Fence
Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & paversFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Wood Fence in Kendale Lakes, FL: What It Costs and How Long It Takes
A wood fence in Kendale Lakes, FL typically runs $3500 – $9000 for a standard residential run, and most jobs are finished in two to four working days once the permit clears. Miami-Dade’s wind requirements mean the fence isn’t just a privacy decision here, it’s a wind-load and post-embedment decision, so the plan set and inspection matter as much as the lumber. Call (844) 761-9356 for a free on-site estimate and a written, line-item quote before anything gets ordered.
How a wood fence actually gets built here, stage by stage
The sequence below is what a real wood fence project looks like on a Kendale Lakes lot. Not every job hits every stage, but this is the shape of the work and roughly how the days break down.
- Stage 1: Site walk and layout (day 1, about 2 hours). We mark the property line against the survey, confirm setbacks, and check where the irrigation lines, pool bonding wire, and any buried electrical run to a shed or lanai sit. You’ll decide the fence height (6 ft is the common privacy standard, 4 ft shows up as a front-yard option) and which side the finished face goes toward.
- Stage 2: Permit and HOA check (day 1 to 10, timelines vary). Miami-Dade fencing permits require a wind-load design and post spacing plan. If you’re in a deed-restricted subdivision off SW 147th or near the Kendale Lakes Golf Course, the HOA architectural review runs in parallel and sometimes takes longer than the county. You’ll sign the application and confirm the material and color.
- Stage 3: Demo and post setting (day 2, one full day). Old fence and footings come out, and new posts get set in concrete at the embedment depth the plan specifies. Posts cure before rails go on. This is the stage that decides whether the fence survives a storm, so it doesn’t get rushed.
- Stage 4: Rails, pickets, and gate (day 3, one full day). Rails are leveled off the cured posts, pickets go on flat and tight, and the gate gets hinged and latched with the swing set where you want it.
- Stage 5: Inspection and walkthrough (day 4, about an hour). Final walk with you, punch list noted, warranty paperwork and the 730-Day Done Right Promise handed over in writing.
Decisions you own at each step: fence height and style, finished-face orientation, gate placement and swing, wood species and finish, and whether you want to stain now or let the wood weather first. We tell you which of those actually changes the price and which don’t.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The wood fence options you’ll choose between
- Pressure-treated pine: the workhorse choice for South Florida, and the cheapest way to a full run. It takes humidity well once sealed, but it wants a stain or sealer within the first year and it will cup and twist over time. Suits most Kendall backyards.
- Cedar: more stable, naturally resistant, and it holds a clean finish longer. You pay more, but on a shaded lot with sprinkler overspray it holds up better than pine.
- Stockade versus board-on-board: stockade gives you full privacy edge to edge; board-on-board alternates pickets for a nicer look from both sides but lets a little light and air through, and neighbors usually prefer it because both sides read as finished.
- Post material and footings: wood posts set in concrete are standard; steel posts cost more but outlast the wood and take the wind loading better on exposed runs.
- Finish: clear sealer, solid stain, or letting it weather to gray. Solid stain gives UV protection here; a clear sealer needs re-applying every couple of years.
- Gate hardware: self-closing hinges and a draw latch matter on a pool barrier and on any gate a kid uses daily.
Where a structure shares the fence line, say a shed or a privacy screen by the lanai, we spec matching materials so the run reads as one build rather than a patchwork.
What a Wood Fence costs in Kendale Lakes, FL
The honest range for a residential wood fence in Kendale Lakes is $3500 – $9000, and here’s what moves a job from the low end to the high end:
- Linear feet and height. A short backyard run with a single gate sits at the low end; a full-perimeter job with front and side runs and two gates pushes toward the top.
- Material grade. Pressure-treated pine is the bottom of the range, cedar and steel-post assemblies climb it.
- Existing fence removal. Tearing out old posts and footings, especially concrete set deep in Kendall’s marl and limestone, adds labor.
- Permit scope. A basic fence permit is one thing; a fence that doubles as a pool barrier carries extra inspection requirements.
- Site access. Tight side yards, screened lanais, and mature landscaping slow the work and add a day.
A written estimate itemizes the linear footage, post spacing, materials, removal, permit, and gate hardware so you can see what each line costs. What it typically doesn’t include: stain or sealer (usually quoted as an add-on, applied after the wood seasons), landscaping restoration, and moving irrigation, pool wiring, or electrical out of the fence line.
See the difference
Before
After
Before
After
Before
AfterWhat Kendale Lakes homes specifically do to this job
Kendale Lakes is a build-out subdivision. Nearly every wood fence job here is a replacement on a fully developed lot, not a new build on open ground, which changes the whole job. The lots are small, the side yards are narrow, and there’s usually an old fence, a hedge, a sprinkler line, or a pool cage already in the way. The housing stock is 1970s to 1990s concrete block and stucco on CBS walls, so the fences we replace are frequently the original or one replacement old and the posts have rooted into Miami-Dade’s limestone, which is hard digging. On the wind side, this is post-Andrew code country: fence permits require a wind-load design, post embedment is specified, and inspections check it. A fence along an open canal edge or a corner lot near SW 147th Avenue takes more wind exposure than an interior lot, and that’s where steel posts earn the extra cost. If the fence is part of a full Fence Installation in Kendale Lakes plan, we coordinate the layout with the rest of the project.
Serving Kendale Lakes, FL – Our Local Coverage Area
We serve Kendale Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Wood Fence in Kendale Lakes
Two to four working days of on-site work for a standard residential run, plus the permit timeline. Call (844) 761-9356 for an exact schedule on your property.
Yes, Miami-Dade requires a fence permit with a wind-load design and post spacing plan, and the fence must pass inspection. We pull the permit and coordinate the inspection. Call (844) 761-9356 to start the estimate.
A properly embedded, wind-rated wood fence handles Miami-Dade storms far better than a code-minimum install, and post embedment and spacing are what make the difference. Call (844) 761-9356 and we’ll spec the wind rating for your lot.
Most residential jobs fall between $3500 and $9000 depending on linear feet, material, removal, and gate count. Call (844) 761-9356 for a written line-item quote; estimates are free.
Yes, we match species, picket profile, height, and finish so a repair or extension reads as one continuous run. Call (844) 761-9356 and we’ll bring samples to the estimate.
Get a free Wood Fence estimate in Kendale Lakes
Call (844) 761-9356 for a free on-site estimate on a wood fence in Kendale Lakes. We’ll walk the property line, confirm setbacks and buried lines, and leave you with a written, line-item quote covering linear footage, materials, permit, and removal. Every job is covered by our 730-Day Done Right Promise, with upfront pricing and no surprises.
Written by the team at Groundwork Construction Co.