FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Kitchen Design & Layout in The Hammocks, FL: What It Costs and How Long It Takes
Kitchen design & layout in The Hammocks runs $14,000 to $45,000 for most homes, and the planning-and-build arc usually takes 5 to 9 weeks from first measure to final walkthrough. Layout work is the front half of that: figuring out where the sink, range, island and storage land before anyone swings a hammer, then building to that plan. Call (844) 761-9356 and we’ll walk your kitchen, take real measurements, and give you a written line-item estimate at no cost.
How the design-and-layout process actually runs, stage by stage
Most of the risk in a kitchen lives in the plan, not the install. Here’s the real sequence we follow, and what you’re deciding at each stop.
Stage 1 – On-site measure and wish list (day 1, about 90 minutes)
We measure every wall, window, door and appliance, note where the plumbing stack and electrical panel sit, and photograph the existing finishes. You tell us what’s driving the change: a galley that blocks two cooks, a peninsula nobody can walk around, no pantry. We leave with a dimensioned drawing and a short list of what can move cheaply versus what can’t.
Stage 2 – Layout options and a working budget (days 2 – 5)
You get two or three layout directions with the trade-offs spelled out: keeping the plumbing where it is versus relocating the sink, an L with a small island versus a U with no island. This is where the budget gets firmed up. Most homeowners land on a number here and design around it, not the reverse.
Stage 3 – Selections before demo, not during (days 5 – 14)
Cabinet door style and box construction, countertop material and edge, backsplash, hardware, lighting plan, appliance rough-in dimensions. Every one of these needs to be locked before the crew starts, because a 36-inch range that becomes a 48-inch range mid-job means redoing the cabinet run. We hold selections in one place and confirm lead times against the schedule.
Stage 4 – Permitting and demo (week 2 into week 3)
Structural changes, moved plumbing, added circuits and new gas lines need a Miami-Dade permit and inspections; a straight cabinet-and-counter swap usually doesn’t. Demo is one to three days. Walls get opened, any surprises get photographed and priced in writing before we continue.
Stage 5 – Rough-in, drywall, set, and punch (weeks 3 – 8)
Plumbing and electrical rough-in get inspected, walls close up, cabinets set, countertops templated and installed, then tile, paint, fixtures and appliances. Final inspection follows. We walk the finished kitchen with you and fix what’s on the punch list before we call it done. Our technicians have up to 12 years of experience, and every layout is built to the plan you signed.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The layout and material choices you’ll weigh, with the honest trade-offs
- Keep the plumbing or move it. Leaving the sink where it is saves real money on the rough-in and keeps your timeline tighter. Moving it opens up a much better work triangle and a proper island, but adds plumbing, patching and inspection time. Worth it if the current layout is the reason you’re remodeling at all.
- Galley, L, U, or island plan. A galley with a clear aisle is the most efficient for one cook in a narrow footprint. An L with a small island suits most The Hammocks homes. A U gives the most counter and cabinet run but can close off a kitchen that already feels tight.
- Cabinet boxes: stock, semi-custom, or custom. Stock is fast and the cheapest per linear foot but limited in odd dimensions. Semi-custom, like the KraftMaid lines we work with, fits more of a real room without custom prices. Full custom buys you exact dimensions and finishes at the top of the range.
- Countertop surface. Quartz (Cambria among our partners) is the default now: non-porous, no sealing, consistent pattern. Granite costs comparably and is one-of-a-kind but needs periodic sealing. Laminate is the budget option and shows wear around the sink sooner.
- Storage and lighting. A pull-out pantry and deep drawers cost more than fixed shelving and pay you back daily. Under-cabinet lighting is cheap to add during the build and much more expensive after the backsplash is up.
If your design lands on new cabinet fronts and stone, our Kitchen Remodeling service covers the full build behind it. And homeowners often pair this with Vanities, Tile & Fixtures in The Hammocks when the same tile and cabinet order can serve both rooms.
