A Groundwork company - serving The Hammocks, FL
Junior ADU & Interior Conversion in The Crossings, FL | Groundwork Construction Co. of The Hammocks

Junior ADU & Interior Conversion in The Crossings - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Junior ADU & Interior Conversion in The Crossings, FL: Scope, Timeline and Cost

A junior ADU and interior conversion in The Crossings typically runs $45,000 – $130,000 and takes about 3 to 5 months from permit to final inspection. The work converts existing interior space – a garage, a rarely-used bonus room, an oversized den – into a self-contained living suite with its own sleeping area, bath, and kitchenette, and often folds a main-house update into the same permit. Call (844) 761-9356 for a free on-site estimate on your The Crossings property.

Call (844) 761-9356

How a Junior ADU Conversion Moves From Day One to Final Inspection

The sequence below is the one we follow on The Crossings homes. Durations assume a typical 400 – 650 sq ft conversion inside a 1980s or 1990s CBS stucco house, and they shift when structural or utility changes show up.

Stage 1: Site walk and feasibility (week 1)

We measure the candidate space, check ceiling height and egress, and pull the existing floor plan if Miami-Dade has one on file. You decide here whether the unit takes over the garage, splits an existing room, or absorbs a rear addition. This is also where we flag whether the space can share a bathroom wall with the main house or needs a new wet wall.

Stage 2: Design, HOA paperwork and permit submittal (weeks 2 – 6)

We produce the drawing set and submit to Miami-Dade County and the City of Miami. In The Crossings, that permit package goes in alongside your homeowners association’s architectural review application – two separate tracks running in parallel. You decide on the kitchenette layout, bathroom fixture locations, and finish grade during this window, because those choices go on the drawings.

Stage 3: Demolition, framing, and rough-in (weeks 6 – 10)

Demo strips the garage door opening or the room down to studs and slab. Electrical, plumbing, and any ductwork runs go in, then framing for the new partition walls and the bath enclosure. The county’s rough-in inspection happens before anything closes up. You’ll confirm outlet placement and lighting plan at this stage – a decision worth getting right once the drywall is on.

Stage 4: Insulation, drywall, and finishes (weeks 10 – 16)

Spray foam or batt insulation goes in against the block walls, drywall hangs and finishes, and tile, flooring, cabinetry, and fixtures install. A conversion inside a The Crossings home usually needs its own mini-split system rather than an extension of the main-house air handler, and that gets set during this window.

Stage 5: Final inspections and punch (weeks 16 – 20)

Electrical, plumbing, mechanical, and building finals are scheduled. We walk the unit with you against the plan, build a punch list, and close it out. A certificate of occupancy for the new living space gets issued by the county before the unit is legal to occupy.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a The Crossings Conversion

Most of the cost swing on a junior ADU comes down to a handful of picks that happen in the first six weeks. Here’s what those look like in practice.

  • Bathroom layout: Sharing a wet wall with the main house keeps plumbing short and cheap (roughly $4,000 – $7,000 for the rough-in and fixture set). A new stack to the far side of the space can add several thousand because it means breaking slab and running drain line across the room.
  • Kitchenette grade: A compact cabinet run with a bar sink and an undercounter fridge is the low end. Full KraftMaid or Wellborn cabinetry with a 24-inch range and vented hood pushes into the higher band. A kitchenette inside an ADU doesn’t need a full kitchen budget, but the cabinetry you pick is the single biggest finish-line variable.
  • Climate control: A dedicated mini-split is our default for The Crossings conversions – it lets the tenant control their own space and keeps the ADU out of the main-house thermostat fight. Tying into the existing air handler only works if there’s spare capacity, which most 30-year-old systems in The Crossings don’t have.
  • Windows and door: Impact-rated glazing on any new exterior opening is worth pricing in from the start. A James Hardie-clad or impact slider on the former garage door opening is a common route and holds up against the summer rain and storm exposure here.
  • Water heater: A separate tankless or small electric unit dedicated to the ADU makes the unit truly self-contained. Sharing the main-house heater is cheaper up front but muddies the utility split.
  • Flooring: Porcelain tile through the whole unit matches the rest of a typical The Crossings house and handles humidity without the swelling issues that come with laminate in South Florida.

