A garage conversion ADU in Kendall West typically runs $45,000 – $130,000 and takes 10 to 16 weeks from permit to final inspection. The work turns an existing attached garage into a legal, permitted living unit: new slab or floor build-up, framing and insulation, electrical and plumbing, a full bathroom and kitchenette, HVAC, impact-rated glazing, and a separate entrance. Most Kendall West garages need more structural and moisture work than homeowners expect. Call (844) 761-9356 for a free on-site estimate.
How We Build a Garage Conversion ADU in Kendall West, Stage by Stage
Here’s the actual sequence, with the decisions you’ll make along the way.
- Stage 1 – Site and permit review (weeks 1 – 3). We measure the garage, check the slab for cracks and settlement, look at how the existing roof ties into the house, and pull the property survey. You’ll need to decide whether the unit stays fully attached or gets its own entry cut through the side wall. In Kendall West, where lots along the western edge back up to the Everglades buffer, we also confirm setbacks and drainage before anything is drawn. Permits with Miami-Dade County take roughly 4 to 8 weeks depending on how complete the submittal is.
- Stage 2 – Demo and slab prep (week 4 – 5). Out comes the garage door, opener, and any storage build-outs. We grind or pour a level floor, address moisture, and set the base for finished flooring. You decide flooring here: sealed concrete, luxury vinyl plank, or tile. Tile holds up best in South Florida humidity.
- Stage 3 – Framing and rough-in (weeks 5 – 8). New interior walls, a bathroom wet wall, and the electrical and plumbing runs go in. If you want the kitchenette on the far wall from the house, that’s a longer plumbing run and a bigger number. Rough-in inspections happen before any drywall goes up.
- Stage 4 – Insulation, drywall, and systems (weeks 8 – 11). Spray foam or batt insulation, drywall, tape and texture, then HVAC, water heater, and the panel work. This is where a mini-split versus a ducted system gets decided. A mini-split is usually the simpler, cheaper call for a single-room unit.
- Stage 5 – Finishes and final inspection (weeks 11 – 16). Cabinets, countertops, fixtures, paint, trim, and the final walkthrough. Your finish choices set the pace here. A Caesarstone or Silestone countertop and a compact Kohler vanity sink keep the kitchenette practical without blowing the budget.
This is a permitted, inspected build, so plan for real time. If the garage conversion is part of a full Home Additions & ADU in Kendall West scope with lot work or a new roof tie-in, add several weeks.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make on a Garage Conversion ADU
Every decision below moves the price. None of them are cosmetic afterthoughts.
- Climate system. A ducted system tied to the house is cleaner-looking but requires running ductwork and possibly upsizing the existing unit. A mini-split is a separate system, cheaper to install, and easier to control independently. For one room, mini-split is usually the better fit.
- Bathroom scope. A full bath with a walk-in shower runs more than a half bath or a compact shower stall. If the garage shares a wall with an existing bathroom, tying into that drain line saves trenching and money.
- Kitchenette level. A sink, mini-fridge, and microwave niche is the modest end. A full counter run with a cooktop pushes toward the top of the range. Silestone and Caesarstone both hold up well against humidity; a Kohler or Moen fixture set is the reliable middle ground.
- Flooring. Sealed concrete is the cheapest and coolest underfoot. Luxury vinyl plank is warmer and forgiving. Porcelain tile costs more but handles moisture and wear best in a South Florida garage floor.
- Windows and door. Impact-rated glazing is required here for wind-borne debris protection, so this line item is not optional. What you choose is the size and count.
- Entry. Reusing the existing garage door opening as a walled-in entry is the cheapest path. Cutting a new exterior door through the block wall costs more.
Homeowners often pair a garage conversion with Cabinets & Countertops in Kendall West for the kitchenette and Backsplash, Tile & Flooring in Kendall West for the wet areas, and it makes sense to price those in the same pass.
What Garage Conversion ADU Costs in Kendall West, FL
Expect $45,000 – $130,000 for a permitted conversion. The low end is a straightforward single-room build reusing the existing footprint. The high end adds a full kitchen, a generous bathroom, all-new impact glazing, and structural or plumbing relocation. A basic garage conversion without a full ADU scope runs $30,000 – $80,000, which is the number to keep in mind if you’re comparing this against simply finishing the garage.
Five things push the number up or down:
- Square footage. A one-car garage at roughly 200 – 250 sq ft keeps costs down. A two- or three-car garage converted to a full unit adds square footage, extra windows, and more electrical.
- Existing condition. Slab cracking, old termite damage, or a garage door header that needs replacement adds real money. CBS construction and stucco in this era of Kendall West home usually holds up, but the slab often doesn’t.
- Moving plumbing or electrical. A new drain line across the slab is one of the biggest line items on the invoice. Keeping the bathroom against the shared house wall avoids that.
- Finish grade. Builder-grade cabinets and a modest vanity versus a full Caesarstone or Silestone countertop and Kohler fixtures is a five-figure swing on a large conversion.
- Permit scope. A full ADU with a kitchen and separate meter costs more in permit and inspection fees than an interior finish permit. We pull the permits and pass the inspections; the scope sets the price.
Our written estimates are line-item, upfront, and fixed. You see what’s included and what isn’t before you sign anything. Call (844) 761-9356 for an exact quote, free and on-site.
See the difference
Before
After
Before
After
Before
AfterWhat Kendall West Homes Do to This Job
Kendall West is mostly a west-edge subdivision built out from the 1980s through the 2000s, and the housing stock reflects that: CBS walls with stucco, barrel-tile or shingle roofs, and a lot of Mediterranean-style infill. That means our conversions here are almost always on concrete-block garages, not old wood-frame structures. The work is predictable once the slab is sound. What isn’t predictable is the moisture. Heavy summer thunderstorms and hurricane-season wind-driven rain find every crack in stucco and every failed penetration. On a garage conversion, we treat moisture control as a primary line item, not a detail, because a converted unit that stays wet is not a legal, livable space.
The ZIP code is 33193, and homes along the western edge back up to the Everglades conservation boundary. On any addition or new slab, that means stricter setback and drainage review and elevated flood-plain concerns. Interior Kendall crews don’t deal with this nearly as often. Every window and door also has to meet Florida wind-borne debris and High-Velocity Hurricane Zone product approval, which changes what you can buy for the entry and glazing. It all runs through our Home Additions & ADU service and the local Kendall West team. Getting this right the first time is what the 730-Day Done Right Promise is for.
Serving Kendall West, FL – Our Local Coverage Area
We serve Kendall West and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Kendall West
Plan on 10 to 16 weeks of construction, plus 4 to 8 weeks for the permit to clear. Simple conversions finish near the short end; jobs that relocate plumbing or add a full kitchen run longer. Call (844) 761-9356 for a timeline specific to your garage.
Yes. A garage conversion ADU is a permitted use in Kendall West and requires building, electrical, plumbing, and mechanical inspections through Miami-Dade County. Skipping the permit creates a real problem at resale and can force you to undo the work. We pull the permits and pass the inspections as part of the job.
Often, yes. If the garage shares a wall with an existing bathroom, the drain line can usually tie in without trenching the slab, which is the single biggest cost saver on this job. Structural changes are only needed if the garage door header must be replaced or a new side entry is cut. We’ll tell you which path your garage can take at the estimate.
The realistic range is $45,000 – $130,000 depending on size, bathroom and kitchenette scope, finish level, and whether plumbing moves. Impact-rated glazing and moisture control are included, not optional add-ons. Call (844) 761-9356 for a line-item quote, free and on-site.
Every conversion is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That’s one of the longer workmanship guarantees you’ll find in residential construction. Our technicians have up to 12 years of experience, and every crew is background-checked and uniformed.
Get Your Free Garage Conversion ADU Estimate in Kendall West
Every garage conversion ADU is different, and the only honest way to price yours is to see it. Call (844) 761-9356 to schedule a free on-site estimate in Kendall West. A live person answers 24/7, and on the visit we’ll measure the garage, check the slab, review your options, and hand you a written line-item quote. No surprises, no pressure. If it turns out your garage is better served by a wider scope, we’ll say so.
Written by the team at Groundwork Construction Co.