Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What does a Junior ADU & Interior Conversion in Country Walk, FL actually involve?
A Junior ADU & Interior Conversion in Country Walk, FL typically runs $45,000 – $130,000 and takes 10 to 16 weeks from first permit submittal to final inspection. The job turns an existing interior space into a small, code-compliant living unit with its own entry, kitchenette and bath while the rest of the home stays livable. Because Country Walk is governed by an HOA with architectural review, the approval timeline often sets the pace before construction starts. Call (844) 761-9356 to schedule your free estimate and we’ll walk the space with you.
How we move a Junior ADU & Interior Conversion from drawings to final inspection
Every conversion follows the same five stages in Country Walk. Here’s what happens and when.
Stage 1: Walkthrough and HOA review (weeks 1 – 2)
We measure the candidate space, confirm egress and ceiling height, and photograph the existing mechanicals. Then you submit the ARB packet to the Country Walk architectural review board: exterior door style, exterior finish, lighting color temperature and any window changes. This is where most schedules slip, because a board that meets monthly can add three to four weeks. We prepare the drawings and product cut sheets you’ll need to submit.
Stage 2: Permit drawings and submittal (weeks 2 – 4)
Miami-Dade County review of an interior conversion covers egress windows, smoke and CO detection, a dedicated kitchenette circuit, and bath ventilation tied to the Florida Building Code. We file the drawings and handle corrections. You decide at this stage whether the unit gets one entry or a separate exterior door, which affects both cost and HOA scope.
Stage 3: Demo and rough-in (weeks 4 – 8)
Demo comes first, then framing for the new partition walls, plumbing rough-in for the kitchenette sink and bath, electrical for outlets, lighting and the subpanel if the load requires one. Inspections happen in this window. If you’re relocating plumbing, expect two extra weeks and a real dollar jump.
Stage 4: Insulation, drywall, finishes (weeks 8 – 13)
Drywall, then cabinets, counters, tile, flooring and paint. This is where you choose finishes and where lead times on cabinetry and tile dictate the finish date, not us.
Stage 5: Final inspection and punch (weeks 13 – 16)
Final county inspection, then a walkthrough where we list and correct every item. We don’t call it done until you’ve signed off. If you’re also planning a Home Additions & ADU in Country Walk on a larger scale, we coordinate the two so the conversion doesn’t have to be redone.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll weigh for the conversion
These are the decisions that land on your plate, with the honest trade-offs.
- Entry configuration: A separate exterior door gives the unit privacy and its own address, but adds framing and ARB review. Sharing the main entry is cheaper and faster, but limits flexibility.
- Kitchenette vs. full kitchen: A sink, two-burner cooktop and under-counter fridge fit most junior layouts. A full range requires larger electrical and venting, pushing the budget higher.
- Countertop material: Quartz or a Silestone quartz surface holds up in a small kitchenette and handles humidity well; laminate is the budget pick and shows wear faster in a rental scenario.
- Bath fixtures: A Kohler or Moen fixture set balances durability and price; a compact shower pan saves space without adding cost.
- Flooring: Luxury vinyl plank handles South Florida humidity and small spills with no swelling; tile is heavier but more forgiving over concrete block.
- Door style for ARB: Country Walk’s standard calls for specific entry door styles and colors. We match what the board has approved so your replacement doesn’t trigger a violation.
What a Junior ADU & Interior Conversion costs in Country Walk, FL
Expect $45,000 – $130,000 for a conversion in Country Walk. The number you see on our written estimate is the number you pay; we don’t change it mid-job unless you change the scope.
What pushes the number up or down
- Size: A 300-square-foot studio lands near the low end. A two-room, 600-square-foot unit with full bath hits the high end.
- Existing condition: Aging plumbing, undersized electrical panels or settling slab add cost before finishes begin.
- Moving plumbing, electrical or structure: Relocating a wall or stack is the biggest cost variable. Keeping the new bath lined up with existing drains saves real money.
- Material grade: Entry-level cabinets and laminate countertops keep you near $45,000; premium cabinets, quartz counters and better fixtures approach the upper range.
- Permit scope: A single-sheet interior permit is quick; anything requiring new structure or a subpanel adds review time.
A written estimate covers demo, framing, MEP rough-in, drywall, finishes, permits and inspections. It typically does not cover ARB filing fees, structural engineering if required, or landscape repair after trenching. Homeowners often pair this with Small & Partial Kitchen Remodels in Country Walk to keep the main kitchen in step.
See the difference
Before
After
Before
After
Before
AfterWhat Country Walk homes do to this job
Country Walk is a master-planned west Kendall community built largely in the 1980s and ’90s, ZIP 33196. The housing stock is concrete-block single-family homes and townhomes with stucco exteriors and CBS construction, which actually works in your favor here: the walls are already there, the slab is solid, and the plumbing stacks are usually in serviceable condition. The real constraint is the HOA. Every conversion has to clear both Miami-Dade County permitting and the Country Walk architectural review, which a lot of neighboring areas don’t impose. That means your exterior entry door style, your finish color and any new lighting have to fall within the community’s approved palette before a single wall comes down. We prepare ARB-compliant specifications so your conversion doesn’t become a violation. The uniform tile roofs from that build era are also hitting end-of-life in clusters, so if your conversion is part of a broader renovation, address the roof and stucco while the scaffolding is up. For full-service alternatives, our Home Additions & ADU team covers the wider scope, and we work across Country Walk regularly.
Serving Country Walk, FL – Our Local Coverage Area
We serve Country Walk and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Junior ADU & Interior Conversion in Country Walk
Most conversions run 10 to 16 weeks. HOA review is usually the longest single item, so budget extra weeks if the board meets monthly. Call (844) 761-9356 for a timeline on your specific space.
Yes. Miami-Dade County requires a permit for any conversion that adds a kitchenette, bath or new partitions, and the Country Walk HOA requires architectural review on top of it. We handle the permit drawings and the ARB packet.
In most cases, yes. If an existing bath lines up with the new layout, you avoid the biggest cost jump. Keeping the footprint intact also shortens the permit review.
Only if it matches the approved palette. We specify ARB-compliant door styles, colors and finishes and prepare the matching cut sheets so the board approves it without a second round.
Most Country Walk conversions land between $45,000 and $130,000 the number on your written estimate is what you pay, with no change orders unless you change the scope. All work is covered by our 730-Day Done Right Promise.
Schedule your free Country Walk estimate
If you’re ready to price a Junior ADU & Interior Conversion in Country Walk, call (844) 761-9356. We’ll walk the space with you, flag the HOA and permitting items up front, and hand you a written line-item estimate with fixed pricing. Estimates are free, and a live person answers the phone 24/7.
Written by the team at Groundwork Construction Co.