A Groundwork company - serving The Hammocks, FL
New Detached ADU in The Hammocks, FL | Groundwork Construction Co. of The Hammocks

New Detached ADU in The Hammocks - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

An New Detached ADU in The Hammocks is a separate, self-contained dwelling built on your lot, fully permitted and built to Miami-Dade’s hurricane code. Expect $45,000 – $130,000 and roughly 5 to 9 months from first survey to final inspection, depending on size, site work and finish level. Call (844) 761-9356 to schedule a free on-site estimate for your New Detached ADU in The Hammocks.

What a New Detached ADU in The Hammocks involves, start to finish

A detached ADU is its own structure: foundation, walls, roof, its own electrical panel, often its own water and sewer tie-ins. That’s the difference between this and a garage conversion, and it’s where the schedule and budget live. Most projects here run 5 to 9 months, and $45,000 – $130,000 on a standard lot. Here is the actual sequence we follow.

Call (844) 761-9356

Stage 1: Site survey and feasibility (weeks 1 – 3)

Before anyone draws anything, we walk the lot and confirm the setbacks, easements, utility locations and how much buildable footprint you actually have after the required yard clearances. In The Hammocks, this is where a lot with a corner exposure or a drainage easement at the rear will shrink your buildable area fast, and you need to know it before you get attached to a layout. You decide here: an attached or detached orientation, footprint size, and whether you want one bedroom or two. We pull the property survey and stormwater records so the setbacks are confirmed, not guessed.

Stage 2: Design, engineering and permitting (weeks 3 – 12)

Plans get drawn, then stamped by an engineer for wind load under Miami-Dade’s High-Velocity Hurricane Zone requirements. Your permit package includes structural, electrical, plumbing, mechanical and energy calculations, and the county review itself typically eats 6 to 10 weeks. You’ll make two decisions here that shape everything after: exterior finish and extent of utility runs. Every material and tie-in has to be listed on the approved plans, so these aren’t choices you can leave until the crew is on site.

Stage 3: Site work and foundation (weeks 12 – 18)

Once the permit is issued, we clear the footprint, run utility trenches, and set forms and steel. Then come the inspections: footer, then slab. We build a slab-on-grade foundation here because the groundwater table in The Hammocks is high and the soil is typically corrugated, so drainage and grade direction matter. You decide the finished floor elevation and what finish goes on the exterior, since that’s baked in the moment the slab is poured.

Stage 4: Framing, roof and rough-ins (weeks 18 – 30)

Block walls go up, then roof framing and the dry-in so the structure is sealed before the rainy months hit. We rough in electrical, plumbing and HVAC, then pass the rough inspection. In this wind zone, every fastener and strap spec is inspected against the approved plans. You’ll pick out here: impact windows versus shutters, the roof material, and where you want outlets and fixtures. Choose early, because changes after the walls close are the most expensive changes you can make.

Stage 5: Finishes, final inspection and walkthrough (weeks 30 – 40)

Drywall, cabinets, flooring, fixtures and paint. Then the final building inspection and a Certificate of Occupancy, which is what makes the unit legal to live in or rent. We walk the finished unit with you against the written scope before we call the job done. The last decisions are finish-level picks: cabinet fronts, countertop materials, flooring, plumbing fixtures. Those are where the budget either holds or starts to creep.

The options you’ll choose between on a detached ADU here

These are the real decision points on a new detached ADU in The Hammocks, with the honest trade-off on each.

  • Size and layout. A one-bedroom studio footprint runs toward the low end of the range; a two-bedroom with a full kitchen pushes toward $130,000 and beyond. Every additional 100 square feet of conditioned space adds cost in foundation, roof, and mechanical capacity, so decide the use first (rental, in-laws, home office) and size to that.
  • Exterior cladding. Stucco over concrete block matches the rest of The Hammocks and holds up well to sun and wind-driven rain, at a moderate price. James Hardie fiber-cement siding is an option for a lighter, more textured look and resists moisture well, but it’s a step up in material cost and needs proper detailing.
  • Roof. Concrete or clay tile matches the tract vernacular and lasts decades, at a higher upfront cost. A shingle roof is cheaper but the South Florida sun shortens its life, so plan for a shorter replacement cycle.
  • Window and door system. Impact-rated windows are the default here, since Miami-Dade requires hurricane-rated glazing or approved protection. Skipping impact glass in favor of shutters saves money now and costs you in convenience and resale.
  • Kitchen and cabinetry. If the ADU has a full kitchen, KraftMaid or Wellborn cabinetry gives you a durable, warranty-backed box and reasonable lead times. Builder-grade stock cabinets save money but show wear faster. The right pick depends on whether this is a rental or a family unit.
  • Systems. A dedicated electrical panel and separate sub-meter make the unit self-contained and rentable; sharing utilities with the main house is cheaper to install but muddies the rent picture.

