A Groundwork company - serving The Hammocks, FL
New Detached ADU in Richmond West, FL | Groundwork Construction Co. of The Hammocks

New Detached ADU in Richmond West - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Richmond West, FL: What It Takes and What It Costs

A new detached ADU in Richmond West, FL runs $45,000 – $130,000, and most projects move from signed contract to certificate of occupancy in 5 to 8 months once permits clear Miami-Dade County. The low end buys a compact one-bedroom of roughly 400 – 600 square feet finished to builder-basic standard; the high end covers a two-bedroom approaching 900 – 1,000 square feet with a full kitchen and premium finishes. Call (844) 761-9356 for a free on-site estimate.

Call (844) 761-9356

How a New Detached ADU Gets Built, Stage by Stage

Every detached ADU is a small house, and it’s permitted like one. Here’s the sequence we run in Richmond West and how long each stage actually takes.

Stage 1: Site walk and feasibility (week 1)

We measure the lot, check setbacks against your zoning, look at where the sewer lateral or septic sits, and confirm a workable utility path from the main house. You decide the footprint and how many bedrooms you want, because that choice drives everything downstream. This is also when we flag HOA architectural review if you’re in a gated Richmond West subdivision, since that approval often runs parallel to permitting and can add weeks if it’s skipped.

Stage 2: Design and permit submittal (weeks 2 – 8)

Drawings, engineering, and product approval paperwork go to Miami-Dade County. Because the entire county sits in the High Velocity Hurricane Zone, every window, door, and roof assembly needs a product approval number on file. You approve the final plan set and finish schedule here. Plan review commonly takes 4 – 6 weeks, longer if the reviewer comes back with corrections.

Stage 3: Site prep, slab, and underground (weeks 9 – 14)

We clear and grade, run the utility trenches, and pour the slab-on-grade. Underground plumbing and electrical get inspected before the concrete goes down, so the rough-in inspection is the gate. You make no decisions at this point; it’s trench, pipe, and pour.

Stage 4: Structure and dry-in (weeks 15 – 22)

CBS block walls, tie-beam, trusses, and the roof go up. This is the longest visible stretch. Once the roof is on and the building is dried in, the big-ticket material decisions (flooring, cabinets, tile) need to be locked so lead times don’t stall the interior.

Stage 5: Finishes and final inspections (weeks 23 – 32)

Mechanical, electrical, plumbing, and insulation rough-ins get inspected, then drywall, trim, cabinets, tile, and fixtures. Final building and CO inspections close the job. You walk the finished unit with us before we call it done.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Detached ADU

The shell is fairly standard. Where the money and the trade-offs live is in the finish package and the structural extras.

  • Exterior cladding: Fiber-cement lap siding (James Hardie is the go-to for a reason) holds up to South Florida sun and humidity and resists rot. Stucco over CBS matches most Richmond West main houses but needs the right crack-control detailing to survive seasonal movement.
  • Roof: Concrete or clay tile matches the neighborhood look and lasts decades; a standing-seam metal roof costs more but handles the salt air and monsoon rain well. Either way the underlayment is what fails first, so don’t skimp on the layer beneath the tile.
  • Impact windows and doors: Effectively mandatory in the HVHZ. PGT, CGI, and similar approved assemblies are the norm. You’re choosing between impact-rated and a shutter system, and impact glass wins on daily livability.
  • Cabinets: KraftMaid or Wellborn for the ADU kitchen. A rental-grade ADU can go with a simpler box cabinet; a family-use unit usually justifies the step up.
  • Flooring: Luxury vinyl plank is the practical pick for humidity and pets. Porcelain tile runs cooler and lasts longer.
  • Utilities: Extending from the main panel versus a separate meter for the ADU. Separate metering costs more upfront but makes the unit independently rentable.

What a New Detached ADU Costs in Richmond West, FL

The realistic range is $45,000 – $130,000 for a detached ADU on a Richmond West lot. Here’s what pushes a project to one end or the other.

  • Square footage: A 400-square-foot studio sits near $45,000; an 800 – 1,000-square-foot two-bedroom climbs toward the top of the range.
  • Utility runs: The further the ADU sits from the main house panel and sewer lateral, the more trenching and pipe you pay for.
  • Separate metering: Adding a second electric meter and water service adds cost but unlocks rental independence.
  • Finish grade: Builder-basic versus KraftMaid cabinetry, tile, and impact glass can swing the interior budget 30 – 40%.
  • Site conditions: A flat, clear, buildable pad keeps costs down. Poor drainage, a tight setback, or a lot that needs fill will push the number up.

A written estimate from us breaks out site prep, slab, framing, roof, MEP rough-in, finishes, and permit fees line by line. What’s typically not included: the HOA architectural review fee, any landscaping restoration around the new structure, and furniture or appliances beyond the base package.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Richmond West Lots Change This Job

Richmond West went up mostly in the 1990s and 2000s as a master-planned southwest Miami-Dade suburb, so the housing stock is Mediterranean-style CBS block with stucco and clay or concrete tile roofs, much of it in gated subdivisions off SW 152nd through SW 168th Streets and near US-1. That build era matters for an ADU in two ways. First, many of these lots are already fairly built-out, so setback and lot-coverage math has to be checked carefully before we commit to a footprint. Second, existing service panels from that period are often close to capacity, so adding a detached unit may mean a panel upgrade or a separate service.

Permitting here is HVHZ permitting. Every product on the exterior envelope needs a Miami-Dade product approval, and inspections are strict about it. The 1990s tile roofs throughout these subdivisions are also reaching the age where original underlayment fails, so if your main house roof is original, re-roofing may need to happen alongside – or before – an ADU, and that’s a conversation worth having early rather than mid-project.

We cover the full Richmond West area, and when a detached ADU is part of a larger plan we handle the wider scope through our Home Additions & ADU in Richmond West work. Homeowners often pair a new ADU with an interior refresh through Kitchen Design & Layout in Richmond West or Backsplash, Tile & Flooring in Richmond West, and you can explore the broader Home Additions & ADU service for the full picture.

Serving Richmond West, FL – Our Local Coverage Area

We serve Richmond West and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: New Detached ADU in Richmond West

Get a Free Estimate on Your Detached ADU in Richmond West

A new detached ADU is a real construction project, and it deserves a real number before you commit. Call (844) 761-9356 to schedule a free on-site estimate. We’ll walk your lot, check the setbacks and utility path, and hand you a written line-item quote with a clear schedule. No pressure to sign on the call – just a straight answer about what your Richmond West ADU will take and cost.

Written by the team at Groundwork Construction Co.

Why Richmond West Chooses Groundwork Construction Co. of The Hammocks

We set the standard for new detached ADU in Richmond West.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richmond West

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richmond West Customers Say

Trusted by homeowners across Richmond West and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for New Detached ADU in Richmond West?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richmond West.

(844) 761-9356

Request a Free Estimate in Richmond West

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch