Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Richmond West, FL: What It Actually Takes
A tub-to-shower conversion in Richmond West typically costs $3,500 – $10,000 and takes three to seven working days on site, from demolition of the old tub to a finished, waterproofed shower that passes inspection. The job is narrow: we remove the tub, reframe and waterproof the alcove, set new tile or panels, and install the valve and glass. It’s not a full bathroom renovation unless you want one. Call (844) 761-9356 to schedule a free on-site estimate; we’ll walk your bathroom, measure the alcove, and put real numbers in writing before anyone swings a hammer.
The Process, Stage by Stage
Most homeowners want to know what the week looks like and what they’ll be asked to decide. Here’s the real sequence we run in Richmond West, with the durations we hold to.
Stage 1: Walkthrough and Layout Decision (Day 1, about an hour)
We measure the alcove, check the drain location, look at the existing valve and supply lines, and confirm whether the shower pan can drop where the tub drain already sits. This is the decision that drives everything else. If the tub drain is centered and the rough-in is sound, the shower footprint fits the same opening. If you want the drain moved, that’s a plumbing change and it adds cost and inspection scope. You also pick your layout here: standard alcove shower, a wider curbless entry, or a bench along the back wall.
Stage 2: Demolition and Inspection (Days 1 – 2)
Out comes the tub, the surround, and any rotted backer. It’s the stage where surprises live: in 1990s-era Richmond West homes, we sometimes find moisture behind the old surround where a factory caulk line gave out years ago. We open the wall, replace any compromised drywall or block-facing, and photograph the exposed framing for you. If the plumbing is being relocated, the rough-in gets inspected before anything closes back up.
Stage 3: Framing, Backer, and Waterproofing (Days 2 – 3)
This is the stage that decides whether the shower lasts ten years or thirty. We set cement backer board, tape and mud the seams, and roll on a bonded waterproofing membrane that ties wall to pan in one continuous skin. Corners and the drain flange get reinforced. If you’ve chosen a tile shower, this is where we verify slope to the drain with a level and confirm the flood test holds. Nothing gets tiled over a pan that hasn’t been checked.
Stage 4: Tile, Pan, and Fixtures (Days 3 – 5)
Tile goes up the walls and down into the pan, then grout and seal. The valve trim, showerhead, and drain cover go in last. If you chose a prefabricated pan and panel system instead, this stage compresses to a day and a half because there’s no grout cure to work around. You see the room take shape here, and this is your checkpoint to flag a grout line or tile layout you want adjusted before the glass goes up.
Stage 5: Glass, Caulk, and Final Walkthrough (Days 5 – 7)
Glass gets templated earlier in the week if it’s a custom enclosure and installed at the end. We caulk wet areas, run the water, check for drainage and no leaks at the valve, and clean the site. You get a final walkthrough where we open and close the shower door with you, walk the waterproofing and how to maintain it, and hand over the written warranty. Most Richmond West tub-to-shower jobs land in the five-to-seven-day range; a simple prefab conversion can finish in three.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
The conversion itself is straightforward. Where the money and the long-term outcome live is in what you set inside the alcove. Here’s how the choices break down.
- Tile shower with a tiled pan: The premium option and the one that suits most Richmond West homes. Porcelain tile runs the walls and pan; you pick grout color and tile format. Holds up well against Florida humidity if the waterproofing behind it is done right. Budget for the mid-to-high end of the range.
- Tile walls over a prefab pan: A good middle path. You get real tile on the walls and a molded, guaranteed-to-drain pan underneath. Fewer grout lines to maintain, and it saves a day or two of curing. Slightly less design flexibility at the floor.
- Acrylic or fiberglass surround system: The fastest and most economical route. Panels snap or glue onto the backer, no grout, easy to clean, and it finishes in about three days. The trade-off is a narrower range of looks and a surface that can scratch; it’s a strong fit for a hall bath or a rental.
- Curbless entry: No step-over, so it’s the safer choice for anyone with mobility concerns. It requires the floor to be recessed or a linear drain set at the threshold. Adds cost and framing work, but it’s the most livable version of this job in a single-story Richmond West home.
- Glass enclosure: Frameless glass is the standard finish and what most homeowners picture. Semi-frameless costs less and still reads clean. Custom-templated glass for an odd alcove adds lead time; stock sizes for a standard 60-inch opening move faster.
- Fixtures and valve: Reusing the existing valve saves money but you’re tied to that brand’s trim. New trim from a name like Kohler opens up finish options and often includes a modern pressure-balance valve that handles temperature swings better.
What Tub-to-Shower Conversion Costs in Richmond West, FL
Most tub-to-shower conversions in Richmond West land between $3,500 and $10,000. A basic acrylic surround conversion sits near the bottom of that band; a fully tiled shower with a custom glass enclosure and relocated plumbing sits near the top. Here’s what moves the number.