A Tuff Shed or similar prefab structure is not a legitimate substitute here. An ADU has to be permitted, rated for wind, and pass inspection as a dwelling, which a storage-style shed will not.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

What a New Detached ADU costs in The Hammocks, FL

Budget $45,000 – $130,000 for a new detached ADU in The Hammocks. That range covers a smaller one-bedroom unit on a straightforward lot at the low end up to a full two-bedroom with a complete kitchen and upgraded finishes at the high end. Five variables move the number:

  • Size and bedroom count. A one-bedroom versus a two-bedroom is the single largest swing, adding foundation, roof area and a second bathroom.
  • Site and soil conditions. High groundwater, drainage corrections or tight buildable footprint on the lot add site work and can push the job upward.
  • Utility tie-ins. Running new water, sewer and electrical from the main house, or sub-metering the unit, is a real line item. Distance from the main service panel matters.
  • Material grade. Impact windows versus shutters, tile versus shingle, custom versus stock cabinetry. Each upgrade is a real number, not a vague “premium.”
  • Permit and inspection scope. The permitting, engineering and inspection process itself is a cost, and structural or code items discovered during review can add to it.

Your written, itemized estimate lists exactly what’s in: design, engineering, permit package, foundation, framing, roof, all systems, finishes at your selected grade, and final inspection. What typically sits outside: landscaping and sod replacement beyond the footprint, furniture, and any appliance package you want beyond the basics. Our pricing is upfront. The number you see is the number you pay, and any project over $10,000 gets $1,000 off. We also offer 0% financing for 18 months to spread the cost.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why The Hammocks lots behave the way they do

The Hammocks was built almost entirely in the 1980s – 2000s as a master-planned Kendall-area subdivision, so nearly every lot here is a concrete-block home on a standard tract footprint. That matters for a detached ADU because your buildable area is often tighter than it looks: the setbacks from the required yard clearances, driveways and drainage easements eat into the footprint before you place a single wall. We check the survey and stormwater records before we sketch anything, because the wrong footprint on this lot is a redesign.

Because the block was built in a narrow window, whole streets hit the same milestones together. When one neighbor’s re-roof or impact-window permit goes up, a run of copycat jobs follows down the block, and a new detached ADU on your street can prompt the same. Miami-Dade’s High-Velocity Hurricane Zone rules mean every ADU here is engineered for wind load, from roof straps to glazing, and the plan review and inspections enforce that. High groundwater changes the foundation and drainage approach too. If your wider project is a full gut or a larger living-space change, the scope lives on our Home Additions & ADU in The Hammocks page. The same crews also handle Backsplash, Tile & Flooring in The Hammocks and Kitchen Design & Layout in The Hammocks if you want the ADU kitchen or floors to match the main house. You can see the wider home additions & adu service too. Call (844) 761-9356 for a free estimate, and we cover The Hammocks and the surrounding Kendall-area communities.

Serving The Hammocks, FL – Our Local Coverage Area

We serve The Hammocks and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in The Hammocks

Get a free estimate for your New Detached ADU in The Hammocks

We’ll come to your lot, confirm the setbacks and buildable footprint, and put together a written, itemized estimate for your New Detached ADU in The Hammocks. No guesswork, no vague numbers, and a live person answers the phone around the clock. Call (844) 761-9356 to schedule your free estimate and design consult, and mention the $1,000 off on projects over $10,000 so it lands in your quote from the start.

Written by the team at Groundwork Construction Co.

Why The Hammocks Chooses Groundwork Construction Co. of The Hammocks

We set the standard for new detached ADU in The Hammocks.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in The Hammocks

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What The Hammocks Customers Say

Trusted by homeowners across The Hammocks and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for New Detached ADU in The Hammocks?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in The Hammocks.

(844) 761-9356

Request a Free Estimate in The Hammocks

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch