Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Sunset
Sunset homeowners planning an addition or ADU are working on a tight lot in an unincorporated community, and both facts shape the quote before a single permit is filed. We build to those conditions every week. Our crews know the mid-century blocks off Sunset Drive and the 33173 subdivisions well enough to tell you on the first walk-through where staging will fit, which walls are shared, and what Miami-Dade County’s Unincorporated Municipal Services (UMS) will ask for. Permits here run on county timelines, not a city hall’s, so the schedule has to be built around that reality. Call (844) 761-9356 and a live person picks up, day or night. We’ll set a free estimate and bring a written, line-item scope you can actually compare.
Why Groundwork Construction Co. of The Hammocks Is Sunset’s Preferred Home Additions & ADU Company
Sunset jobs reward contractors who understand density. A rear addition on a 6,000-square-foot lot with a shared side wall is a different project from the same square footage out west, and pricing it like the west is how bids go sideways. We treat access, staging and neighbor notice as real cost lines, not afterthoughts, because on these blocks they are.
Our technicians have up to 12 years of experience, they’re background-checked, and they show up in uniform. Every addition and ADU we build is covered by our 730-Day Done Right Promise. If something isn’t done right, we make it right, and that’s in writing before we start. Calls are answered by a live person 24/7, so a question about a UMS inspection date doesn’t wait until Monday.
What sets our Sunset work apart is permit fluency. Out-of-area builders file to a city building department that doesn’t exist for this address, and the project stalls for weeks. We pull through Miami-Dade UMS, sequence inspections in phases, and keep the draw schedule honest. Homeowners across the 33173 area come to us after exactly that kind of stall.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Sunset
Sunset’s tight lots and county permitting make the design and permitting phase the riskiest part of any project. Our Home Additions & ADU team handles the whole scope, foundation to finish line, on one contract.
ADU Design & Permitting in Sunset
Every ADU in Sunset goes through Miami-Dade UMS, so plan review and inspection scheduling run on county timelines. That routinely adds two to three weeks versus neighboring incorporated cities. We build that buffer into the schedule up front rather than discovering it mid-project. Design decisions get made with the setback and lot-coverage math in hand, not after the drawings are done.

New Detached ADU Construction in Sunset
A detached ADU on a small Sunset lot is a staging problem as much as a build. Materials land in the driveway or not at all, so deliveries are phased to match the work. Expect a typical detached ADU in Sunset to run $90,000 to $220,000 depending on size and utility runs. James Hardie siding and impact-rated glazing are common choices here, and for good reason in a hurricane zone.

Garage Conversion ADU in Sunset
Plenty of Sunset homes from the 1950s and 1960s have attached garages and carports that convert cleanly to living space. A garage conversion in Sunset typically runs $30,000 to $80,000. The catch is the original slab and roof structure, which often need upgrading to meet current wind-load and energy code before the space can be occupied.

Junior ADU & Interior Conversion in Sunset
Not every Sunset household needs a separate structure. A junior ADU carved from existing square footage usually costs less and moves faster through review. It works especially well in the older single-story homes along the interior streets, where a rear bedroom suite and a small kitchenette can be added without touching the roofline.
Second Story Additions in Sunset
When the lot won’t give you more footprint, you build up. A second story addition on a mid-century Sunset home almost always triggers a roof-to-wall retrofit and a structural review of the original framing, so the engineering scope matters more than the finish selections.
Trusted Brands We Service in Sunset
We build with a curated set of brand partners across every trade: James Hardie for fiber-cement siding that holds up to salt air and sun, KraftMaid for cabinetry in ADU kitchens, and Tuff Shed where a storage structure fits the plan. We don’t stock parts or materials in Sunset; the independent local professionals who do the work bring what the approved scope calls for. That keeps selections tied to your drawings instead of to whatever happens to be sitting around. You choose the material, and we build to it. Upfront pricing means the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Sunset Homes
- Permits filed to a city that doesn’t exist. Out-of-area builders submit to a nonexistent Sunset building department instead of Miami-Dade UMS, and the project sits for weeks before anyone catches it. We file to UMS from day one and track review status.
- Shared walls with no party-wall notice. Zero-lot-line additions need neighbor notification and a shared-wall agreement. Skip it and a complaint turns into a stop-work order fast.
- Materials staged in the street. Tight Sunset lots push deliveries over the property line or into the right-of-way, which draws code enforcement and stalls the draw schedule. Staging gets planned before the first delivery.
- Mid-century structure that fails current code. Homes built before the 1994 Florida Building Code often have single-pane windows and carport slabs that don’t meet wind-load or energy requirements. An addition has to retrofit those before it can close out.
Pricing for Home Additions & ADU in Sunset, FL
Sunset pricing reflects county permitting, tight-lot logistics and the code upgrades that mid-century homes demand. Here’s what our projects typically run, in honest ranges, with a free estimate to pin your exact number.
| Project | Typical Sunset Cost |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves your number: UMS review time, roof-to-wall retrofits, impact glazing, and how much staging access the lot allows. We give line-item quotes and no-hassle upfront pricing. The estimate is free, and 0% financing for 18 months is available, plus $1,000 off projects over $10,000. Call for a walk-through.
We Also Serve Cities Near Sunset
The same crews work throughout the surrounding communities. Homeowners in Westwood Lakes, Kendall, Richmond Heights and Kendale Lakes get the same county-fluent approach to permitting and the same written guarantees. If you’re just outside Sunset, we still know your blocks and your inspection timelines. Ask about Home Additions & ADU in Sunset and we’ll confirm coverage when you call.
Serving Sunset, FL – Our Local Coverage Area
We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Sunset
Yes, and the permit comes from Miami-Dade County’s Unincorporated Municipal Services (UMS), not a city building department. Sunset is unincorporated, so there is no local city hall issuing permits here. That’s why out-of-area builders who file to a city address stall for weeks. We pull through UMS and schedule inspections in phases, and we account for that in your quote.
It raises it, mainly through required code upgrades. Most Sunset homes were built in the 1950s through the 1970s, before the 1994 Florida Building Code, often with single-pane windows and carport slabs that don’t meet current wind-load or energy standards. A qualified general contractor has to scope a roof-to-wall retrofit and impact-glazing upgrade before the addition itself can close out. That’s real money, and it’s why a Sunset addition runs $45,000 to $130,000 rather than the lower figures you’ll see quoted for new construction out west.
Often yes, but it depends on setbacks and lot coverage, and it requires proper party-wall notice. On tight Sunset lots the zero-lot-line condition is common, so the neighbor notification and shared-wall agreement get filed before work begins. Get that wrong and a complaint becomes a stop-work order. We handle the paperwork and staging plan together. Call for a site visit and we’ll tell you what your lot can hold.
Plan on longer than a neighboring incorporated city, mainly because UMS review and inspection scheduling add time. County timelines routinely run two to three weeks beyond comparable city reviews, and a garage conversion or junior ADU moves faster than a detached build. We phase inspections so finished areas aren’t re-dug. Call for a realistic schedule tied to your address.
We plan neighbor communication into the scope from the start. On a Sunset add it means a written party-wall notice where walls are shared, quiet work-hour scheduling, and keeping materials off the public right-of-way so code enforcement doesn’t get called. Tight-lot staging is designed before the first delivery. Call for a free estimate and we’ll walk your lot and talk through the neighbor side.
Considering an addition or ADU on your Sunset property? Call (844) 761-9356 for a free estimate. A live person answers 24/7, we’ll bring a written line-item scope, and every project is backed by our 730-Day Done Right Promise.
Written by the team at Groundwork Construction Co..