What Kitchen Design & Layout costs in The Hammocks, FL
Plan on $14,000 to $45,000 for kitchen design & layout work in The Hammocks, with the wide spread explained by scope and material grade. A modest layout with semi-custom cabinets and quartz sits near the middle; a full reconfiguration with moved plumbing, an island and premium finishes pushes toward the top.
| Line item | Typical range |
|---|---|
| Design and layout planning | Included in project |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full kitchen remodel (layout + build) | $14,000 – $45,000 |
Five things move that number: room size and cabinet run length; whether you relocate plumbing, gas or electrical; cabinet grade (stock versus semi-custom versus custom); countertop material and edge detail; and permit scope when structure or systems change. Every written estimate is line-itemed, so you see the number you’ll pay. Our 730-Day Done Right Promise covers the workmanship from foundation to finish line, and there’s no change order without your signature.
See the difference
Before
After
Before
After
Before
AfterWhat The Hammocks homes specifically do to this job
The Hammocks is a large unincorporated Kendall-area subdivision built almost entirely in the 1980s through the 2000s, so the kitchens we open here are 20-to-35-year-old rooms inside concrete-block (CBS) homes with stucco exteriors. That vintage shows up in specific ways: the original cabinet boxes are usually particleboard stapled into furring, the electrical is often a minimal circuit count that won’t carry a modern appliance package, and the walls behind the old tile are sometimes furred out where it’s hard to predict. Because these tracts went up in uniform waves, whole blocks hit the same milestone at once, and we frequently work alongside neighbors doing near-identical layouts a few doors down. Everything we build has to meet Miami-Dade’s post-Andrew wind and impact code, which matters most when a layout change touches an exterior wall or a window opening. That’s why we open walls and confirm what’s there before we quote a structural move, not after.
Serving The Hammocks, FL – Our Local Coverage Area
We serve The Hammocks and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Kitchen Design & Layout in The Hammocks
It depends on what moves. A straight swap of cabinets, countertops and backsplash in the same footprint typically doesn’t need one, but relocating plumbing, adding electrical circuits, moving gas, or changing a wall does. We pull the permits and handle inspections whenever your layout touches those systems, and we tell you upfront which side of the line your job falls on. Call (844) 761-9356 and we’ll sort it out on the site visit.
Most projects run 5 to 9 weeks from measure to final walkthrough, with design and selections taking about two of those weeks and the build covering the rest. A smaller footprint with fewer relocations can land toward the shorter end; a full reconfiguration with an island and moved plumbing trends longer. Call for a free estimate and we’ll give you a realistic timeline for your actual room.
Usually yes, and it’s the smart place to start. Swapping the sink and range walls within the existing plumbing zone, replacing a blocking peninsula with a small island, or capturing dead space for a pantry can transform how a kitchen works without touching the structure. We’ll show you both versions side by side so you can see what the money buys.
The top of the $14,000 to $45,000 range comes from moved plumbing and electrical, a structural change, a large island, and premium cabinet and stone selections. Existing conditions also matter: a room that needs the electrical service upgraded or walls reframed pushes the number up. Call (844) 761-9356 for a written estimate that breaks out where your money is going.
Every kitchen design & layout project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right, one of the longest workmanship guarantees in residential construction. That’s backed in writing, along with the manufacturer warranties on the cabinets, countertops and appliances. Ask us to put the details in your estimate so there’s no fine print to puzzle out later.
Get a free estimate for your kitchen design & layout in The Hammocks
Call (844) 761-9356 for a free on-site estimate. We’ll measure the room, talk through the layout directions that actually work in your footprint, and hand you a written line-item quote with no obligation. If the project ends up reaching beyond the kitchen, our Kitchen Remodeling in The Hammocks page covers the full scope, and you can see everywhere we work on our The Hammocks service-area page. Nothing gets scheduled until you’ve seen the numbers and signed off.
Written by the team at Groundwork Construction Co.