What Junior ADU & Interior Conversion Costs in The Crossings, FL

The full range for this job in The Crossings is $45,000 – $130,000. The low end covers an interior-only conversion with shared plumbing and modest finishes; the high end covers a self-contained unit with new wet wall, dedicated systems, and mid-to-premium cabinetry and tile.

Five things push the number up or down:

  • Size of the space. A 400 sq ft studio builds out cheaper per square foot than a 650 sq ft one-bedroom, but the one-bedroom clears more rent. Square footage drives framing, drywall, tile, and HVAC sizing.
  • Existing condition. A clean garage slab and intact drywall are the best starting point. A room with water damage, old termite repair, or a failed slab is a different scope.
  • Moving plumbing, electrical, or structure. Keeping the bath fixtures near the existing stack saves real money. Cutting a new beam or moving a bearing wall for an open plan adds engineering and inspection.
  • Finish grade. Cabinet and tile selections are where budgets land. A basic kitchenette and a KraftMaid-level one sit at opposite ends of the range.
  • Permit scope. An interior conversion with a new full bath pulls a larger permit set than a studio with a half bath, and the county’s review time and fees follow the scope.

A written estimate from us is line-item: demolition, rough framing, electrical, plumbing, HVAC, insulation, drywall, finishes, and permit fees are each a separate line, with the fixed number stated up front. What’s typically excluded is structural repair discovered after demo, HOA review fees, and any tenant-side appliance the homeowner chooses to supply. No change orders unless you approve them in writing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What The Crossings Homes Specifically Do to This Job

The Crossings is a master-planned Kendall subdivision built almost entirely between the late 1980s and 1990s inside a single ZIP, 33186. That means nearly every house here is a CBS stucco Mediterranean-style home with clay or Spanish tile roofing and an attached garage – which is exactly the stock a junior ADU conversion is built for. There are no basements, so the conversion space is always the garage or an interior room, and the garage slab is usually in good shape because it was poured as a driveway-grade slab under the same roof.

Two things make The Crossings different from the unincorporated pockets nearby. First, every job sits inside an HOA-governed tract, so exterior changes – a new window, a new exterior door at the old garage opening, a stucco patch – need architectural review on top of the county permit. Second, the homes are now hitting 30-plus years, and the original single-pane windows and barrel-tile roofs are the items Florida wind-mitigation inspections flag. That matters here: if the ADU conversion adds any exterior opening, upgrading that opening to impact-rated glazing is the natural moment to do it. Family homes around the Kendall Drive corridor and the quiet interior streets off SW 137th Avenue run into this constantly. The summer wet season from June through November also governs scheduling – exterior stucco work and window swaps get front-loaded in the dry months, and interior work runs year-round.

If the conversion is part of a full Home Additions & ADU in The Crossings plan, we scope it in the same permit package. Homeowners often pair the ADU bath and kitchenette work with Kitchen Design & Layout in The Crossings for the main house, or a Small & Partial Kitchen Remodels in The Crossings refresh to keep the finishes consistent across both units. You can see the broader scope on our Home Additions & ADU service page, and we cover the surrounding area including The Crossings and nearby Kendall communities.

Serving The Crossings, FL – Our Local Coverage Area

We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Junior ADU & Interior Conversion in The Crossings

Get a Free Estimate on Your The Crossings Junior ADU

Call (844) 761-9356 to book a free on-site estimate for a junior ADU and interior conversion in The Crossings. The visit takes about an hour: we measure the space, check the slab and existing systems, and talk through whether the unit lives in the garage or an interior room. You’ll leave the call with a line-item range and a realistic schedule, not a ballpark. Every quote is upfront pricing with no surprises, and the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why The Crossings Chooses Groundwork Construction Co. of The Hammocks

We set the standard for junior ADU & interior conversion in The Crossings.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in The Crossings

Getting your junior ADU & interior conversion project started is simple.

1

Call or Request a Free Estimate

Tell us about your junior ADU & interior conversion project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local junior ADU & interior conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What The Crossings Customers Say

Trusted by homeowners across The Crossings and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for Junior ADU & Interior Conversion in The Crossings?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in The Crossings.

(844) 761-9356

Request a Free Estimate in The Crossings

Tell us about your junior ADU & interior conversion needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch