Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Junior ADU & Interior Conversion in Westwood Lakes, FL: What It Costs and How Long It Takes
A junior ADU and interior conversion in Westwood Lakes usually runs $45,000 – $130,000 and takes 10 to 16 weeks from permit to final inspection. That range covers turning part of your existing home, often a garage, a rear room, or an underused addition, into a self-contained living space with its own entrance, kitchenette, bath, and sleeping area. The interior conversion portion is the remodel work that ties it together. Call (844) 761-9356 to schedule a free on-site estimate.
How the Work Actually Runs, Stage by Stage
We start with a walkthrough to confirm which part of the house becomes the junior ADU and where the new entry will land. You’ll decide the layout and rough unit size at this point, and we’ll flag anything structural or plumbing-related that could push the budget. Most initial visits take about 90 minutes.
Stage 1 – Planning and permit submittal (2 to 4 weeks). We draw the plan set, confirm setbacks and lot coverage, and submit to Miami-Dade County. You approve the final layout here. Nothing gets demoed until the permit is in hand, which matters in Westwood Lakes because the county scrutinizes any change to an existing CBS structure more closely than new construction on a clean lot.
Stage 2 – Demolition and rough-in (1 to 2 weeks). We remove finishes, open walls for the new plumbing, electrical, and HVAC runs, and get the framing and rough trades inspected. You don’t have to make a decision during this stage, but this is when we confirm whether the existing slab or floor will need leveling.
Stage 3 – Framing, insulation, and drywall (2 to 3 weeks). New partition walls go up, the door and window openings for the unit’s private entrance get cut, and we close the walls. You pick door style and window type before this stage starts.
Stage 4 – Finishes and systems (3 to 5 weeks). Flooring, the kitchenette, the bathroom, paint, and trim all happen here. This is where finish-grade choices (tile vs. LVP, stock vs. semi-custom cabinets) really show up in the number. You approve selections in week one of this stage, before materials are ordered.
Stage 5 – Final inspections and punch list (1 to 2 weeks). County inspections, a walkthrough with you, and a punch list. We don’t call it done until you sign off, and the work is backed by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
- Unit size and configuration: A studio layout with a sleeping alcove is the cheapest way in, often closer to the $45,000 end. A one-bedroom with a real walled bedroom pushes toward the middle of the range. Square footage is the single biggest lever on cost.
- Kitchenette grade: A compact wet bar with a sink and mini-fridge keeps the number down. A full kitchenette with a two-burner cooktop and 24-inch range requires more electrical and ventilation, and adds several thousand dollars. KraftMaid and Wellborn both offer compact cabinet lines that fit small units well.
- Bathroom build: A walk-in shower only is the most space-efficient and the most durable in a humid South Florida climate. A tub-shower combo serves families but takes floor space. Tile selection alone can swing the bathroom budget by a couple thousand dollars.
- Flooring: Luxury vinyl plank over a leveled slab is the practical pick for a converted garage or rear room, and it holds up to moisture far better than hardwood. Tile is more durable still but costs more installed and feels colder.
- Exterior finish and entry: If the junior ADU touches the exterior envelope, you’ll pick siding or stucco. James Hardie siding is a common choice on additions here because it handles sun and rain well. A separate exterior door and small stoop add cost but make the unit genuinely independent.
Homeowners often pair this work with Kitchen Design & Layout in Westwood Lakes if the main house kitchen is also getting touched, or with Small & Partial Kitchen Remodels in Westwood Lakes when the existing galley kitchen needs a modest refresh to match.
What Junior ADU & Interior Conversion Costs in Westwood Lakes, FL
Plan on $45,000 – $130,000 for a junior ADU and interior conversion in Westwood Lakes, with the typical job landing in the $70,000 – $95,000 range. Here’s a line-item view so you can see where the money goes:
| Line item | Typical range |
|---|---|
| Design, engineering, and permit fees | $3,000 – $9,000 |
| Demolition and structural modifications | $4,000 – $15,000 |
| Plumbing and electrical rough-in (new unit) | $6,000 – $18,000 |
| HVAC extension or mini-split | $3,500 – $9,000 |
| Framing, drywall, insulation | $6,000 – $16,000 |
| Kitchenette and bathroom finishes | $9,000 – $28,000 |
| Flooring, doors, trim, paint | $5,000 – $15,000 |
| Exterior entry, siding, and weatherproofing | $3,000 – $14,000 |
Four things push a job to the low or high end: unit size, the condition of the existing space (a termite-damaged or water-damaged rear room adds demo and repair), whether plumbing and electrical get relocated versus extended from existing runs, finish grade, and permit scope. A written estimate from us lists each line and what it includes. It does not cover furniture, appliances beyond the specified package, or landscaping. Upfront pricing means the number you see is the number you pay, and we offer 0% financing for 18 months plus $1,000 off projects over $10,000.
See the difference
Before
After
Before
After
Before
AfterWhat Westwood Lakes Homes Specifically Do to This Job
Westwood Lakes is built out. Nearly every project here is a renovation or conversion on a 1950s – 1970s lot, not new construction, and that changes the junior ADU job in ways you won’t hit elsewhere in Miami-Dade. The housing stock is mostly single-story concrete-block (CBS) with flat or low-pitch roofs and original terrazzo floors, and many homes still carry jalousie windows that were never designed for today’s storm intensity. After heavy summer downpours, flat-roofed CBS homes along the interior streets often show hidden water intrusion at the roof-wall junctions and window openings. We check those first before we ever open a wall, because a conversion built on a wet envelope fails fast. Post-Surfside recertification and the county’s 40-year inspection rules apply to aging CBS structures, and the low-lying land here also brings flood-zone elevation requirements into the permit conversation, so we confirm those before design is final. If the scope grows into a full addition or standalone unit, see our Home Additions & ADU in Westwood Lakes work. We cover the wider Westwood Lakes area, including the ZIP 33165 homes near Sunset, Tamiami, and Kendale Lakes.
Serving Westwood Lakes, FL – Our Local Coverage Area
We serve Westwood Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Junior ADU & Interior Conversion in Westwood Lakes
Most jobs take 10 to 16 weeks from permit approval to final inspection, plus 2 to 4 weeks for design and permitting. Jobs that require structural changes or major plumbing relocation tend toward the longer end. Call (844) 761-9356 for a timeline based on your specific home.
Yes. A junior ADU involves new plumbing, electrical, and often structural work, so Miami-Dade County requires a permit and inspections. We handle the permit submittal and coordinate the inspections for you. Skipping the permit creates problems at resale and with insurance, so it’s not a shortcut worth taking.
Often, yes, and it’s the cheapest path. If the space already has a bathroom or a nearby plumbing wall, we can extend rather than relocate, which saves thousands. Whether it’s possible depends on layout, so we confirm it during the first walkthrough before anything is committed to paper.
Plan on $45,000 – $130,000, with most jobs in the $70,000 – $95,000 range. Unit size, existing condition, finish grade, and permit scope are the big variables. Call (844) 761-9356 for an exact quote. Estimates are free and we come to you.
Every project is covered by our 730-Day Done Right Promise. If something isn’t done right, we make it right, and that’s in writing. Our technicians are background-checked and arrive in uniform, and calls are answered by a live person around the clock.
Get a Free Estimate for Junior ADU & Interior Conversion in Westwood Lakes
Call (844) 761-9356 and we’ll set up a free on-site estimate at your Westwood Lakes home. We walk the space with you, check the envelope and existing systems, confirm what’s feasible on your lot, and leave you with a written line-item quote and our Home Additions & ADU service scope in plain language. No pressure, no surprises.
Written by the team at Groundwork Construction Co.