- Size and layout: A standard 60-inch alcove keeps costs down. Extending the shower footprint, adding a bench, or going curbless adds framing and material.
- Existing condition: Rotted backer, hidden moisture, or a failed pan liner from the old tub surround can add $500 – $1,500 in repair before the new shower starts.
- Plumbing relocation: Moving the drain or valve means a plumbing change and a rough-in inspection. Keeping the rough-in where it sits avoids that cost.
- Material grade: Acrylic panels sit at the low end; porcelain tile, a tiled pan, and frameless glass push toward the high end. Tile format and grout choice matter too.
- Permit scope: A straight fixture swap is a lighter permit than a job that touches the drain line and valve. Miami-Dade County’s High Velocity Hurricane Zone rules don’t apply inside the bathroom the way they do to your roof, but a plumbing change still requires the right permit and inspection.
Our written estimate is line-item: demo, framing, backer, waterproofing, tile or panels, glass, fixtures, and permit. Upfront pricing means the number you see is the number you pay, so the estimate names what’s included and calls out anything that could change it, like hidden rot found after demo. If you’re folding this into a broader project, it’s worth seeing the full scope on our Bathroom Remodeling in Richmond West page, because a conversion paired with a vanity or floor update often prices better as one job than two.
See the difference
Before
After
Before
After
Before
AfterWhat Richmond West Homes Specifically Do to This Job
Richmond West is a master-planned southwest Miami-Dade suburb built out mostly in the 1990s and 2000s, so the bathrooms we open here are two to three decades old. That matters. The original tub surrounds, factory caulk lines, and builder-grade valves in these Mediterranean-style homes off SW 152nd through SW 168th Streets are at the age where they fail quietly behind the wall. When we demo a conversion in a gated community here, we routinely find moisture damage in the lower six inches of backer that never showed on the surface. It’s a fix, not a crisis, but it’s why our estimates carry a line for it and why we open the wall to look before we quote the tile.
The other Richmond West-specific reality is the HOA. Many of the subdivisions here are gated and run architectural review before a permit is even filed, so we plan the sequence around that. If your community’s board needs to see a scope and a finish sample before work starts, we build that lead time into the schedule so you’re not stuck waiting on approval with a demolished bathroom. Miami-Dade County’s post-Andrew building rules govern the plumbing and inspection side of the job, and we pull the permit and pass the inspection rather than leaving it to you. If your project widens into exterior work, homeowners often pair a bathroom conversion with Metal Roofing in Richmond West or Tile Roofing in Richmond West, since both get planned around the same HOA review cycle.
Serving Richmond West, FL – Our Local Coverage Area
We serve Richmond West and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in Richmond West
Most conversions take three to seven working days on site, depending on whether you choose tile or a prefab system and whether the plumbing moves. A tiled shower with a flood test and grout cure runs closer to seven days; an acrylic surround can finish in three. Call (844) 761-9356 and we’ll give you a realistic schedule for your specific bathroom, not a generic range.
Yes, if the job touches the drain line, valve, or waterproofing in a way the county inspects, which most conversions do. Miami-Dade County requires a plumbing permit for a drain or valve change and inspects the rough-in before walls close. We pull the permit and schedule the inspection for you. Call (844) 761-9356 with your address and we’ll confirm what your job needs.
In most Richmond West alcoves, yes. The tub drain is typically centered, and a standard shower pan or tiled pan can drop over the same rough-in, which keeps the job at the lower end of the $3,500 – $10,000 range. Moving the drain to accommodate a curbless or offset layout adds plumbing and inspection scope. We measure the drain location on the walkthrough and tell you which version your bathroom supports before you commit.
Expect $3,500 – $10,000, with most jobs landing in the middle of that band. Material grade, existing water damage behind the old surround, plumbing relocation, and glass enclosure style are the main drivers. Call (844) 761-9356 for a free on-site estimate with a written, line-item quote, so you see the breakdown before you decide.
Every conversion is covered by our 730-Day Done Right Promise: if the workmanship isn’t right, we make it right for two full years. That covers the waterproofing, tile, and installation, which is where a shower actually fails when it fails. The manufacturer warranty on your valve and fixtures runs separately on top of it. Call (844) 761-9356 to talk through the coverage on your specific job, and we’ll put it in writing.
Get a Free Estimate for Your Conversion
If your Richmond West bathroom has a tub you never use and a shower you’d rather have, start with a free on-site estimate. We walk the bathroom, measure the alcove, and hand you a line-item quote with real numbers and a realistic schedule. We cover Richmond West and the surrounding southwest Miami-Dade communities, and our Bathroom Remodeling service covers everything beyond the alcove if you want to go further. Call (844) 761-9356 to schedule your free estimate. Live person, 24/7, no voicemail.
Written by the team at Groundwork Construction Co.