the coast.

The housing stock adds its own wrinkles. Most homes here were built between the 1950s and 1980s in concrete block with barrel-tile or shingle roofs, and many carry original aluminum wiring, shallow slabs, and add-on rooms built without permits. We open with an as-built survey and plan for legalization where it’s needed. If the garage shares a wall with the house, roof-to-wall connections matter too: inspectors and wind-mitigation crews look for straps that were nailed instead of wrapped, and that detail affects how we tie the new assembly in. The May-through-October rainy season shapes the schedule as well, since daily afternoon downpours push exterior stucco and painting work to mornings. Moisture control inside the enclosed assembly is critical here; we plan for mold risk from day one. When the wider project involves more than the garage, it’s part of a full Home Additions & ADU in West Perrine scope, and homeowners often pair the conversion with Cabinets & Countertops in West Perrine for the kitchenette. Our Home Additions & ADU service covers the full range of options if you’re still weighing a detached build against a conversion.

Serving West Perrine, FL – Our Local Coverage Area

We serve West Perrine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About Garage Conversion ADU in West Perrine

Get a Free Estimate for Your Garage Conversion ADU in West Perrine

We’ll walk your garage, check the slab and wiring, and put a line-item estimate in writing so you know what the job actually costs before you commit. Our technicians have up to 12 years of experience, arrive in uniform, and are background-checked. Calls are answered by a live person around the clock. If you’re ready to price the work, call (844) 761-9356 and we’ll schedule your free on-site estimate. We also cover the surrounding communities, including West Perrine, so you know we’re local to the area.

Written by the team at Groundwork Construction Co.

Why West Perrine Chooses Groundwork Construction Co. of The Hammocks

We set the standard for garage conversion ADU in West Perrine.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in West Perrine

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What West Perrine Customers Say

Trusted by homeowners across West Perrine and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Garage Conversion ADU in West Perrine?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in West Perrine.

(844) 761-9356

Request a Free Estimate in West Perrine

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch