Full Bathroom Remodeling in Kendall, FL: What It Costs and How Long It Takes
A full bathroom remodeling in Kendall runs $9,000 to $28,000 for most homes, and a typical gut-and-redo takes three to five weeks from demo to final walkthrough. That range covers a complete tear-out of a 1970s or 1980s CBS bathroom, new waterproofing, tile, fixtures and a finished permit inspection. Larger layouts, moved plumbing or premium finishes push toward the top. Call (844) 761-9356 for a free on-site estimate with a written line-item quote.
How We Run a Full Bathroom Remodel, Stage by Stage
Full bathroom remodeling is a sequence, not a weekend. Here’s the order we work in and what you decide at each point, so nothing surprises you mid-project.
Stage 1: Measure, permit, and the plan (week 1)
We measure the room, check the existing plumbing and electrical layout, and confirm what stays and what moves. Then we pull the Miami-Dade County permit, which usually takes five to ten business days. You’ll lock in the fixture layout, tile selections and finish grade during this window, since material lead times drive the schedule more than the labor does.
Stage 2: Demo and rough-in (days 1-3)
We tear out the old tub, vanity, tile and drywall down to the studs. Then the plumber and electrician rough in any relocated drains, supply lines, GFCI outlets and exhaust fan. This is the inspection the county wants to see before anything gets closed up. You don’t decide much here; you just approve the rough-in once the inspector signs off.
Stage 3: Waterproofing and board (days 4-6)
We hang cement board and apply a bonded waterproofing membrane in the wet zone. In a subtropical Miami climate, this step matters more than the tile choice above it. Skipping a proper membrane is how bathrooms grow mold behind the wall within a couple of years. You’ll confirm your tile layout and grout color before we set the first piece.
Stage 4: Tile, fixtures, and finishes (days 7-18)
Floor and wall tile go down, then the vanity, toilet, shower valve and trim. This is the longest stretch and the one where your earlier material decisions get locked in. If a vanity or fixture is backordered, we tell you at stage 1, not now.
Stage 5: Final inspection and walkthrough (after day 18)
The county inspects the finished work, and we walk the room with you, checking every door swing, drain flow and caulk line. Our 730-Day Done Right Promise backs the workmanship from that walkthrough forward: if something isn’t right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Full Bathroom Remodel
Every full bathroom remodeling job comes down to a handful of decisions. Here’s what you’re actually picking between, with the honest trade-off on each.
- Tile vs. large-format porcelain vs. luxury vinyl: Porcelain holds up to Miami humidity and daily use and costs more per square foot to set; luxury vinyl is faster and cheaper but won’t last as long in a wet zone. Large-format tile means fewer grout lines, which suits a humid climate, but requires a flatter substrate.
- Vanity grade: A stock vanity is the budget choice, but a semi-custom cabinet line like KraftMaid or Wellborn lets you fit the exact space and pick a finish that survives steam. The trade-off is lead time, usually three to five weeks.
- Shower base vs. tiled pan: A prefab base is quick and predictable; a tiled pan with a linear drain looks cleaner and lasts decades but needs skilled waterproofing.
- Ventilation: A properly sized exhaust fan vented to the exterior is non-negotiable in Kendall’s humidity. A recirculating unit just moves moist air around.
- Impact-rated window: If your bathroom has an exterior window, upgrading to impact glass satisfies hurricane code and eliminates the need for shutters. Worth pairing with a Roof Repair in Kendall if the roof is aging.
What Full Bathroom Remodeling Costs in Kendall, FL
Most full bathroom remodeling in Kendall lands between $9,000 and $28,000. That’s the number to budget before you start, and here’s what moves it up or down.
| Scope | Typical range in Kendall |
|---|---|
| Full bathroom remodel (gut-and-redo) | $9,000 – $28,000 |
| Smaller or secondary bath | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Vanity installation | $800 – $3,000 |
Four variables push a job toward the low or high end. Room size is the first: a 40-square-foot hall bath costs far less than an 80-square-foot primary. Existing condition is the second: cast-iron plumbing, hidden water damage or old galvanized supply lines add demo and repair hours. Third is whether you relocate plumbing or electrical, which triggers extra rough-in work and inspection. Fourth is material grade, from stock vanities to semi-custom cabinets and stone counters. And a wider permit scope adds inspection steps and time.
A written estimate includes labor, materials, permit and disposal. What it typically doesn’t include: hidden rot or mold discovered after demo, moving a load-bearing wall, or upgraded fixtures beyond the quoted spec. We flag all of that in writing before work starts, so upfront pricing stays no-surprise pricing.
See the difference
Before
After
Before
After
Before
AfterWhat Kendall Homes Specifically Do to This Job
Kendall is a built-out corner of unincorporated Miami-Dade west of the Turnpike, and nearly every bathroom we remodel sits inside a 1970s-to-1990s concrete block home. That stock tells you what to expect behind the wall: older cast-iron or galvanized plumbing, builder-grade tile, and sometimes a leak that’s been quietly feeding moisture into the substrate for a decade.
The county paperwork runs the job as much as the carpentry does. Miami-Dade permitting, product-approval compliance and inspection scheduling set the pace, and in a post-Andrew, HVHZ-code county, contractors live or die by the paperwork. We pull the permit and pass the inspection rather than leaving you to chase signatures.
Then there’s the climate. The high heat and humidity mean a bathroom without proper exterior-vented exhaust turns into a mold incubator fast, so we spec it on every job. If your remodel runs alongside exterior work, homeowners often pair this with Roof Replacement & Installation in Kendall to handle the impact-glazing and roof work in one pass. We cover the full scope across Kendall, from the 33176 core out to the edges.
Serving Kendall, FL – Our Local Coverage Area
We serve Kendall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions: Full Bathroom Remodeling in Kendall
Plan for three to five weeks from demo to final walkthrough, with the county permit adding five to ten business days before work begins. Material lead times, especially on semi-custom vanities, are the usual variable. Call (844) 761-9356 and we’ll give you a timeline specific to your bathroom.
Yes, in almost every case. Miami-Dade County requires a permit for plumbing and electrical changes and for a full gut-and-redo, and the work gets inspected. We pull the permit and schedule the inspections as part of your bathroom remodeling service, so you’re not handling the county yourself.
Yes. Keeping the toilet, drain and supply lines where they sit is the most cost-effective way to do a full bathroom remodeling project, and it holds the job closer to the $9,000 end. Relocating a drain or wall is possible but adds rough-in and inspection work. We’ll show you both options in the estimate.
Most jobs run $9,000 to $28,000, with smaller baths at $5,000 to $12,000 and premium finishes or moved plumbing pushing toward the top. Call (844) 761-9356 for an exact quote. Estimates are free and come as a written line-item breakdown.
Every project is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. We also offer 0% financing for 18 months and $1,000 off projects over $10,000. If you want the wider scope, see our Bathroom Remodeling in Kendall page.
Get a Free Estimate for Your Kendall Bathroom
Call (844) 761-9356 to schedule a free on-site estimate for full bathroom remodeling in Kendall. We’ll walk your bathroom, measure the space, check the plumbing and electrical, and hand you a written line-item quote with the permit scope spelled out. Calls are answered by a live person, 24/7, and the number on the estimate is the number you pay.