New Detached ADU in Westwood Lakes, FL: Cost and Timeline
A new detached ADU in Westwood Lakes typically runs $45,000 – $130,000 and takes about 6 to 10 months from permit to final inspection. The unit is a separate, self-contained house on your lot: its own foundation, roof, electrical service, plumbing and entrance. Call (844) 761-9356 to schedule a free on-site estimate and find out what your specific lot will hold.
How We Build a Detached Unit Here, Stage by Stage
Every detached ADU starts with two questions we answer before anyone digs: what will Miami-Dade County approve on this lot, and how much of the process do you want to sit through. Here’s what the schedule actually looks like.
Stage 1: Site check and layout (1 – 2 weeks)
We walk the property, pull the survey, and check setbacks, easements, and how the flood zone maps onto your buildable footprint. You decide placement and size at this stage, because moving the building ten feet changes the utility runs underneath it. A site that needs fill or a raised stem wall gets priced here, not later.
Stage 2: Drawings and permits (8 – 14 weeks)
We produce construction drawings sized to the approved footprint and submit to the county. The review clock is the slowest part of the job, and it’s not something a contractor can speed up. You decide the floor plan now, because plan changes after submission restart the clock.
Stage 3: Foundation and shell (4 – 6 weeks)
Site prep, footings, slab or raised stem wall, then concrete-block walls and roof framing. You’ll pick doors, windows, and exterior finish before this stage ends so the deliveries land in order. CBS block with impact-rated openings is standard here, not an upgrade.
Stage 4: Systems and finishes (5 – 8 weeks)
Electrical, plumbing, mechanical, insulation, drywall, then finish trades. Rough inspections have to pass before walls close, so we schedule them tight. This is where your early decisions on kitchens and baths either keep the schedule or cost you a week.
Stage 5: Trim, final inspection, walkthrough (2 – 4 weeks)
Final trades, touch-ups, county final inspection, then a walkthrough with you at the unit. We hand over the warranty in writing that day. The whole sequence runs under our 730-Day Done Right Promise, so if something isn’t right after you move the unit into service, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Most of the cost swing on a detached unit comes from a handful of decisions you’ll make in the first six weeks. Here’s the honest trade-off on each.
- Footprint: studio vs. one-bedroom. A 400 sq ft studio keeps you near the low end of the range. A one-bedroom with a full kitchen pushes toward the top. Ask who will live in it before you size it, not after.
- Roof: low-pitch shingle vs. metal. Shingle is cheaper up front and holds up fine on interior streets. Metal costs more and handles heavy summer rain and sun better, which matters over a 20-year horizon.
- Openings: impact vs. standard. Impact-rated windows and doors cost more and are the right call here given hurricane season and code pressure. Therma-Tru and Mr-Glass are names we work with on doors and glazing when the spec calls for them.
- Kitchen and bath grade. A prefab vanity and standard cabinet line get the unit done; a full cabinet set and solid-surface counters look better and rent higher. This is also where homeowners often pair the job with Kitchen Design & Layout in Westwood Lakes to lock the layout before walls go up.
- Flooring. Tile throughout handles humidity and renter turnover; luxury vinyl is cheaper and warmer underfoot. If you’re finishing the main house floors at the same time, Backsplash, Tile & Flooring in Westwood Lakes covers the pairing.
- Exterior finish. Stucco over CBS is the local norm and matches the neighborhood. Hardie or similar panel cladding costs more and cuts maintenance.
What New Detached ADU Costs in Westwood Lakes, FL
Expect $45,000 – $130,000 for a detached unit, with the number landing where it does based on size, site conditions, and finish grade. Here’s the breakdown of what moves it:
| Factor | Effect on price |
|---|---|
| Size (studio to one-bedroom) | Drives most of the swing |
| Site prep and foundation elevation | Push toward the high end on low lots |
| Utility runs from main house or street | Long runs and new service add cost |
| Impact openings and metal roof | Material upgrade, higher line-item |
| Permit scope and county review | Adds to budget, not avoidable |
A written estimate lists the foundation, shell, roof, utilities, systems, finishes and permit costs line by line. Upfront pricing, no surprises: the number you see is the number you pay, and we don’t come back mid-job with change orders. What typically isn’t included is landscape repair after trenching and any HOA fees. If you’re weighing this against a bigger build, a detached unit is one part of the wider Home Additions & ADU in Westwood Lakes scope, and we can price both side by side.
See the difference
Before
After
Before
After
Before
AfterWhat Westwood Lakes Homes Specifically Do to This Job
Westwood Lakes is a built-out, post-war suburb in 33165, which means almost every detached unit here is new construction dropped onto a 1950s – 1970s lot. That changes the math. Miami-Dade County’s post-Surfside recertification and 40-year inspection rules apply to aging concrete-block homes, and flood-zone elevation requirements mean we check your buildable elevation before we draw anything. On the interior streets, flat-roofed CBS homes tend to show hidden water intrusion at roof-wall junctions after heavy summer downpours, so we check drainage and grade around the new footprint first. The neighborhood’s original terrazzo floors and jalousie windows tell us how the house was built and what the lot can withstand. We work the same lots across Westwood Lakes and the surrounding area.
Serving Westwood Lakes, FL – Our Local Coverage Area
We serve Westwood Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Westwood Lakes
Plan on 6 to 10 months from signed contract to final inspection, and expect the permit review to take 8 to 14 weeks of that with no shortcut. Call (844) 761-9356 for a schedule built around your lot.
Yes. A detached unit is a separate dwelling, so it goes through full county plan review and inspection, and we pull the permits and pass the inspections. Call (844) 761-9356 and we’ll walk through what the review will require for your property.
Usually yes, because a detached unit runs its own utility lines. The cost question is how far those runs travel from the street or main panel, which is why we check service capacity before quoting. Call (844) 761-9356 for an exact figure.
Most projects land between $45,000 and $130,000, driven by size, site elevation, utility runs, and finish grade. Call (844) 761-9356 for a written, line-item estimate.
Every detached ADU we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction, with the terms in writing. Call (844) 761-9356 to see the warranty before you sign anything.
Get a Free Estimate for Your Detached Unit
Call (844) 761-9356 to schedule a free on-site estimate for a new detached ADU in Westwood Lakes. We’ll walk the lot, check setbacks and elevation, and talk through placement and size. You’ll get a written, line-item quote with permits and financing options laid out, plus the full scope from our Home Additions & ADU service. A live person answers, 24/7.