A Groundwork company - serving The Hammocks, FL
ADU Design & Permitting in Kendale Lakes, FL | Groundwork Construction Co. of The Hammocks

ADU Design & Permitting in Kendale Lakes - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Kendale Lakes, FL: What the Process Actually Looks Like

ADU design and permitting in Kendale Lakes usually runs $45,000 – $130,000 for the design-through-permit and site-work stage of a detached or attached accessory unit, and takes 4 – 9 months before a shovel goes in the ground, most of it sitting in Miami-Dade’s plan review queue. Design alone (architectural drawings, structural calcs, wind-load and product-approval documentation) typically falls in the $6,000 – $18,000 slice of that range. Call (844) 761-9356 to schedule a free on-site estimate and we’ll tell you which path your lot supports before you spend a dollar on drawings.

Call (844) 761-9356

How Design and Permitting Moves From First Walk to Issued Permit

An ADU in a build-out subdivision like Kendale Lakes doesn’t start with a floor plan. It starts with what your lot, your setbacks and your existing structure will legally allow. Here’s the sequence we run, and where you make decisions.

Stage 1: Site and zoning feasibility (week 1)

We pull your parcel’s zoning designation, plat and survey, then measure actual setbacks, easements, utility locations and the footprint left after the house, driveway and pool cage. In 33183 this is where most projects get their first reality check: the platted lots around Kendale Lakes are small, and the buildable envelope for a detached unit is often 400 – 600 square feet, not the 800 you pictured. You decide here whether to pursue detached, attached or an interior conversion.

Stage 2: Schematic design and your layout sign-off (weeks 2 – 4)

Our designer produces two or three schematic options with room dimensions, door and window placement, kitchen and bath locations, and a rough cost band for each. This is your biggest decision point: a unit with a kitchen and bath on the same wall as the main house costs meaningfully less than one with plumbing on the far side, because every fixture you move away from the existing drain stack adds trenching and venting. Most homeowners lock a scheme in week 3.

Stage 3: Construction documents and engineering (weeks 4 – 8)

Schematics become stamped drawings: architectural, structural, electrical, plumbing and mechanical, plus the wind-load calculations Miami-Dade requires for anything with a roof. On these post-Andrew CBS homes the structural package also has to address how the new unit ties to or separates from the existing house, and how the roof framing handles uplift. You’re choosing exterior finish, roof type and impact protection during this window, since those land on the drawings.

Stage 4: Permit submittal and plan review (weeks 8 – 20, the long one)

We file with Miami-Dade County, pay the permit fees, and respond to reviewer comments as they come back. Revisions are normal, not a red flag; a clean first pass happens, but a round or two of comments is the realistic expectation on a new dwelling unit. We handle the back-and-forth and keep you informed at each cycle rather than letting the file sit. This is also when HOA architectural review, if your subdivision has one, runs in parallel, and it has its own timeline.

Stage 5: Permit issued, pre-construction walk (week you’re cleared)

Once the permit is in hand we do a final walk to confirm utility tie-in points, staging and access for equipment, and the inspection sequence the county will hold us to: foundation, framing, rough-in, insulation, final. Your decisions are behind you at this point; the build is ours. Everything from here is covered by our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your ADU Before Permits Are Even Filed

Design decisions made in weeks 2 – 8 lock in cost and schedule. These are the ones worth thinking through carefully, with the honest trade-off on each.

  • Detached versus attached versus interior conversion. A detached unit gives privacy and the cleanest rental separation, but it’s the most expensive per square foot because it needs its own foundation, roof and utility runs. Attached shares a wall and some systems and costs less. Interior conversion is the cheapest route but depends entirely on whether your existing garage or Florida room has the ceiling height and structure to work.
  • Impact glass versus shutters. Impact windows and doors add roughly $8,000 – $25,000 depending on unit size, but they eliminate the shutter-storage and storm-prep hassle and satisfy wind-borne debris requirements permanently. Accordion or panel shutters cost far less up front and are perfectly legal; you’ll deploy them every hurricane season for the life of the unit.
  • Kitchen and bath grade. A compact kitchen with quartz counters (Silestone and Caesarstone both hold up well in a humid Florida unit) and mid-grade Kohler or Moen fixtures keeps the budget sane and the maintenance low. Going premium on finishes in a rental unit rarely pays back; going cheap on the wet-wall plumbing always costs you later.
  • Roof assembly. Flat or low-slope roofs are common here, and the membrane or tile choice affects both permit documentation and long-term performance in our summer rain. Tile lasts but is heavy and needs structural allowance; a rated membrane system is lighter and cheaper to install.
  • Utility separation. A separate meter for the ADU lets you rent it cleanly and bill the tenant directly, but adds cost and a second utility review. Sharing the main service is cheaper and simpler, and fine if the unit stays in the family.

What ADU Design & Permitting Costs in Kendale Lakes, FL

Plan on $45,000 – $130,000 for design, permitting and the site-and-utility groundwork that turns an approved plan into a buildable pad, before the unit itself goes up. A straightforward attached or interior conversion sits at the low end; a detached unit with new foundation, full utility runs and impact protection pushes toward the top. The full ADU build, drawings through final inspection, runs $90,000 – $220,000, and this stage is the front half of that number.

Five things move the figure:

  • Unit size and configuration. Square footage drives engineering, plan review fees and material quantities more than anything else.
  • Site constraints. Small lots, tight side yards, existing pools or cages and difficult equipment access all add handling and site work.
  • Utility distance. The farther the new bath and kitchen sit from the existing drain and panel, the more trenching, venting and possibly a panel upgrade you’re paying for.
  • Existing structure condition. On a 40-year-old CBS home, the structural tie-in may reveal stucco or framing issues that have to be corrected to pass inspection.
  • Permit and review scope. County fees, engineering stamps, HOA review and any variance requests all land in the design-and-permit line.

A written estimate from us breaks these out line by line: design, engineering, permit fees, HOA submittal, and site prep. What it won’t include is anything the county hasn’t priced yet (impact fee calculations, for instance) or optional upgrades you add mid-design. Upfront pricing, no surprises: the number you see is the number you pay for the scope we’ve written down. Projects over $10,000 also qualify for $1,000 off and 0% financing for 18 months.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Kendale Lakes Homes Specifically Do to This Job

Kendale Lakes is a build-out, post-1970s Kendall subdivision. Almost nothing here is a greenfield build; nearly every ADU project is a new structure shoehorned onto a fully developed lot, which changes the design problem completely. The housing stock is predominantly 1970s – 1990s single-family CBS construction, concrete block and stucco, flat or low-pitch roofs with tile or shingle, often with a screened lanai and an attached garage. Those homes are now 30 to 50 years old, and the ADU has to work around them, not the other way around.

The local inspection regime is the other half of the story. Miami-Dade’s post-Andrew product approval requirements and post-Surfside structural inspection rules apply to what we design and file, and reviewers expect the wind-load and product-approval documentation to be complete before they’ll move the file. In practice, a hurricane shutter or impact-window permit is often the entry point before a homeowner commits to a bigger project, and we frequently document that work alongside the ADU drawings. Afternoon thunderstorms, hurricane season and relentless summer UV age stucco and roofs here, so we spec exterior materials for that reality rather than mild conditions. Homeowners in Kendale Lakes often pair the ADU groundwork with Full Kitchen Remodeling in Kendale Lakes or Cabinets & Countertops in Kendale Lakes on the main house while the plans are in review, since the site is already active. This is one piece of the larger Home Additions & ADU in Kendale Lakes work we handle, and it’s part of our wider Home Additions & ADU service. We cover the full Kendale Lakes area for it.

Serving Kendale Lakes, FL – Our Local Coverage Area

We serve Kendale Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked, ADU Design & Permitting in Kendale Lakes

Get Your Kendale Lakes ADU Estimate

If you’re thinking about an ADU in Kendale Lakes, the smart first step is a free on-site estimate before you commission any drawings. We’ll measure your lot, check your setbacks and zoning, and tell you what’s actually buildable. Call (844) 761-9356 and a live person picks up, day or night. We’ll schedule the visit, walk your options, and put the numbers in writing.

Written by the team at Groundwork Construction Co.

Why Kendale Lakes Chooses Groundwork Construction Co. of The Hammocks

We set the standard for ADU design & permitting in Kendale Lakes.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Kendale Lakes

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Kendale Lakes Customers Say

Trusted by homeowners across Kendale Lakes and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for ADU Design & Permitting in Kendale Lakes?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Kendale Lakes.

(844) 761-9356

Request a Free Estimate in Kendale Lakes

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch